Course modules
10 modules over 5 daysParticipants can configure a Microsoft Project file for controlled schedule development.
- Schedule maturity assessed against scope definition, approvals, and reporting needs
- Microsoft Project Desktop interface, views, tables, and ribbon commands
- Project start dates, status dates, and scheduling modes configured
- Working-time calendars established for organisations, teams, shifts, and holidays
- Options controlling automatic calculation, new-task scheduling, and date formats
- File properties, project information, and organiser elements managed consistently
Participants can translate approved scope into a structured, measurable task plan.
- Scope decomposition using deliverable-based work breakdown structure coding
- Tasks and summary tasks constructed from approved scope deliverables
- Milestones defined for approvals, handoffs, contractual dates, and releases
- Duration estimates entered using effort assumptions and planning packages
- Recurring tasks, deadlines, and notes recorded without distorting logic
- Outline levels, WBS codes, and custom fields standardised
Participants can build and test task relationships that reflect actual delivery logic.
- Relationship types selected to represent actual construction and approval logic
- Lags and leads quantified from handover, curing, review, and mobilisation requirements
- Predecessors and successors entered through Gantt Chart and Network Diagram views
- Logic ties audited using driving predecessors, missing links, and open ends
- Hard constraints distinguished from deadlines and discretionary date preferences
- Schedule logic tested through forward pass and backward pass analysis
- Negative float investigated through imposed dates, calendar conflicts, and contractual constraints
Participants can control dates without introducing misleading constraints or calendar assumptions.
- Base, resource, and task calendars configured for realistic working time
- Calendar exceptions entered for shutdowns, public holidays, and shift rotations
- Must Start On and Finish No Earlier Than constraints controlled
- Constraint dates reviewed with Task Inspector and scheduling messages
- Manual scheduling converted safely to automatically calculated task logic
- Deadline indicators used to expose threatened commitments without hard constraints
Participants can assign resources, identify overallocations and assess resolution options.
- Work, material, and cost resources created with appropriate availability settings
- Resource calendars and maximum units aligned with operational capacity
- Assignments built using effort-driven scheduling, units, and work formulas
- Resource Usage and Resource Graph views expose allocation conflicts
- Overallocation resolved through task changes, reassignment, delay, and levelling
- Resource levelling options evaluated against critical-path and delivery implications
- Cost rates and fixed costs used for schedule cost forecasts
Participants can identify schedule drivers and evaluate practical recovery choices.
- Critical path identified using total slack, driving tasks, and network logic
- Near-critical paths examined through filters, grouping, and slack thresholds
- Task Inspector used to diagnose dates, constraints, calendars, and links
- Multiple critical paths and critical slack thresholds configured for review
- What-if scenarios modelled through copied schedules and alternative sequencing
- Schedule compression assessed using crashing, fast tracking, and resource trade-offs
Participants can baseline a schedule and maintain credible progress and forecast data.
- Approved baseline saved after scope, logic, resources, and dates review
- Interim plans distinguished from baseline snapshots and current schedules
- Status date set to separate actual progress from forecast work
- Actual Start, Actual Finish, Remaining Duration, and percent complete updated
- Physical Percent Complete selected where duration-based progress is misleading
- Reschedule Uncompleted Work command moves incomplete tasks beyond status date
- Variance tables compare baseline dates, work, costs, and finish forecasts
Participants can use earned value measures to interpret schedule and cost performance.
- Earned Value fields configured using baseline cost, progress, and status date
- Planned Value, Earned Value, and Actual Cost interpreted correctly
- SV, CV, SPI, and CPI calculated for schedule performance control
- Percent Complete, Percent Work Complete, and Physical Percent Complete compared
- Late tasks and slipped milestones prioritised through variance analysis
- Forecast finish dates communicated with stated assumptions and recovery actions
Participants can produce audience-specific reports and identify schedule data quality issues.
- Gantt Chart, Tracking Gantt, and Timeline views tailored for audiences
- Custom tables, filters, groups, and fields support schedule reviews
- Visual Reports export timephased data to Excel and Visio templates
- PDF and printed views prepared with readable timescales and legends
- Milestone reports separate executive decisions from detailed team coordination
- Schedule health checks document missing logic, constraints, and data quality
- Change-control records link approved changes to updated baseline decisions
Participants can establish a repeatable schedule control cycle for their own projects.
- Schedule update cycle designed around data cut-offs, reviews, and approvals
- Weekly progress collection assigns evidence, owners, dates, and acceptance criteria
- Responsibility matrix clarifies scheduler, task manager, sponsor, and control roles
- Project templates standardise calendars, codes, views, reports, and defaults
- Risk registers connected to schedule threats, triggers, and response dates
- Personal implementation plan defines first schedule, stakeholders, and review cadence
Exercises and examples are adapted to each cohort's sectors and roles.