Course modules
20 modules over 10 daysParticipants can define the management responsibilities and system elements required for construction health and safety control.
- ISO 45001 clauses translated into construction safety management responsibilities
- Client, principal contractor and subcontractor duty-holder interfaces mapped clearly
- Project safety policy aligned with contractual and legal requirements
- Safety leadership behaviours influencing supervisor and workforce decisions daily
- Worker consultation arrangements including committees and representative roles established
- Management review inputs, outputs and documented follow-up actions defined
Participants can develop and maintain task-based risk assessments for construction work.
- Construction hazard identification using task, area and equipment inspections
- Risk matrices calibrated for likelihood, consequence and exposure frequency
- Hierarchy of Controls applied before reliance on personal protective equipment
- Residual-risk acceptance criteria assigned to accountable project managers
- Dynamic risk assessment triggers identified during changing site conditions
- Risk register ownership, review dates and escalation routes established
Participants can prepare a project HSE plan that converts requirements into site controls.
- Project HSE plans structured around scope, risks and responsibilities
- Objectives and targets linked to measurable leading safety indicators
- Construction phase plans coordinated with programme and mobilisation milestones
- Site rules developed for workforce, visitors and delivery personnel
- HSE resource plans covering supervision, welfare and emergency equipment
- Document control arrangements for revisions, approvals and distribution
Participants can evaluate and prepare method statements that specify credible task controls.
- Method statement sections connecting work sequence, hazards and controls
- Job Safety Analysis used to break tasks into critical steps
- Pre-task briefings confirming competence, equipment and changing conditions
- Safe systems of work verified against actual field activities
- Control measures written with accountable roles and verification points
- Workforce acknowledgement records distinguished from genuine task understanding
Participants can establish permit controls for high-risk construction activities and energy isolation.
- Permit-to-work roles defined for issuer, receiver and area authority
- Hot-work permits addressing ignition sources, fire watch and monitoring
- Lockout-tagout procedures controlling electrical, hydraulic and pneumatic energy
- Permit handover arrangements managed across shifts and contractor interfaces
- Gas testing records interpreted for confined spaces and hot work
- Permit suspension and closure criteria applied after changing conditions
Participants can control contractor safety performance from prequalification through work completion.
- Contractor prequalification criteria covering competence, incident history and resources
- Tender HSE requirements converted into measurable contract deliverables
- Subcontractor induction processes tailored to site hazards and rules
- Interface risk registers used for simultaneous operations and shared areas
- Daily coordination meetings resolving access, sequencing and control conflicts
- Contractor performance reviews using inspections, actions and leading indicators
Participants can assess site setup arrangements that support safe access, welfare and work control.
- Site layout plans separating pedestrians, vehicles, storage and work zones
- Welfare facilities assessed against workforce numbers and shift patterns
- Access and egress routes maintained during changing construction phases
- Housekeeping standards addressing waste, trailing materials and trip hazards
- Material storage controls preventing collapse, obstruction and manual handling injuries
- Security arrangements controlling unauthorised entry and visitor movement
Participants can select and verify controls for work at height and scaffold activities.
- Work-at-height hierarchy prioritising elimination, prevention and fall mitigation
- Scaffold inspection tags checked against handover and alteration records
- Collective protection assessed for guardrails, covers and safety nets
- Fall arrest systems evaluated for anchor strength and rescue planning
- Ladder use restricted through task assessment and supervision controls
- Dropped-object prevention measures applied to elevated work activities
Participants can plan and monitor lifting operations using defined roles and control measures.
- Lift plans matched to load weight, radius and ground conditions
- Appointed person responsibilities defined for complex lifting operations
- Crane selection checked against load charts and operational limits
- Rigging inspections covering slings, shackles, hooks and lifting beams
- Exclusion zones controlled through barriers, banksmen and communication protocols
- Critical lift criteria requiring additional review and management approval
Participants can manage excavation and temporary works risks through planning, inspection and control.
- Excavation permits verifying underground services, drawings and survey information
- Trench support selected using soil assessment and excavation geometry
- Competent person inspections scheduled after rain, vibration and alterations
- Spoil piles and plant positioned outside collapse influence zones
- Temporary works registers assigning design, checking and inspection responsibilities
- Access ladders, edge protection and rescue provisions verified daily
Participants can design traffic controls that reduce vehicle and mobile plant exposure.
- Traffic management plans separate pedestrian routes from mobile plant
- Reversing controls use designated banksmen, cameras and exclusion areas
- Plant pre-use inspections record defects and withdrawal requirements
- Operator competence verified through licences, authorisations and familiarisation records
- Delivery scheduling reduces congestion at gates, laydown areas and work fronts
- Vehicle-pedestrian near misses analysed for route and supervision failures
Participants can verify electrical safety controls for temporary construction power systems.
- Temporary electrical distribution designed with protection and inspection points
- Residual current devices tested and recorded at defined intervals
- Cable routing protected from damage, water and vehicle movement
- Electrical isolation verified before maintenance, alteration and testing work
- Portable equipment inspections linked to defect reporting and tagging
- Overhead line controls address approach distances and plant restrictions
Participants can control confined-space entry, hot work and construction fire risks.
- Confined-space classification considers access, atmosphere and engulfment hazards
- Entry permits specify testing, ventilation, standby and rescue arrangements
- Atmospheric monitoring records oxygen, flammables and toxic contaminants continuously
- Hot-work controls coordinate permits, combustibles removal and fire watches
- Construction fire plans identify temporary alarms, escape routes and assembly points
- Emergency rescue teams assessed for equipment, competence and response times
Participants can identify occupational health exposures and establish suitable monitoring and control measures.
- Exposure assessments address silica, asbestos, welding fumes and solvents
- Occupational hygiene monitoring plans specify sampling methods and frequencies
- Dust suppression selected through wet methods, extraction and enclosure
- Noise control programmes combine engineering measures, zoning and audiometry
- Manual handling assessments consider load, posture, distance and repetition
- Health surveillance arrangements linked to identified occupational exposure risks
Participants can establish competence and communication arrangements for a mixed construction workforce.
- Competence matrices identify training, licences and supervision requirements
- Site inductions communicate critical rules, emergency actions and reporting routes
- Toolbox talks structured around current tasks, incidents and seasonal risks
- Language barriers addressed through visual materials and understanding checks
- Supervisor briefings record task changes, interfaces and workforce concerns
- Behavioural observations distinguish unsafe conditions from unsafe actions
Participants can investigate construction incidents and produce actions that address underlying causes.
- Incident classification separates injuries, damage, near misses and dangerous occurrences
- Initial response priorities protect people, preserve evidence and notify management
- Five Whys analysis tests causal chains beyond immediate worker actions
- Bow-tie analysis identifies failed barriers and missing recovery controls
- Witness interviews use open questions, timelines and corroborating evidence
- Corrective actions assigned with owners, deadlines and effectiveness checks
Participants can conduct inspections and audits that test whether site controls are working.
- Planned inspection schedules prioritise high-risk activities and changing work fronts
- Inspection checklists test conditions, behaviours, documentation and equipment status
- Audit evidence sampled through observation, interviews and record review
- Nonconformities classified by risk, recurrence and system-level significance
- Action trackers monitor overdue items, barriers and escalation decisions
- Verification visits confirm corrective actions achieved intended control outcomes
Participants can report meaningful HSE performance information for project and management decisions.
- Leading indicators selected for inspections, observations, training and action closure
- Lagging indicators interpreted with exposure hours and incident severity
- Safety dashboards distinguish trends, targets, exceptions and required decisions
- Weekly reports connect field findings with accountable management actions
- Data quality checks identify duplicate records, missing dates and weak classifications
- Management review packs summarise performance, risks and resource requirements
Participants can prepare emergency arrangements for credible construction site scenarios.
- Emergency scenarios prioritised through site-specific risk assessment findings
- Response plans assign command, communications, evacuation and medical responsibilities
- Spill response arrangements address containment, reporting and waste disposal
- Rescue plans developed for height, confined-space and excavation incidents
- Emergency drills evaluated against response times, decisions and equipment readiness
- Post-event recovery plans address welfare, investigation and work restart
Participants can build, review and present a complete construction health and safety management plan for a defined project.
- Project scope translated into HSE objectives, roles and control arrangements
- Risk register completed for priority construction activities and interfaces
- Method statements, permits and inspection schedules integrated into project controls
- Contractor management process aligned with mobilisation and work sequencing
- Performance dashboard and incident process prepared for management review
- Peer review tests plan completeness, practicality and evidence requirements
Exercises and examples are adapted to each cohort's sectors and roles.








