Course modules
20 modules over 10 daysParticipants can define the schedule architecture needed to plan and control construction delivery.
- Schedule purposes for tendering, baseline control, reporting and contractual administration
- Level one through level four schedules and their intended decisions
- Work breakdown structure aligned with scope, location and responsibility
- Organisational breakdown structure for client, contractor and subcontractor accountability
- Schedule coding dictionaries supporting filters, reports and progress analysis
- Milestone registers linking contractual dates, approvals and sectional completion
Participants can translate construction scope into measurable and schedulable work packages.
- Drawing registers and specifications used to define planning scope
- Decompose deliverables into work packages with clear completion criteria
- Location breakdown structures for buildings, corridors, zones and elevations
- Construction work packages separated by discipline, trade and workfront
- Control accounts connecting schedule packages with cost management structures
- Scope assumptions registers recording exclusions, interfaces and unresolved information
Participants can create activities and estimate achievable durations using production evidence.
- Activity definitions written with measurable starts, finishes and ownership
- Quantity take-offs converted into production-based activity duration estimates
- Crew productivity rates adjusted for access, learning and congestion
- Calendars reflecting shifts, working hours, holidays and weather allowances
- Discrete activities, level-of-effort activities and milestone events distinguished clearly
- Duration assumptions documented for later review during schedule updates
Participants can create logic networks that represent the intended construction sequence.
- Finish-to-start relationships applied to conventional construction work sequences
- Start-to-start and finish-to-finish relationships used with justified lags
- Predecessor and successor logic tested at trade and workfront interfaces
- Lead and lag restrictions assessed against contractual scheduling requirements
- Network diagrams expose missing logic, open ends and circular relationships
- Physical constraints separated from planning preferences and imposed dates
Participants can interpret critical path calculations and explain schedule-driving activities.
- Forward pass calculations establish early dates through the network
- Backward pass calculations identify late dates and total float
- Critical Path Method identifies activities controlling the forecast completion date
- Near-critical paths reviewed using low-float thresholds and sensitivity testing
- Free float distinguished from total float for interface management
- Multiple critical paths assessed where parallel completion conditions exist
Participants can prepare a credible baseline programme for approval and future control.
- Baseline scope checked against contract documents and tender commitments
- Design release dates integrated with procurement and construction sequencing
- Long-lead equipment schedules linked to fabrication, delivery and installation
- Subcontractor programmes incorporated without losing principal contractor control
- Approval workflows establish baseline ownership, revision status and issue dates
- Basis-of-schedule narratives record methods, assumptions, calendars and constraints
Participants can resource-load activities and identify workforce demand conflicts.
- Labour crews assigned using production rates and planned work quantities
- Plant resources matched to activity needs, availability and operating constraints
- Resource histograms reveal peaks, gaps and unsustainable labour demand
- Resource levelling compares delayed activities against contractual completion obligations
- Trade stacking risks identified through location-based resource demand reviews
- Manpower curves prepared for mobilisation, peak production and demobilisation
Participants can connect schedule dates with planned cost and payment forecasts.
- Cost accounts mapped to schedule activities and work package budgets
- Planned value curves generated from time-phased cost-loaded activities
- Cash flow forecasts reflect payment terms, retention and procurement deposits
- Cost loading distinguishes direct costs, preliminaries and owner-supplied equipment
- Monthly valuation dates aligned with measurable schedule progress rules
- Forecast expenditure tested against funding limits and approved budgets
Participants can schedule non-construction dependencies that govern site production.
- Procurement schedules trace requisition, approval, manufacture, inspection and delivery
- Design deliverable schedules identify information required before field release
- Interface registers connect civil, structural, mechanical and electrical dependencies
- Vendor data dates incorporated into fabrication and installation logic
- Temporary works sequenced with permanent works and access requirements
- Commissioning prerequisites linked to installation, testing and energisation activities
Participants can convert master schedule requirements into actionable field plans.
- Six-week look-ahead schedules extracted from approved baseline programme logic
- Last Planner System commitments connect weekly work plans with constraints
- Constraint logs track drawings, materials, access, permits and predecessor work
- Make-ready planning removes blockers before crews reach planned workfronts
- Percent plan complete measures weekly commitment reliability and learning
- Daily coordination boards align trade activities, areas and safety controls
Participants can establish progress rules and collect update data suitable for forecasting.
- Progress measurement rules define objective credit for completed work
- Physical percent complete calculated from quantities, installed units and milestones
- Actual start and finish dates captured from verified field records
- Remaining duration forecasts tested against current productivity and constraints
- Site diaries, photographs and inspection records support update evidence
- Data dates set clear boundaries between actual performance and forecast work
Participants can update schedules and communicate reliable completion forecasts.
- Status updates apply actual dates, progress quantities and remaining durations
- Out-of-sequence progress assessed using retained logic and progress override
- Data-date discipline prevents future work from appearing as completed performance
- Schedule recalculation identifies changed critical paths and completion forecasts
- Update narratives explain variance causes, corrective actions and decision needs
- Forecast milestones compared with baseline dates and contractual obligations
Participants can assess schedule integrity and correct common programme defects.
- DCMA 14-Point Schedule Assessment tests logic, leads, lags and float
- Missing predecessors and successors identified through open-end schedule checks
- Excessive constraints examined for concealed logic and artificial critical paths
- Long-duration activities reviewed against reporting and control requirements
- Negative float investigated through imposed dates, logic and calendar conflicts
- Schedule health reports prioritise corrections before baseline approval or update
Participants can produce schedule reports matched to management and site decisions.
- Bar charts tailored for executives, package managers and field supervisors
- Milestone reports highlight decisions, approvals and emerging completion risks
- Critical path narratives explain causes rather than merely listing activities
- Two-week plans communicate workable tasks to trade and subcontractor teams
- S-curves compare planned, actual and forecast progress against baselines
- Reporting calendars align update cycles with governance and payment milestones
Participants can assess schedule uncertainty and plan practical time-risk responses.
- Risk registers connect uncertain events with affected schedule activities
- Three-point duration estimates establish optimistic, likely and pessimistic ranges
- Monte Carlo simulation interprets confidence levels for completion milestones
- Schedule contingency distinguished from hidden float and unallocated management reserve
- Weather risk allowances based on historical workability and exposed activities
- Risk response actions assigned with triggers, owners and review dates
Participants can evaluate delay events using schedule records and defensible analysis principles.
- Delay event records preserve notices, instructions, photographs and contemporaneous updates
- Excusable, compensable and concurrent delay concepts distinguished contractually
- Time impact analysis inserts prospective events into approved schedule logic
- Windows analysis reviews critical path movement during defined update periods
- As-planned versus as-built analysis identifies broad sequence and duration variance
- Concurrency assessment examines overlapping critical delays and party responsibility
Participants can prepare recovery options that address identified completion delay.
- Recovery schedules target critical and near-critical activities causing forecast delay
- Crashing options evaluate added crews, shifts, plant and supervision costs
- Fast tracking assesses resequencing opportunities and increased coordination risks
- Productivity improvement actions test workfront release, logistics and prefabrication
- Acceleration plans quantify time savings, costs, risks and required approvals
- Recovery dashboards track planned gains against achieved completion improvements
Participants can organise schedule data and apply core functions in planning software.
- Primavera P6 activity codes, calendars and layouts support controlled schedule development
- Microsoft Project views expose logic, critical tasks and resource allocations
- Schedule templates standardise coding, calendars, relationships and report formats
- Baseline copies preserved with controlled revisions and documented authorisation
- Import and export checks protect dates, codes and relationship integrity
- Version registers identify issued programmes, update dates and approval status
Participants can conduct a structured review of a contractor or subcontractor programme.
- Review checklists test scope coverage, logic, durations and contractual milestones
- Constructability reviews challenge access, sequencing and trade-interface assumptions
- Resource feasibility checks compare planned crews with available workforce capacity
- Procurement reviews test long-lead dates against installation and commissioning needs
- Baseline review comments distinguish mandatory corrections from planning recommendations
- Acceptance criteria document required evidence before programme approval
Participants can build, review and present a complete baseline construction schedule and control plan for a realistic project.
- Project scope converted into coded work breakdown and activity register
- Logic-linked baseline schedule developed with calendars, milestones and critical path
- Resources and costs loaded to produce workforce and cash flow forecasts
- Procurement, design, testing and commissioning interfaces incorporated into programme logic
- DCMA quality findings resolved through documented schedule corrections and assumptions
- Progress update, recovery response and management report presented for review
Exercises and examples are adapted to each cohort's sectors and roles.