Course modules
19 modules over 10 daysParticipants can define the delivery context, governance structure and success criteria for an infrastructure project.
- Infrastructure asset lifecycles from feasibility through commissioning and operational handover
- Client, designer, contractor and regulator roles within delivery governance structures
- Stage-gate approvals, delegated authorities and decision-rights matrices
- Success criteria balancing capacity, safety, cost, schedule and asset performance
- Public-sector accountability, funding conditions and audit trail requirements
- Project charter contents: objectives, constraints, assumptions and acceptance criteria
Participants can convert project scope into controlled work packages and measurable deliverables.
- Work breakdown structures aligned with asset systems, locations and contract packages
- Scope statements distinguishing inclusions, exclusions, assumptions and interfaces
- Control accounts linking work packages, budgets, schedules and responsible managers
- Quantity take-offs used to define measurable construction deliverables
- Interface registers for civil, mechanical, electrical and utility work boundaries
- Requirements traceability matrix connecting employer requirements to acceptance evidence
Participants can assess constructability and select practical construction methods before mobilisation.
- Constructability reviews identifying access, lifting, sequencing and temporary works constraints
- Method statements defining labour, plant, materials, controls and hold points
- Temporary works coordination under BS 5975 design and checking principles
- Site logistics plans covering laydown areas, traffic routes and welfare facilities
- Construction method selection using productivity, risk and access criteria
- Design-for-construction reviews resolving clashes before field installation begins
Participants can create a logic-driven baseline programme and identify critical delivery constraints.
- Critical Path Method schedules built from activities, durations and precedence logic
- Finish-to-start, start-to-start and lag relationships tested for realistic sequencing
- Milestone schedules linking design release, procurement, construction and commissioning
- Resource loading used to identify labour, plant and material constraints
- Calendars, weather allowances and possession windows incorporated into programme logic
- Baseline programme approval criteria, assumptions register and revision controls
Participants can translate baseline schedules into reliable site plans and progress measures.
- Look-ahead planning using six-week constraint removal and commitment tracking
- Last Planner System principles for weekly work planning reliability
- Daily site coordination boards covering production targets, constraints and safety
- Physical progress measurement using quantities, installed units and completion rules
- Schedule updates distinguishing actual progress, remaining duration and forecast completion
- Recovery plans addressing critical activities, resequencing options and resource increases
Participants can establish a cost baseline linked to quantities, work packages and schedule activities.
- Cost breakdown structures aligned with work packages and chart accounts
- Quantity-based estimating using labour, plant, material and subcontractor cost drivers
- Direct costs, preliminaries, contingencies and escalation separated within estimates
- Cost-loaded schedules connecting planned expenditure to construction progress
- Cash flow forecasts built from procurement commitments and payment terms
- Management reserves governed through approval thresholds and documented drawdown decisions
Participants can assess cost and schedule performance using earned value management metrics.
- Planned value, earned value and actual cost calculations
- Cost Performance Index and Schedule Performance Index interpretation
- Estimate at Completion forecasts using current performance indices
- Progress curves comparing planned, earned and actual cumulative values
- Variance analysis separating productivity, quantity, rate and timing causes
- Monthly project dashboards highlighting thresholds, trends and management actions
Participants can plan procurement packages that support construction sequencing and risk allocation.
- Make-or-buy decisions based on capability, risk, capacity and market conditions
- Procurement schedules aligned with design maturity, lead times and installation dates
- Bid package scopes defining technical requirements, quantities and commercial conditions
- Prequalification criteria assessing financial capacity, experience and safety performance
- Tender evaluation matrices combining price, methodology, programme and technical compliance
- Long-lead equipment registers tracking approvals, manufacture, testing and delivery
Participants can administer construction contracts through notices, records, valuations and payment processes.
- FIDIC contract roles, notices, determinations and engineer administration principles
- NEC4 early warning process and collaborative risk reduction meetings
- Payment applications supported by measured quantities, records and completion evidence
- Interim valuations distinguishing completed work, materials and retention amounts
- Contract correspondence registers controlling instructions, notices and response deadlines
- Site records supporting entitlement assessments and dispute avoidance
Participants can evaluate changes and maintain records that reduce claims exposure.
- Change-control workflows from request initiation through approval and implementation
- Variation assessments covering scope, quantity, rates, time and consequential impacts
- Time-impact analysis using fragnet insertion within approved programme logic
- Contemporaneous records: diaries, photographs, instructions, weather and labour returns
- Early warning indicators for potential delay, disruption and acceleration claims
- Change logs reconciling approved, pending, rejected and disputed instructions
Participants can identify, analyse and treat construction risks using structured risk controls.
- Risk breakdown structures covering technical, commercial, environmental and stakeholder risks
- Probability-impact matrices calibrated with defined scoring and escalation thresholds
- Bow-tie analysis linking threats, preventive controls, consequences and recovery measures
- Quantitative risk analysis using three-point estimates and Monte Carlo principles
- Risk owners assigned actions, due dates, triggers and residual ratings
- Contingency plans for ground conditions, utility strikes and supply disruption
Participants can integrate health, safety and environmental controls into construction planning.
- ISO 45001 principles applied to construction health and safety management
- Task risk assessments identifying hazards, controls and responsible supervisors
- Permit-to-work systems for confined spaces, excavations and energised systems
- Environmental management plans controlling dust, noise, water and waste
- Incident investigation using five whys and causal factor analysis
- Leading indicators covering inspections, observations, close-outs and safety conversations
Participants can establish quality controls that demonstrate compliance with project requirements.
- Inspection and test plans defining hold points, witnesses and acceptance criteria
- Quality control checklists linked to drawings, specifications and method statements
- ISO 9001 principles applied to construction quality management systems
- Nonconformance reports documenting defects, dispositions, corrective actions and verification
- Material traceability records for concrete, steel, pipes and electrical equipment
- Test result registers controlling sampling frequency, results and approvals
Participants can control project information, revisions and approvals across delivery teams.
- ISO 19650 information management principles for built asset delivery
- Common data environments controlling document status, revision and approval workflows
- BIM coordination reviews identifying design clashes and installation conflicts
- Request for information logs tracking questions, owners, responses and ageing
- Transmittal registers providing evidence of issue dates and receipt
- As-built information requirements defined before installation and testing begins
Participants can manage external interfaces that affect access, sequencing and construction approvals.
- Utility coordination plans identifying owners, diversions, permits and outage windows
- Interface management plans assigning boundaries, deliverables and acceptance responsibilities
- Access agreements controlling land entry, possessions and working-hour restrictions
- Stakeholder mapping using power-interest analysis and engagement actions
- Traffic management plans coordinating diversions, pedestrian routes and emergency access
- Permit registers tracking environmental, road-opening and regulatory approvals
Participants can plan resources and diagnose productivity performance against production targets.
- Labour histograms matching crew sizes to schedule demand
- Plant allocation plans balancing utilisation, availability and critical equipment needs
- Productivity norms calculated from installed quantities and labour hours
- Crew balance charts identifying trade interference and workflow bottlenecks
- Material management plans covering procurement, delivery, storage and issue control
- Daily production reports comparing target quantities, actual outputs and constraints
Participants can plan commissioning and handover activities that support asset acceptance and operation.
- Commissioning plans sequencing pre-commissioning, testing, energisation and operational trials
- Systems completion matrices tracking mechanical completion and outstanding work
- Punch-list management assigning owners, priorities, due dates and verification
- Operations and maintenance manuals compiled from supplier and site records
- Training plans preparing operators for new asset systems and procedures
- Handover dossiers containing certificates, test records, warranties and as-built drawings
Participants can run project controls meetings that produce accountable decisions and timely actions.
- Weekly coordination meeting agendas structured around safety, progress, risks and decisions
- RACI matrices clarifying responsible, accountable, consulted and informed parties
- Action registers recording decisions, owners, due dates and closure evidence
- Escalation protocols defining thresholds for cost, schedule, safety and quality issues
- Visual management boards presenting milestones, constraints, risks and performance trends
- Difficult contractor conversations framed through facts, contract requirements and actions
Participants can build, review and present a complete infrastructure construction management plan for a defined project.
- Project execution plan integrating scope, programme, cost, risk and governance
- Work breakdown structure linked to control accounts and responsible owners
- Baseline schedule with critical path, milestones and key interface constraints
- Cost baseline, cash forecast and earned value reporting framework
- Procurement, contract administration and change-control arrangements for major packages
- Quality, safety, environmental and commissioning controls within delivery strategy
- Management presentation defending priorities, assumptions, risks and corrective actions
Exercises and examples are adapted to each cohort's sectors and roles.