Course modules
20 modules over 10 daysParticipants can define supervisory authority, daily responsibilities and escalation routes for a construction work package.
- Supervisor authority, delegation limits and contractual notice responsibilities
- Daily site routines linking safety, quality, progress and records
- Reporting lines between client, engineer, contractor and subcontractors
- Site induction content, access controls and supervisor handover protocol
- Professional conduct when directing work and escalating disputed instructions
- Personal supervision plan aligned with project milestones and work fronts
Participants can verify work requirements using current approved drawings, specifications and technical records.
- Reading IFC drawings, specifications, schedules and approved method statements
- Document control using revision registers, transmittals and distribution matrices
- Cross-checking architectural, structural and MEP interfaces before release
- Request for information workflow, response dates and impact tracking
- Submittal registers for materials, shop drawings and technical approvals
- Field verification against latest approved documents and marked-up changes
Participants can create short-term work plans linked to programme logic, resources and constraints.
- WBS decomposition into measurable work packages and inspection points
- CPM logic links, durations, constraints and critical-path interpretation
- Two-week look-ahead plans tied to labour, materials and access
- Constraint log ownership, due dates and removal escalation
- Daily coordination boards showing planned, completed and blocked activities
- Progress measurement rules using quantities, milestones and installed work
Participants can prepare work fronts with the access, materials, plant and controls needed for safe production.
- Site logistics plans covering laydown, lifting routes, welfare and traffic
- Temporary works coordination, permits and competent-person checks
- Plant allocation matched to production rates, exclusion zones and maintenance
- Material receiving inspections, storage controls and traceability records
- Access sequencing for crews, deliveries, inspections and emergency response
- Interface meetings resolving clashes between trades and work fronts
Participants can apply daily supervisory controls for hazardous construction activities and work permits.
- ISO 45001 duties translated into daily supervisory control actions
- Task risk assessments identifying hazards, controls and residual risk
- Permit-to-work controls for hot work, confined spaces and energisation
- Pre-task briefings using point-of-work hazard assessment techniques
- Stop-work intervention, incident preservation and immediate escalation procedures
- Safety observation cards distinguishing unsafe acts, conditions and controls
Participants can use inspection planning and defect controls to verify work against acceptance requirements.
- Inspection and test plans linking hold points and acceptance criteria
- Method statement review against specifications, drawings and manufacturer instructions
- First-work inspection process establishing acceptable workmanship benchmarks
- Nonconformance reports documenting defect, disposition, correction and verification
- Material certificates, batch records and traceability evidence requirements
- Punch-list management with ownership, closure dates and reinspection status
Participants can measure workforce and plant performance against planned outputs and production rates.
- Quantity take-offs from drawings, schedules and site measurement rules
- Daily labour reports capturing hours, outputs, delays and idle time
- Production-rate analysis comparing planned outputs with actual installed quantities
- Resource histograms identifying crew imbalances and upcoming labour peaks
- Plant utilisation records separating productive, standby and breakdown hours
- Weekly productivity dashboard using earned quantities and trend commentary
Participants can identify field decisions and records that affect committed cost, productivity and forecast cost.
- Cost codes aligned to work breakdown structure and reporting accounts
- Commitment tracking for purchase orders, subcontracts and approved changes
- Earned value measures: planned value, earned value and actual cost
- Forecast-to-complete calculations using production rates and remaining quantities
- Cost variance narratives separating scope, productivity, price and timing causes
- Supervisor actions to prevent unrecorded work and uncontrolled expenditure
Participants can recognise change and delay events and maintain records for timely escalation.
- Contract document hierarchy and supervisor authority under delegated instructions
- FIDIC-style notice triggers for delay, change, access and unforeseen conditions
- Contemporaneous records supporting entitlement, causation and time impact
- Site instructions distinguished from variations, clarifications and corrective directions
- Change register recording scope, valuation status, notices and approvals
- Escalation routes for disputed work, defective instructions and withheld access
Participants can issue clear instructions and coordinate multiple parties through structured communication routines.
- Daily coordination meetings structured around safety, work fronts and constraints
- RACI matrix for approvals, inspections, information requests and handovers
- Shift handover logs recording status, hazards, permits and outstanding actions
- Clear field instructions using location, task, standard, deadline and evidence
- Meeting minutes with decisions, owners, due dates and closure checks
- Conflict de-escalation using facts, contractual references and agreed next steps
Participants can inspect common structural and concrete activities against approved technical requirements.
- Survey control checks for benchmarks, gridlines, levels and set-out
- Earthworks inspection of formation, compaction tests and moisture conditioning
- Concrete placement controls for formwork, reinforcement, cover, slump and curing
- Rebar inspection against bar schedules, lap lengths and approved details
- Pour cards, cube tests and curing records for concrete traceability
- Structural defects assessed through NCR process and engineer referral
Participants can control quality and interface risks in envelope, roofing and finishing works.
- Masonry tolerances, line, level, plumb and joint workmanship checks
- Waterproofing inspections covering substrate preparation, laps, terminations and protection
- Roofing hold points for falls, penetrations, drainage and membrane integrity
- Facade interface checks between structure, glazing, sealants and flashings
- Mock-up approval criteria carried into repetitive installation inspections
- Weather protection planning for exposed work and moisture-sensitive materials
Participants can coordinate building services interfaces and verify installation readiness for testing and commissioning.
- MEP coordination drawings checked against structural openings and ceiling zones
- Builder's-work interfaces for sleeves, embeds, trenches and equipment bases
- Installation inspections for supports, clearances, identification and access
- Pressure testing, flushing and commissioning prerequisites tracked by system
- Electrical energisation controls, isolation records and authorised-person boundaries
- Systems handover evidence: test sheets, O&M data and training records
Participants can assess schedule status, document disruptions and support practical recovery actions.
- Baseline programme review using logic, calendars, constraints and milestones
- Daily records capturing weather, labour, plant, deliveries and disruptions
- Delay classification: employer, contractor, neutral, concurrent and excusable events
- Time-impact analysis inputs: affected activities, logic changes and fragnet assumptions
- Recovery plans using resequencing, additional resources and extended working hours
- Weekly progress reports combining narrative, photos, quantities and schedule status
Participants can supervise environmental controls and maintain evidence of site compliance actions.
- Environmental aspect registers covering dust, noise, waste, water and spills
- Site waste segregation, transfer notes and disposal record controls
- Sediment control inspections after rainfall and before discharge events
- Community complaint logs, response commitments and closure evidence
- Archaeological or ecological finds managed through stop-work notification procedures
- Environmental incident reports recording containment, sampling, causes and corrective actions
Participants can identify, assess, control and escalate project risks affecting construction work packages.
- Risk register entries with cause, event, consequence, owner and response
- Bow-tie analysis linking preventive barriers, recovery controls and escalation
- Interface risks assessed across simultaneous operations and restricted access
- Early-warning indicators derived from safety, quality, schedule and cost data
- Weekly risk reviews updating scores, actions, assumptions and residual exposure
- Contingency actions prepared for weather, supply disruption and utility strikes
Participants can produce controlled digital records that support site decisions and audit trails.
- Mobile inspection forms configured with location, criteria, photos and signatures
- Photo records indexed by date, work package, location and issue
- Drawing markup conventions preserving revision status and audit trail
- Dashboard data validation before publication to client and project leadership
- Common data environment permissions controlling approved-document access and distribution
- Daily report templates integrating quantities, manpower, weather and key events
Participants can plan completion activities, close defects and assemble evidence for project handover.
- Systematic completion planning from work-package turnover to final acceptance
- Commissioning matrix assigning prerequisites, tests, witnesses and documentation
- Snagging strategy separating incomplete work, defects and client observations
- As-built verification against installed conditions, approved changes and survey data
- O&M manual registers tracking submissions, review comments and acceptance
- Defects-liability planning for response times, warranties and closeout records
Participants can direct site teams through clear delegation, coaching, correction and ethical escalation.
- Situational leadership matched to competence, commitment and task risk
- Delegation briefings defining expected standard, authority, deadline and feedback
- Coaching conversations using observation, evidence, agreed action and follow-up
- Fair performance correction documented through facts, expectations and consequences
- Multicultural crew communication using plain language, demonstration and confirmation
- Ethical escalation of bribery, falsified records and unsafe production pressure
Participants can build, review and present a complete site supervision control dossier for a construction work package.
- Project brief analysis defining scope, stakeholders, constraints and supervisor authority
- Integrated two-week plan combining sequence, resources, inspections and permits
- Site control dossier including safety, quality, progress, cost and risk registers
- Change scenario assessment using notices, records, time impact and escalation
- Daily report and coordination agenda prepared from simulated field information
- Peer review against contractual requirements, acceptance criteria and reporting standards
- Formal presentation defending priorities, evidence, actions and recovery recommendations
Exercises and examples are adapted to each cohort's sectors and roles.