Course modules
19 modules over 10 daysParticipants can define HSE responsibilities, accountabilities and reporting lines for a construction project.
- Client, principal contractor and subcontractor duties within project governance arrangements
- HSE leadership responsibilities from project director to frontline supervisor
- Competence matrices linking roles, training, authorisation and supervision requirements
- Site organisation charts showing escalation routes for safety concerns
- Legal register structure covering applicable construction laws and permit conditions
- Worker consultation arrangements through toolbox talks, committees and safety representatives
Participants can apply ISO 45001 and ISO 14001 concepts to site management arrangements.
- ISO 45001 context, leadership, planning, support and operational-control requirements
- ISO 14001 environmental aspects, impacts, objectives and operational controls
- Interested-party requirements from clients, authorities, neighbours and workforce representatives
- Documented information controls for procedures, records, revisions and distribution
- Plan-Do-Check-Act cycle applied to site HSE performance management
- Management review inputs, decisions, actions and evidence of follow-through
Participants can produce task-specific risk assessments for construction work activities.
- Task breakdown identifies work steps, equipment, people and interfaces
- Hazard categories covering physical, chemical, biological, ergonomic and psychosocial exposures
- Risk matrix criteria calibrated for likelihood, consequence and existing controls
- Hierarchy of controls prioritises elimination before administrative and personal protective measures
- Residual-risk decisions documented with accountable persons and review triggers
- Dynamic risk assessment methods for changing conditions and unplanned work
Participants can assemble the core sections of a project HSE plan before mobilisation.
- HSE plan scope aligned with contract requirements and construction sequence
- Project objectives translated into measurable leading and lagging indicators
- Mobilisation checklists covering welfare, access, boundaries, signage and emergency equipment
- Site rules specify mandatory behaviours, prohibited activities and enforcement arrangements
- Communication plan maps briefings, inductions, alerts and multilingual materials
- HSE budget provisions cover training, monitoring, welfare and specialist controls
Participants can assess contractor capability and control HSE interfaces between work packages.
- Prequalification criteria assess competence, incident history, resources and management arrangements
- Tender HSE evaluations distinguish documented commitments from verifiable delivery capability
- Contract clauses define HSE obligations, reporting thresholds and audit rights
- Interface registers identify simultaneous operations and shared-area responsibilities
- Subcontractor mobilisation reviews verify personnel, plant, documents and emergency arrangements
- Performance meetings use action logs, trend data and agreed accountability
Participants can establish induction and workforce engagement arrangements that support safe work.
- Site induction content covers hazards, rules, welfare, reporting and emergencies
- Competency verification checks licences, certificates, experience and task authorisations
- Toolbox talk planning links briefings to current work and incident trends
- Pre-task briefings confirm controls, roles, changing conditions and worker questions
- Stop-work authority communicates intervention expectations without disciplinary retaliation
- Safety observation programmes distinguish coaching conversations from fault-finding inspections
Participants can design permit-to-work arrangements for controlled high-risk construction activities.
- Permit-to-work system defines issuer, receiver, isolator and performing authority roles
- Hot-work permits control ignition sources, fire watches and combustible materials
- Confined-space permits address atmospheric testing, rescue and entry supervision
- Electrical isolation uses lockout-tagout registers, test-before-touch and controlled re-energisation
- Excavation permits confirm service searches, shoring and access arrangements
- Permit handover procedures maintain control across shift changes and work interruptions
Participants can specify controls for work at height and temporary works activities.
- Work-at-height hierarchy selects avoidance, collective protection and personal fall protection
- Scaffold inspection tags record status, restrictions, inspector and inspection dates
- Fall-arrest plans address anchor points, clearance, rescue and suspension trauma
- Temporary works coordination defines design checks, approvals and change control
- Formwork and falsework inspections verify stability before loading or concrete placement
- Roof-work controls address fragile surfaces, edge protection and weather conditions
Participants can plan controls for lifting operations, mobile plant and pedestrian separation.
- Lift plans define load weight, radius, crane capacity and exclusion zones
- Appointed-person duties coordinate lifting studies, supervision and communication arrangements
- Rigging inspections verify slings, shackles, hooks and lifting accessories
- Traffic management plans separate pedestrians, vehicles, plant and delivery movements
- Plant pre-use checks cover brakes, alarms, guards, visibility and maintenance
- Banksman signals and radio protocols control reversing and restricted-visibility operations
Participants can manage excavation hazards and underground-service controls on civil works.
- Utility searches combine drawings, permit records, surveys and cable-avoidance tools
- Excavation support systems address soil conditions, depth, loading and water ingress
- Spoil-pile placement prevents surcharge loading near excavation edges
- Safe access arrangements use ladders, stairs or engineered access systems
- Inspection frequencies respond to weather, ground movement and changing conditions
- Barricades and edge protection protect workers and public from open excavations
Participants can plan occupational health controls and welfare provisions for construction workers.
- Occupational health risk assessments identify exposure routes, duration and susceptible groups
- Silica-dust controls combine wet methods, extraction, respiratory protection and monitoring
- Noise assessments define exposure action values, hearing protection and health surveillance
- Heat-stress plans schedule work, hydration, shade, acclimatisation and supervision
- Welfare facilities provide sanitation, washing, drinking water, rest and changing areas
- Health surveillance arrangements follow identified exposure risks and competent medical advice
Participants can establish environmental controls for significant construction activities and emergencies.
- Aspect-impact registers rank environmental significance using defined assessment criteria
- Waste-management plans apply segregation, storage, transfer documentation and licensed disposal
- Spill-prevention controls address fuel storage, bunding, refuelling and emergency materials
- Dust and emissions controls use suppression, monitoring, maintenance and scheduling
- Water-management measures control silt, dewatering discharge and contaminated runoff
- Biodiversity protection identifies exclusion zones, seasonal restrictions and ecological permits
Participants can prepare and test emergency arrangements for foreseeable construction incidents.
- Emergency scenarios include fire, collapse, spill, rescue and severe weather
- Emergency response plans assign incident command, communication and evacuation responsibilities
- Rescue plans address suspended workers, confined spaces and excavation emergencies
- Muster-point design considers access, headcounts, visitors and changing site layouts
- Emergency drills test response times, communications, equipment and decision making
- Post-drill reviews capture findings, assigned actions and retest requirements
Participants can conduct evidence-based site inspections and plan compliance assurance activities.
- Inspection schedules target high-risk work, critical controls and changing conditions
- Checklist design links observations to legal requirements and site procedures
- Evidence sampling records photographs, interviews, documents and physical observations
- Audit findings classify nonconformities, observations, risks and good practices
- Corrective-action registers assign owners, deadlines, verification and overdue escalation
- Trend analysis identifies repeated findings, weak controls and systemic causes
Participants can investigate construction incidents and specify actions that address underlying control failures.
- Incident reporting thresholds cover injuries, near misses, property damage and environmental events
- Initial response preserves evidence while securing people, plant and work areas
- Timeline analysis reconstructs events, conditions, decisions and control breakdowns
- Five Whys analysis tests causal chains beyond immediate worker actions
- Bowtie method maps threats, preventive barriers, recovery measures and escalation factors
- Corrective actions address system causes, ownership, deadlines and effectiveness verification
Participants can build HSE performance measures and reporting routines for project leadership.
- Leading indicators track inspections, observations, training, permit quality and action closure
- Lagging indicators measure injuries, damage, spills, lost time and severity
- Total recordable incident rate calculations use agreed exposure-hour definitions
- Dashboard design separates project trends, contractor performance and critical-control assurance
- Monthly HSE reports communicate material risks, actions, trends and decisions required
- Data-quality checks test completeness, timeliness, classification and source evidence
Participants can use leadership and behavioural methods to strengthen frontline HSE performance.
- Visible felt leadership demonstrates management presence, listening and action follow-up
- Just-culture principles distinguish human error, at-risk behaviour and reckless conduct
- Behavioural observations identify conditions, cues, consequences and barriers to safe work
- Positive reinforcement recognises critical-control compliance and constructive safety interventions
- Supervisor coaching uses questions, feedback and agreed behavioural commitments
- Learning teams examine normal work, workarounds and operational constraints
Participants can manage HSE implications of change and retain learning at project closeout.
- Management-of-change screening assesses scope, design, programme and organisational modifications
- Change approvals verify revised risk assessments, permits, drawings and communications
- Commissioning HSE controls address energisation, testing, handover and operational interfaces
- Demobilisation planning manages removal activities, waste, access changes and residual hazards
- Lessons-learned reviews convert project experience into reusable organisational knowledge
- Closeout records archive permits, inspections, incidents and environmental documentation
Participants can build, review and present a complete project HSE management system for a construction scenario.
- Project HSE plan integrates scope, responsibilities, legal duties and objectives
- Risk register prioritises high-risk activities, controls, owners and review dates
- Permit matrix connects controlled activities with authorisations and verification requirements
- Inspection programme targets critical controls, frequencies, evidence and escalation routes
- Emergency and environmental plans address credible project-specific incident scenarios
- Peer review tests completeness, practicality, accountability and presentation of the system
Exercises and examples are adapted to each cohort's sectors and roles.