Course modules
18 modules over 10 daysParticipants can define project sustainability priorities and convert them into managed delivery objectives.
- Sustainability value drivers: carbon, resource efficiency, health, biodiversity and social value
- Project life-cycle decisions from feasibility through construction, handover and operation
- Client brief requirements translated into measurable delivery objectives and accountabilities
- Triple bottom line assessed alongside cost, programme, quality and safety
- Stakeholder mapping for clients, designers, contractors, communities and regulators
- Materiality assessment prioritising significant impacts, risks and project opportunities
Participants can establish governance arrangements for sustainability requirements and project decisions.
- EN 15978 life-cycle modules and project reporting boundaries
- ISO 14001 environmental management system principles applied to construction projects
- BREEAM credits interpreted as design, procurement and site delivery requirements
- Responsibility assignment matrix for client, designer, contractor and subcontractor actions
- Sustainability clauses embedded within employer's requirements and work packages
- Design-stage gateways used to confirm evidence, approvals and change decisions
Participants can identify significant environmental aspects and establish proportionate project controls.
- Site environmental baseline covering receptors, constraints, permits and sensitive locations
- Aspect-impact register scored by likelihood, consequence, control effectiveness and priority
- Construction environmental management plan structure, ownership and approval process
- Legal register tracking permits, consent conditions, monitoring and reporting duties
- Pre-construction surveys for ecology, contamination, drainage and heritage constraints
- Environmental risk register linked to method statements and inspection schedules
Participants can prepare a practical whole-life carbon strategy for a construction project.
- Whole-life carbon stages A1-A5, B modules, C modules and Module D
- Carbon baseline assembled from quantities, environmental product declarations and assumptions
- Embodied-carbon hotspots identified within structure, envelope, finishes and services
- Construction-stage emissions calculated for transport, plant, energy and temporary works
- Carbon reduction hierarchy applied before offsetting residual project emissions
- Carbon register records assumptions, design changes, actions and approval decisions
Participants can evaluate material and design choices against carbon, cost and performance criteria.
- Option appraisal comparing retained structures, new build and adaptive reuse
- Material passports record composition, disassembly potential and recovery routes
- Environmental product declarations checked for product scope, data quality and validity
- Low-carbon concrete specifications address cement replacement, strength and curing requirements
- Steel reuse assessed through traceability, testing, fabrication and liability evidence
- Whole-life cost analysis compares capital cost, maintenance, replacement and end-of-life value
Participants can create waste prevention and resource recovery controls for site delivery.
- Waste hierarchy applied to design, procurement, storage, installation and demolition
- Site waste management plan assigns streams, targets, records and responsibilities
- Pre-demolition audit identifies salvageable materials, hazardous items and recovery routes
- Segregation layouts support timber, metal, plasterboard, plastics and inert materials
- Take-back schemes evaluated for packaging, pallets, fixtures and surplus materials
- Waste data reconciled using transfer notes, weights, destinations and recovery percentages
Participants can plan water efficiency and pollution controls for construction activities.
- Water balance identifies demand, sources, reuse opportunities and discharge points
- Construction water management plan covers metering, targets, leaks and responsibilities
- Sustainable drainage measures protect receiving waters during temporary works
- Silt control uses settlement tanks, filter media, check dams and inspections
- Concrete washout procedures prevent alkaline runoff and drainage contamination
- Spill response plans define containment equipment, reporting and remediation actions
Participants can reduce energy and fuel use through planned site management measures.
- Site energy baseline separates cabins, lighting, plant, lifts and temporary power
- Energy action plan sets meter ownership, targets, reviews and corrective actions
- Plant selection compares electric, hybrid, diesel and renewable fuel options
- Idle-time controls use telematics, shutdown procedures and operator briefings
- Temporary works design reduces material consumption, rework and repeat installations
- Generator sizing matches load profiles, battery storage and demand management
Participants can embed sustainability requirements into purchasing and subcontract management.
- Procurement plan identifies sustainability risks by package, supplier and delivery stage
- Prequalification questions test environmental controls, carbon data and ethical sourcing
- Tender evaluation matrix weights price, quality, carbon, circularity and social value
- Supplier code of conduct addresses labour standards, sourcing and environmental requirements
- Chain-of-custody evidence verified for timber, aggregates and responsible materials
- Subcontract order clauses define data submissions, targets, inspections and remedies
Participants can integrate sustainability actions with project budgets, schedules and change control.
- Cost plan identifies sustainability allowances, savings, risks and contingency requirements
- Value engineering distinguishes genuine optimisation from removal of performance requirements
- Programme logic links surveys, approvals, procurement lead times and installation activities
- Change-control forms assess carbon, waste, environmental and social value consequences
- Life-cycle cost comparisons support investment decisions beyond initial capital expenditure
- Early contractor involvement tests buildability, sequencing and low-impact delivery options
Participants can prepare logistics controls that reduce transport impacts and local disruption.
- Construction logistics plan maps delivery routes, booking systems and consolidation opportunities
- Vehicle management controls engine idling, emissions standards and driver conduct
- Freight consolidation reduces part-load deliveries, congestion and packaging waste
- Dust management combines source suppression, monitoring, cleaning and weather controls
- Noise and vibration plans define limits, monitoring locations and notification procedures
- Community liaison protocols manage complaints, access constraints and construction notices
Participants can manage ecological and community commitments during construction delivery.
- Ecological constraints plan identifies protected species, habitats and seasonal restrictions
- Biodiversity net gain commitments translated into construction protection measures
- Tree protection zones managed through fencing, access controls and inspections
- Soil management plans separate stripping, storage, testing and reuse requirements
- Community benefits plan records local employment, training and supplier commitments
- Grievance mechanisms document stakeholder concerns, responses, escalation and closure
Participants can operate an ISO 14001-aligned environmental management system on a project.
- Environmental policy translated into project objectives, procedures and behavioural expectations
- Operational control procedures cover high-risk activities and subcontractor interfaces
- Toolbox talks communicate environmental risks, controls and reporting routes
- Inspection checklists test storage, drainage, waste, noise and housekeeping conditions
- Nonconformity process records findings, root causes, actions and verification
- Management review evaluates performance trends, resources, risks and improvement priorities
Participants can build reliable sustainability data collection and reporting arrangements.
- Key performance indicators defined with formulas, owners, sources and reporting frequency
- Data quality checks test completeness, consistency, traceability and unusual variances
- Carbon dashboard tracks baseline, forecast, actual emissions and reduction actions
- Waste dashboard reports quantities, recovery rates, contamination and disposal costs
- Environmental inspection trends identify recurring failures and priority interventions
- Monthly sustainability report combines progress, evidence, risks and corrective actions
Participants can prepare project evidence for internal audits, client reviews and certification assessments.
- Audit plan defines scope, criteria, sampling methods, interviews and reporting
- Evidence register links requirements, documents, photographs, records and approvals
- Internal audit findings classified by severity, cause, action owner and deadline
- BREEAM evidence tracker monitors credits, responsibilities, submissions and assessor queries
- Document control protects revision status, retention periods and approval traceability
- Close-out reviews confirm corrective-action effectiveness before formal verification
Participants can account for climate-related risks in construction planning and site controls.
- Climate risk assessment considers heat, rainfall, flooding, wind and supply disruption
- Weather contingency plans define triggers, responsibilities, communications and recovery actions
- Flood response procedures protect materials, plant, workers and nearby receptors
- Heat-stress controls integrate work scheduling, welfare provisions and supervision
- Material supply risk assessed for carbon constraints, scarcity and transport disruption
- Risk treatment plans assign preventative controls, contingency measures and residual ratings
Participants can organise people, controls and decisions required to deliver project sustainability targets.
- Sustainability implementation roadmap sequences actions from mobilisation through project closeout
- RACI matrix allocates accountable, responsible, consulted and informed project roles
- Subcontractor induction includes environmental rules, targets, reporting and consequences
- Behavioural observations identify barriers to consistent environmental control implementation
- Meeting cadence connects design reviews, procurement decisions, site actions and reporting
- Escalation protocols resolve target conflicts involving cost, programme and compliance
Participants can build, review and present a complete Sustainable Construction Management Plan for a defined project.
- Project brief analysed for sustainability requirements, constraints, stakeholders and priorities
- Materiality matrix selects significant carbon, resource, ecological and community impacts
- Whole-life carbon strategy sets baseline, reduction actions, owners and evidence sources
- Procurement, waste, water and logistics controls integrated into delivery documentation
- Performance dashboard defines indicators, data sources, thresholds and reporting cadence
- Peer review tests plan feasibility, evidence quality, risks and corrective actions
Exercises and examples are adapted to each cohort's sectors and roles.