Course modules
20 modules over 10 daysParticipants can define the site engineer's operational responsibilities, authority limits and daily control routines.
- Site engineer accountabilities from mobilisation through practical completion and handover
- Interfaces between client, consultant, contractor, subcontractor and statutory inspector roles
- Daily control cycle linking planning, execution, inspection, records and corrective action
- Site organisation charts, delegation matrices and escalation routes for decisions
- Construction documents establishing scope, standards, sequence and acceptance requirements
- Daily diary content recording weather, labour, plant, events and instructions
Participants can extract executable work requirements from drawings, specifications and contract documents.
- Drawing registers, revision clouds and document status controls before construction
- Reading plans, sections, elevations and details for work-package planning
- Specification clauses defining materials, workmanship, testing and acceptance criteria
- Bills of quantities linked to drawings, specifications and measurement rules
- Request for information process resolving discrepancies before site execution
- Technical submittal registers tracking approvals for materials, samples and method statements
Participants can prepare a practical site logistics plan for safe and efficient operations.
- Site logistics drawings locating gates, roads, welfare, storage and exclusion zones
- Traffic management plans separating pedestrians, delivery vehicles and mobile plant
- Temporary works requirements for access, excavation support, lifting and formwork
- Material laydown planning based on delivery sequence, lifting reach and security
- Welfare facilities sized for workforce numbers, shift patterns and statutory requirements
- Emergency access routes, muster points and fire-point locations on logistics plans
Participants can divide project scope into controllable work packages with clear handoffs.
- Work breakdown structure developed from deliverables, locations and construction disciplines
- Work packages defining scope boundaries, predecessors, resources and acceptance criteria
- Location-based planning identifying repetitive zones, floors, sections and chainages
- Responsibility assignment matrix using RACI for work-package ownership and approvals
- Interface registers recording handoffs between civil, structural, MEP and finishing trades
- Constraint logs identifying design, access, material and inspection dependencies
Participants can build and interpret a logic-linked baseline schedule for site delivery.
- Critical path method logic using finish-to-start and lead-lag relationships
- Activity durations estimated from quantities, productivity rates and available resources
- Network diagrams identifying critical activities, float and schedule sensitivity
- Milestone schedules linking contractual dates, approvals, procurement and construction completion
- Resource loading exposing labour, plant and material demand by period
- Baseline programme review checking logic gaps, excessive constraints and missing interfaces
Participants can prepare rolling look-ahead plans that release workable tasks to crews.
- Six-week look-ahead schedules derived from the approved baseline programme
- Make-ready planning verifies drawings, labour, materials, access and permits
- Weekly work plans assign measurable commitments to supervisors and subcontractors
- Percent plan complete measures completed promises against weekly planned tasks
- Reasons-for-variance coding identifies recurring causes of missed production commitments
- Constraint removal meetings assign owners, due dates and escalation actions
Participants can match resources to planned output and detect emerging productivity problems.
- Crew composition planned from activity quantities, productivity norms and sequence
- Labour histograms compare planned manpower with attendance and work-front availability
- Plant allocation considers capacity, utilisation, maintenance windows and operator competence
- Material schedules connect approved submittals, procurement lead times and delivery dates
- Daily resource reports record labour hours, equipment hours, deliveries and downtime
- Productivity tracking compares installed quantities against planned labour-hour performance
Participants can coordinate subcontractors through defined responsibilities, meetings and performance controls.
- Subcontract scope matrices clarify boundaries, inclusions, exclusions and interface responsibilities
- Pre-start meetings confirm drawings, method statements, resources and acceptance criteria
- Daily coordination meetings align work fronts, deliveries, lifting and shared access
- Subcontractor progress measured through installed quantities, milestones and inspection releases
- Instruction registers track verbal directions, confirmations, responses and close-out dates
- Performance reviews address missed commitments, quality defects and safety observations
Participants can develop method statements that control sequence, resources, risks and quality checks.
- Method statement structure covering scope, sequence, resources, hazards and controls
- Construction sequence defines predecessor completion, hold points and trade handoffs
- Plant and lifting requirements verified against load charts and access conditions
- Task briefings communicate approved methods, drawings, hazards and quality expectations
- Hold-point registers identify work requiring consultant or client release
- Work permits linked to method statements for controlled high-risk activities
Participants can establish inspection controls and evidence conformity against project requirements.
- Inspection and test plans define hold points, witnesses and acceptance records
- Checklists translate drawings and specifications into observable workmanship requirements
- Material receiving inspections verify quantities, condition, certificates and approved sources
- Mock-ups establish agreed workmanship standards before repetitive production begins
- Nonconformance reports document defects, root causes, correction and verification
- ISO 9001 principles applied to document control, traceability and corrective action
Participants can supervise daily safety and environmental controls for planned construction activities.
- Task risk assessments identify hazards, exposed persons, controls and residual risk
- Permit-to-work systems control excavation, confined space, hot work and electrical tasks
- Toolbox talks address changing conditions, specific hazards and worker responsibilities
- Daily safety inspections check access, housekeeping, barriers, PPE and plant condition
- Incident reporting preserves facts, evidence, immediate actions and investigation records
- Environmental controls manage dust, noise, waste, spills and water discharge
Participants can measure physical progress and identify schedule or cost performance variance.
- Quantity take-offs establish measurable progress units for each work package
- Rules of credit define earned progress for partial and completed activities
- Planned value, earned value and actual cost calculations for site control
- Schedule performance index and cost performance index interpreted for corrective action
- Progress photographs linked to locations, dates, quantities and inspection status
- S-curves compare planned, actual and forecast cumulative project progress
Participants can maintain site records that support cost control and payment certification.
- Cost codes align labour, materials, plant and subcontract work packages
- Daily cost reports compare committed, incurred and forecast expenditure
- Measurement sheets substantiate completed quantities for interim payment applications
- Daywork records capture labour, plant, materials, signatures and supporting evidence
- Waste tracking identifies losses from damage, over-ordering, rework and poor storage
- Forecast final cost updated from productivity, commitments and anticipated changes
Participants can document change and delay events using contemporaneous site evidence.
- Change registers record instruction dates, scope effects, notices and valuation status
- Early warning notices identify potential time, cost, quality and safety effects
- Delay logs capture events, affected activities, evidence and mitigation actions
- Contemporaneous records include diaries, photographs, correspondence and resource reports
- Time impact analysis tests schedule consequences of instructed or disruptive events
- FIDIC notice provisions considered when recording variations, claims and extensions
Participants can maintain a site risk register and formulate recovery actions for disrupted work.
- Risk registers assess probability, impact, response owner and review date
- Risk scoring matrices prioritise threats to safety, time, cost and quality
- Mitigation actions reduce exposure through alternative methods, resources or sequencing
- Recovery schedules resequence work, add resources and protect critical milestones
- What-if analysis tests weather delays, procurement failures and access restrictions
- Escalation thresholds trigger management intervention before risks become delay events
Participants can produce concise site reports and run action-led coordination meetings.
- Daily reports summarise work completed, resources, issues, inspections and weather
- Weekly reports present planned-versus-actual progress, constraints, risks and recovery actions
- Meeting agendas focus on decisions, commitments, owners and due dates
- Action trackers record status, evidence of closure and overdue escalation
- Progress dashboards display milestones, productivity, quality defects and safety indicators
- Communication protocols control distribution, revision status and formal correspondence routes
Participants can plan completion, commissioning and handover activities with controlled close-out records.
- Completion plans sequence snagging, testing, commissioning, training and document submission
- Punch lists record location, defect description, responsible party and closure evidence
- Testing schedules coordinate specialist attendance, prerequisites and witness requirements
- Commissioning plans define systems, functional tests, records and acceptance criteria
- As-built drawing controls capture approved changes during construction execution
- Handover dossiers organise warranties, certificates, manuals and maintenance information
Participants can apply disciplined digital records and model-based information to site coordination.
- Common data environment workflows control document issue, review and approval status
- BIM coordination views identify clashes, access conflicts and construction sequence constraints
- Mobile inspection forms capture photographs, location data and corrective actions
- QR-coded material tracking links deliveries, certificates, locations and installation records
- Dashboard data validation checks source records before management reporting
- File naming conventions maintain traceable correspondence, drawings and quality evidence
Participants can lead structured site discussions that resolve operational issues and maintain accountability.
- Daily huddles confirm priorities, hazards, resource gaps and work-front readiness
- Situation-behaviour-impact feedback addresses performance issues with specific observed evidence
- Root cause analysis uses five whys and fishbone diagrams
- Escalation conversations distinguish technical decisions, commercial exposure and safety stop-work authority
- Conflict resolution addresses trade interference, access disputes and sequence disagreements
- Decision logs record options, approvals, assumptions and implementation responsibilities
Participants can build, review and present a complete Site Management Plan for a defined construction project.
- Project execution brief defines scope, milestones, constraints, stakeholders and success measures
- Site logistics plan integrates access, welfare, storage, traffic and emergency arrangements
- Baseline and six-week schedules connect work packages, logic and constraints
- Resource plan assigns crews, plant, materials and subcontractor responsibilities
- Quality, safety and environmental controls align inspections, permits and risk assessments
- Progress dashboard reports quantities, earned value, risks, actions and recovery measures
- Peer review tests plan completeness, evidence quality, feasibility and decision readiness
- Formal presentation defends priorities, control methods and response to project disruptions
Exercises and examples are adapted to each cohort's sectors and roles.








