Course modules
16 modules over 10 daysParticipants can distinguish quality planning, quality assurance, quality control and acceptance responsibilities on a construction project.
- Quality planning, assurance, control and acceptance roles on projects
- Cost of quality: prevention, appraisal, failure and rework costs
- Contract documents establishing quality obligations and acceptance requirements
- Roles of client, consultant, contractor and subcontractor quality personnel
- PDCA cycle applied to construction work-package control
- Quality interfaces with safety, programme, cost and commissioning
Participants can identify applicable quality requirements and convert them into project control obligations.
- ISO 9001 clauses relevant to construction project quality systems
- ISO 10005 guidance for project quality plan development
- Specifications, drawings, codes and standards as acceptance sources
- Document hierarchy resolving conflicts between contractual technical requirements
- Regulatory approvals, permits and inspection authority requirements
- Quality requirements register linking documents, activities and responsible parties
Participants can prepare a project quality plan structured around scope, risks, controls and records.
- Project quality plan structure, scope, responsibilities and approval routes
- Quality objectives stated as measurable project performance targets
- Risk-based thinking applied to critical construction activities
- Quality risk register using likelihood, consequence and control ratings
- Process maps connecting work packages, inspections and quality records
- Document control procedures for revisions, distribution and superseded documents
Participants can review technical requirements and manage quality risks created by incomplete or conflicting design information.
- Requirements review before procurement, mobilization and work-package release
- Drawing and specification coordination using interdisciplinary review matrices
- Request for information process for ambiguous technical requirements
- Design change control preserving approvals, revisions and field instructions
- Constructability reviews identifying access, tolerance and sequencing risks
- Technical submittal registers tracking required approvals and response dates
Participants can define controlled work methods, responsibilities and acceptance criteria for construction activities.
- Method statement components: sequence, resources, controls and acceptance criteria
- Work-package planning aligned with drawings, specifications and inspection plans
- Pre-installation meetings confirming readiness, interfaces and quality responsibilities
- First-off inspections establishing agreed workmanship standards before production
- Mock-ups and benchmarks for finishes, assemblies and repeatable work
- Daily supervision records capturing conditions, instructions and completed checks
Participants can develop inspection and test plans with defined control points, evidence and acceptance criteria.
- Inspection and test plan structure for construction work activities
- Hold points, witness points, surveillance points and review points
- Acceptance criteria extracted from specifications, codes and approved submittals
- Inspection frequency determined by risk, volume and criticality
- Responsibility matrices assigning contractor, consultant and client inspection actions
- ITP records linking activity, inspection result, signature and release
Participants can establish material approval, receiving inspection and traceability controls for project materials.
- Material submittals checked against specifications, schedules and approved manufacturers
- Receiving inspections verifying quantity, condition, certificates and identification
- Material traceability from delivery docket to installed location
- Mill certificates, test certificates and declarations of conformity
- Storage controls preventing damage, contamination, deterioration and incorrect issue
- Quarantine procedures for rejected, damaged or unapproved materials
Participants can assess workmanship against defined benchmarks, tolerances and approved installation requirements.
- Workmanship standards translated into observable site inspection criteria
- Dimensional control using benchmarks, datums, grids and survey records
- Tolerance schedules applied to concrete, steelwork and finishing activities
- Sample panels establishing approved appearance and installation quality
- Trade interface checks preventing defects at construction handovers
- Photographic records documenting concealed works and completed benchmarks
Participants can manage construction testing programmes and evaluate the reliability of test evidence.
- Testing schedules linked to material batches and construction milestones
- Sampling procedures protecting representativeness, identification and chain of custody
- Concrete testing records: slump, cubes, curing and strength results
- Calibration registers for measuring equipment, gauges and testing instruments
- Laboratory reports reviewed against specified limits and acceptance criteria
- Failed test escalation, investigation and disposition decision records
Participants can conduct site inspections and compile complete records supporting work acceptance.
- Inspection preparation using approved drawings, ITPs and checklists
- Objective evidence gathered through observation, measurement and record review
- Inspection reports stating location, activity, criteria and result
- Sign-off controls preventing unauthorized progression beyond hold points
- Digital field records managed with naming conventions and revision status
- Daily quality reports highlighting inspections, issues and pending actions
Participants can control nonconforming work from identification through corrective-action verification and closure.
- Nonconformance report content: requirement, evidence, location and disposition
- Immediate containment actions preventing further defective work installation
- Disposition options: rework, repair, use-as-is, reject or replace
- 5 Whys analysis identifying systemic causes beyond immediate error
- Fishbone diagrams examining people, methods, materials and equipment causes
- Corrective action plans with owners, dates, verification and closure evidence
Participants can plan, conduct and report internal quality audits against project procedures and ISO 19011 principles.
- ISO 19011 principles governing objective, evidence-based internal audits
- Audit programmes prioritized by risk, performance and previous findings
- Audit checklists derived from procedures, ITPs and contract requirements
- Opening meetings setting audit scope, evidence needs and logistics
- Interview techniques testing whether documented controls operate consistently
- Audit findings classified, reported and followed through to closure
Participants can evaluate and control subcontractor and supplier quality performance from appointment through completion.
- Prequalification criteria assessing competence, systems, resources and past performance
- Quality requirements incorporated into purchase orders and subcontract agreements
- Supplier quality plans reviewed before manufacture or site delivery
- Factory acceptance tests witnessing critical equipment and fabricated assemblies
- Subcontractor performance reviews using inspection results and nonconformance trends
- Escalation routes for repeated defects, missed inspections and overdue actions
Participants can measure quality performance and use evidence to prioritize improvement actions.
- Quality KPIs: defect rate, rework cost, inspection pass rate
- Pareto charts prioritizing recurring defect categories and locations
- Trend analysis of nonconformances, corrective actions and inspection outcomes
- Control charts distinguishing common-cause and special-cause variation
- Lessons learned registers converting project issues into future controls
- Management review reports presenting risks, performance and improvement actions
Participants can plan quality close-out, commissioning evidence and defects management for project handover.
- Commissioning plans connecting installation checks, tests and operational acceptance
- System turnover packages compiling certificates, reports and approved records
- Punch-list management assigning owners, dates and verification requirements
- As-built drawings controlled through field mark-ups and final revisions
- Operation and maintenance manuals checked for completeness and approvals
- Defects liability procedures tracking notification, rectification and closure
Participants can build, review and present a complete quality management package for a defined construction project scope.
- Project scope review identifying critical quality requirements and risks
- Quality plan drafted with responsibilities, procedures and document controls
- Inspection and test plans prepared for selected critical work packages
- Material control, nonconformance and corrective-action workflows integrated
- Audit checklist and quality dashboard completed from project evidence
- Peer review and presentation of the completed quality management package
Exercises and examples are adapted to each cohort's sectors and roles.