Course modules
19 modules over 10 daysParticipants can define project governance, delivery roles and stage-gate decisions for a construction project.
- Project life cycles from feasibility through commissioning and closeout
- Owner, designer, contractor and superintendent responsibilities under common delivery models
- Stage-gate decisions linking scope maturity, cost certainty and risk
- Project success criteria: safety, quality, schedule, cost and stakeholder acceptance
- Construction manager authority limits, delegation routes and decision-rights registers
- Systems view of interfaces between design, procurement, construction and operations
Participants can establish a project charter, stakeholder priorities and accountability structure.
- Business case assumptions tested against site, market, funding and regulatory constraints
- Project charter defining objectives, exclusions, governance, tolerances and approval authority
- Stakeholder mapping using power-interest grids and influence assessment
- RACI matrix for client, consultant, contractor and supplier accountabilities
- Requirements traceability matrix linking employer needs to design and acceptance
- Early-warning log recording emerging threats, owners, actions and decision dates
Participants can define controllable construction scope and establish work package boundaries.
- Scope statement distinguishing deliverables, exclusions, assumptions and acceptance criteria
- Work breakdown structure decomposed to controllable construction work packages
- Control accounts connecting WBS elements, budgets, schedules and responsibility
- Work-package definition with quantities, boundaries, handoffs and completion rules
- Requirements change log linked to drawings, specifications and approvals
- Scope validation using inspection points, test records and client sign-off
Participants can manage design information, coordination responsibilities and construction readiness.
- Design responsibility matrix allocating production, review, approval and coordination duties
- Design programme aligned with procurement lead times and construction release dates
- Drawing register controlling revision status, distribution and superseded information
- BIM execution plan defining information exchanges, model ownership and coordination
- Constructability reviews identifying access, sequencing, temporary works and tolerances
- Design change workflow from technical query through authorised instruction
Participants can develop a logic-linked programme that reflects construction sequence and interfaces.
- Activity lists derived from work packages, interfaces and physical handoffs
- Precedence diagramming method using finish-to-start, start-to-start and lag relationships
- Critical path method calculating early dates, late dates and total float
- Three-point duration estimates using optimistic, most likely and pessimistic values
- Rolling-wave planning refining near-term activities as design information matures
- Milestone schedule linking permits, procurement, inspections, energisation and handover
Participants can establish a baseline programme and convert it into field-ready planning controls.
- Baseline programme logic checked for open ends, constraints and excessive lags
- Primavera P6 calendars, activity codes and coding structures configured
- Resource-loaded schedules testing crew availability, plant capacity and workfront access
- Schedule narrative explaining assumptions, critical paths, constraints and recovery actions
- Look-ahead plans translating master schedules into six-week field commitments
- Progress updates using actual dates, remaining durations and approved changes
Participants can prepare a traceable cost baseline aligned to scope and programme controls.
- Estimate basis documenting quantities, rates, exclusions, escalation and contingency
- Cost breakdown structure aligned with work packages and cost-control accounts
- Quantity take-off checks against drawings, specifications and measurement rules
- Direct costs separated from preliminaries, overheads, profit and risk allowances
- Parametric, analogous and bottom-up estimating methods compared for accuracy
- Cost plan reconciliation between estimate, tender, budget and control baseline
Participants can forecast cost performance and funding requirements from project control data.
- Time-phased budget establishing planned value across approved control accounts
- Earned value measured through weighted milestones, physical progress and quantities
- Cost performance index and schedule performance index interpreted correctly
- Estimate at completion forecast from actual costs and performance indices
- Cash-flow forecast combining commitments, valuations, retention and payment terms
- Cost report distinguishing committed, incurred, forecast and final-account exposures
Participants can identify, assess, respond to and report construction project risks.
- Risk breakdown structure grouping technical, commercial, environmental and interface risks
- Probability-impact matrix prioritising threats and opportunities for management attention
- Risk register assigning causes, consequences, responses, owners and review dates
- Monte Carlo schedule risk analysis concepts and interpretation limits
- Contingency drawdown governed through thresholds, approvals and change records
- Quantitative risk allowances separated from contractor pricing contingencies
Participants can plan procurement activities and control critical supplier and subcontractor commitments.
- Make-or-buy analysis considering capability, risk allocation, lead time and cost
- Procurement schedule integrating bid periods, approvals, manufacture and delivery
- Bid package scopes preventing gaps between trade contractors and suppliers
- Technical and commercial bid evaluation using weighted criteria and clarifications
- Long-lead equipment register tracking submittals, fabrication, testing and shipment
- Purchase order controls covering scope, milestones, warranties and expediting
Participants can apply contract administration principles to notices, changes and payment events.
- Delivery models: design-bid-build, design-build, EPC and construction management compared
- NEC4 ECC early warnings, compensation events and programme duties
- FIDIC Red Book roles, notices, claims and engineer determinations
- Contract particulars identifying payment mechanisms, securities, insurance and damages
- Notice requirements tracked through correspondence registers and contractual time bars
- Change orders priced, authorised and incorporated into revised baselines
Participants can maintain reliable project records that support delivery decisions and contractual evidence.
- Document control protocols assigning metadata, revision codes, transmittals and retention
- Request for information workflow recording question, response, impact and closure
- Site instructions distinguished from contractual variations and design clarifications
- Meeting minutes recording decisions, actions, due dates and accountable owners
- Submittal register controlling shop drawings, samples, approvals and resubmissions
- Correspondence logs preserving evidence for payment, delay and dispute matters
Participants can establish quality controls from specification review through defect correction and handover.
- Project quality plan linking specifications, inspection points and acceptance records
- Inspection and test plans defining hold points, witnesses and tolerances
- First-work inspections confirming workmanship standards before repetitive production begins
- Nonconformance reports documenting defects, root causes, correction and verification
- ISO 9001 quality principles applied to construction document and process controls
- Snagging lists prioritised by safety, functionality, completion and handover impact
Participants can integrate safety and environmental controls into construction planning and supervision.
- Construction phase safety plan identifying hazards, controls and responsible persons
- Hierarchy of controls applied to elimination, substitution, engineering and PPE
- Task risk assessments and method statements reviewed before site activities
- Permit-to-work systems controlling high-risk operations, isolations and authorisations
- Incident investigation using five whys, barrier analysis and corrective actions
- Environmental management controls for waste, dust, noise, water and spills
Participants can coordinate labour, plant, logistics and temporary works against programme commitments.
- Resource histograms exposing labour peaks, plant clashes and subcontractor constraints
- Resource levelling adjusted against float, productivity rates and access constraints
- Crew production rates calculated from quantities, outputs and working hours
- Site logistics plan coordinating access, laydown, hoisting, welfare and traffic
- Temporary works interfaces managed through design checks, permits and inspections
- Daily coordination boards resolving workfront conflicts and planned handovers
Participants can measure project performance, report exceptions and prepare recovery actions.
- Progress measurement rules established before work starts and baseline approval
- Weekly reporting integrates safety, quality, progress, cost, risk and decisions
- Schedule variance analysis separates critical delay, disruption and recoverable slippage
- Recovery plans test resequencing, acceleration, additional resources and productivity improvements
- Trend registers capture potential changes before cost or time crystallises
- Management dashboards present exceptions, forecasts, actions and escalation requirements
Participants can manage stakeholder expectations, project interfaces and emerging disagreements constructively.
- Stakeholder engagement plan sets messages, channels, frequency and accountable owners
- Community liaison addresses access, noise, working hours and complaint resolution
- Interface matrix coordinates utilities, authorities, adjacent projects and operations teams
- Negotiation preparation identifies interests, BATNA, concessions and settlement limits
- Conflict resolution uses factual records, escalation paths and facilitated meetings
- Change communication explains impacts, decisions, dates and required responses
Participants can plan orderly commissioning, handover, final account and lessons learned activities.
- Commissioning plan sequences pre-commissioning, testing, witnessing and operational readiness
- Systems completion tracks mechanical completion, punch lists and turnover boundaries
- O&M manuals, asset data and warranties verified against handover requirements
- Training records demonstrate operator readiness for installed systems and controls
- Final account preparation reconciles variations, claims, retention and outstanding liabilities
- Lessons learned reviews capture causes, outcomes, recommendations and assigned actions
Participants can build, review and present a complete integrated project execution plan for a construction project.
- Integrated project execution plan assembled from scope, schedule, cost and risk baselines
- Work breakdown structure and responsibility matrix define delivery accountabilities
- Logic-linked baseline programme identifies critical path, milestones and key constraints
- Cost-loaded control budget and cash forecast support funding decisions
- Risk register, procurement plan and quality controls address delivery exposures
- Contract administration and reporting routines establish governance and escalation
- Executive presentation defends assumptions, forecasts, controls and recovery decisions
Exercises and examples are adapted to each cohort's sectors and roles.








