Course modules
20 modules over 10 daysParticipants can configure a Primavera P6 workspace and explain how a controlled construction programme supports project decisions.
- Project planning functions within contractor, consultant and client control environments
- Oracle Primavera P6 Professional interface, databases, layouts and user preferences
- Enterprise project structure and organisational breakdown structure relationships explained
- Project codes, activity codes and user-defined fields for reporting
- Planning assumptions, constraints and contractual milestones documented before programme development
- Data date, planned dates, actual dates and forecast dates distinguished
Participants can translate construction scope into a coded work breakdown structure suitable for scheduling and reporting.
- Work breakdown structure aligned with contract packages and deliverables
- Coding structures for location, discipline, contractor and construction phase
- Control accounts connecting scope packages with responsibility and reporting
- Bill of quantities and drawing registers used for scope verification
- Defining measurable work packages before creating detailed programme activities
- WBS dictionaries recording scope boundaries, assumptions and ownership
Participants can develop measurable activities that represent realistic construction methods and trade handovers.
- Activity naming conventions identifying location, trade, workfront and deliverable
- Construction sequencing from mobilisation through testing, commissioning and handover
- Breaking work packages into measurable activities with clear completion criteria
- Procurement, fabrication, delivery and installation activities integrated into programmes
- Trade interfaces mapped between civil, structural, mechanical and electrical works
- Milestones defined for approvals, access, sectional completion and possession
Participants can apply calendars and duration assumptions that reflect site working arrangements and productivity.
- Global, project and resource calendars configured for construction working patterns
- Weather allowances, holidays and shift arrangements incorporated into calendars
- Production rates converted into activity durations using quantity take-offs
- Crew sizes, plant outputs and access restrictions tested against durations
- Long-lead procurement durations separated from manufacturing and delivery periods
- Duration assumptions recorded in a schedule basis memorandum
Participants can create logic-linked networks and identify the critical path through a construction programme.
- Finish-to-start, start-to-start, finish-to-finish and start-to-finish relationships applied
- Lead and lag usage tested against physical construction sequence
- Critical path method forward pass and backward pass principles
- Open ends, redundant logic and circular relationships identified
- Driving relationships reviewed using Primavera P6 trace logic tools
- Logic narratives explaining key sequence assumptions and interface dependencies
Participants can manage constraints and milestones without distorting forecast logic or critical path results.
- Mandatory start and mandatory finish constraints assessed for schedule distortion
- Start-on and finish-on constraints applied only where contractually necessary
- Project milestones linked to notice-to-proceed, approvals and completion obligations
- Contract data dates and completion dates reconciled with baseline requirements
- Constraint logs recording source, owner, rationale and removal actions
- Negative float investigated through logic, durations and contractual dates
Participants can produce an initial logic-linked Primavera P6 programme from a defined construction scope.
- Creating projects, WBS elements, activities and calendars in Primavera P6
- Importing activity data from structured spreadsheet planning registers
- Assigning predecessors, successors, lags and milestone relationships efficiently
- Grouping and sorting layouts by WBS, location and responsible party
- Gantt chart formatting for construction sequence and milestone communication
- Schedule calculation settings checked before reviewing early and late dates
Participants can assess schedule quality using defined checks and communicate corrective actions to programme authors.
- DCMA 14-point assessment principles applied to construction programme quality
- Missing logic, excessive lags and high-duration activities flagged
- Critical path continuity checked from data date to completion
- Float values reviewed for constraints, outliers and misleading paths
- Schedule health reports converted into corrective action registers
- Independent programme review comments structured for formal submissions
Participants can resource-load activities and analyse labour, plant and material demand across the programme.
- Resource dictionaries structured for labour, plant, material and subcontract packages
- Labour crews assigned using production rates and planned quantities
- Plant resources matched to excavation, lifting and concrete operations
- Material delivery requirements linked to installation activity demand
- Resource calendars reflecting shifts, availability and planned shutdowns
- Histograms analysed for peaks, gaps and unrealistic mobilisation profiles
Participants can evaluate resource conflicts and develop workable options for resource-constrained construction programmes.
- Resource levelling options compared against contractual completion dates
- Priority rules for critical activities, scarce plant and specialist crews
- Workfront release dates coordinated with access and predecessor completion
- Crew continuity assessed using resource profiles and activity sequence
- Subcontractor interfaces reviewed through shared area and handover milestones
- Levelling decisions documented with resulting critical path consequences
Participants can create cost-loaded schedules and derive time-phased budget information for project controls.
- Cost accounts mapped to WBS elements and activity assignments
- Labour, plant, material and subcontract costs assigned to activities
- Planned value curves generated from cost-loaded programme data
- Time-phased budgets reconciled with approved cost plan categories
- Cash flow forecasts derived from planned expenditure profiles
- Cost loading assumptions recorded for audit and change control
Participants can establish, maintain and compare schedule baselines under formal project change control.
- Baseline schedule approval requirements defined within project controls procedures
- Original, current and supplementary baselines distinguished for reporting
- Baseline copies created and assigned within Primavera P6 projects
- Change requests assessed for scope, sequence, duration and resource effects
- Schedule basis memorandum updated after approved programme changes
- Baseline comparison layouts highlighting variance against planned dates
Participants can update construction schedules using consistent progress rules and current site information.
- Status date selection aligned with reporting cut-off and site records
- Actual starts, actual finishes and remaining durations entered correctly
- Physical percent complete, duration percent complete and units percent complete compared
- Rules of credit defined for measurable construction activity progress
- Progress evidence drawn from inspections, quantities, timesheets and delivery records
- Out-of-sequence progress assessed using retained logic and progress override
Participants can explain forecast movement and identify the causes of schedule variance after each update.
- Current critical path compared with approved baseline critical path
- Total float movement analysed by activity, path and contractual milestone
- Variance tables identify delayed starts, finishes and remaining work
- Remaining duration forecasts tested against productivity and resource availability
- Near-critical paths monitored through float thresholds and look-ahead reviews
- Forecast narratives distinguish completed events from anticipated future risks
Participants can calculate and interpret earned value indicators from integrated schedule and cost data.
- Planned value, earned value and actual cost definitions established
- Budgeted cost of work scheduled derived from time-phased baselines
- Budgeted cost of work performed calculated from approved progress rules
- Schedule performance index and cost performance index interpreted
- Estimate at completion forecasts compared using standard earned value formulas
- Earned value limitations recognised for subcontract and quantity-based work
Participants can produce practical look-ahead plans that connect the master programme to site execution.
- Three-week and six-week look-ahead schedules filtered from Primavera P6
- Constraint removal logs assigned to design, procurement and site owners
- Last Planner System principles applied to weekly work planning
- Ready-for-work criteria checked before releasing activities to site teams
- Daily production records compared with planned quantities and crew outputs
- Look-ahead meetings structured around workfronts, constraints and commitments
Participants can identify delay effects and develop schedule recovery options supported by programme evidence.
- Delay event registers linked to affected activities, evidence and notices
- Time impact analysis principles applied to prospective delay events
- Windows analysis principles used for retrospective programme assessment
- Concurrency assessed through critical path status and overlapping delay periods
- Recovery options compare resequencing, additional resources, overtime and shiftwork
- Mitigation actions tested for cost, safety, quality and access impacts
Participants can produce clear programme reports for project teams, senior managers, clients and contractors.
- Executive dashboards report milestones, critical issues, trends and decisions
- Narrative reports explain progress, variance, risks and recovery actions
- Layouts tailored for client, site team, subcontractor and management audiences
- S-curves display planned, earned and actual performance information
- Milestone charts distinguish contractual obligations from internal control dates
- Report quality checks confirm dates, status, assumptions and data sources
Participants can administer programme data using controlled coding, versioning and schedule governance practices.
- Project calendars, codes and dictionaries governed through controlled standards
- Schedule update cycles define responsibilities, cut-off dates and approvals
- Version control procedures preserve submitted programmes and change records
- XER exports, imports and data checks managed without corrupting schedules
- Security roles restrict unauthorised changes to baselines and project data
- Planning assurance audits test compliance with programme management procedures
Participants can build, review and present a complete Primavera P6 construction planning pack with justified management actions.
- Project scope converted into coded WBS, activities and milestone structure
- Logic-linked programme developed with calendars, durations and construction interfaces
- Resources and costs assigned to produce time-phased demand profiles
- Baseline, progress update and variance analysis prepared from supplied records
- Critical delays assessed with recovery actions and responsibility assignments
- Management dashboard and programme narrative prepared for stakeholder review
Exercises and examples are adapted to each cohort's sectors and roles.