Course modules
16 modules over 10 daysParticipants can explain how EVM connects scope, schedule, cost and verified construction progress.
- Earned Value Management principles for integrated construction project performance control
- Differences between accounting cost reports, progress reports and EVM data
- Project lifecycle decisions supported by early cost and schedule indicators
- Client, contractor and consultant responsibilities within an EVM governance structure
- Key EVM terminology: PV, EV, AC, BAC, EAC and ETC
- Construction reporting cycles aligned with site measurement and payment dates
Participants can structure construction scope for traceable planning, budgeting and performance measurement.
- Work Breakdown Structure design from asset, discipline and deliverable definitions
- Control account boundaries aligned with management responsibility and reporting needs
- Work package definition using measurable outputs, quantities and acceptance criteria
- Organisational Breakdown Structure links for accountable control account managers
- WBS dictionaries specifying inclusions, exclusions, interfaces and measurement units
- Mapping contract packages, bill items and subcontract scopes to work packages
Participants can establish control accounts with clear ownership, scope and authorised budgets.
- Responsibility Assignment Matrix connecting WBS elements with accountable project roles
- Control account plans combining authorised scope, schedule and budget data
- Planning package use for future work with incomplete detailed definition
- Work authorization processes before budgets and schedule activities become performance data
- Accountable manager roles in validating progress, costs and variance explanations
- Control account registers recording codes, owners, budgets and reporting periods
Participants can identify schedule data required to support credible earned value measurement.
- Critical Path Method schedules structured around measurable construction work packages
- Activity coding standards linking schedule activities to control account identifiers
- Logical relationships, constraints and calendars affecting planned value distribution
- Baseline dates distinguished from current forecast dates and approved changes
- Schedule quality checks using missing logic, excessive lags and open ends
- Milestone definitions supporting objective achievement evidence and contractual reporting
Participants can create a time-phased budget baseline from authorised scope and schedule information.
- Performance Measurement Baseline construction from approved control account budgets
- Time-phasing direct costs against scheduled work package start and finish dates
- Resource-loaded schedules compared with cost-loaded budget distribution approaches
- Budget at Completion reconciliation with approved project control budgets
- Management reserve separated from distributed budgets and earned value calculations
- Undistributed budget treatment during early scope definition and authorisation periods
Participants can calculate planned value profiles that reflect planned construction production.
- Planned Value curves generated from time-phased control account budgets
- Linear spreading compared with quantity-weighted and resource-weighted budget loading
- Front-loaded procurement budgets matched with contractual payment and delivery milestones
- Labour, plant and material cost profiles for civil construction work
- S-curve interpretation for cumulative planned value and period budget analysis
- Baseline review checks for double counting, omissions and timing distortions
Participants can select earning rules suited to different construction deliverables and risk profiles.
- Fixed formula methods including 0/100, 50/50 and weighted milestone rules
- Physical percent complete derived from installed quantities and verified measurements
- Weighted milestone methods for engineering deliverables, approvals and document issue
- Units-complete earning rules for concrete, piping, cabling and earthworks
- Apportioned effort treatment for supervision, temporary works and project support
- Level-of-effort budgets controlled separately from measurable production work
Participants can establish evidence-based progress measurement procedures for monthly EVM reporting.
- Quantity measurement sheets matched with drawings, specifications and inspection records
- Rules of credit defining when construction work becomes eligible for earning
- Site walkdown evidence including photographs, test certificates and completion records
- Hold points and quality acceptance gates before earned value recognition
- Progress validation roles for site engineers, planners and commercial representatives
- Data-date discipline separating completed work from forecast remaining work
Participants can assemble actual cost data that is timely, complete and comparable with earned value.
- Actual cost collection from payroll, invoices, accruals and equipment records
- Cost coding structures aligned with control accounts and work package budgets
- Accrual methods for received work not yet invoiced or paid
- Commitments, actual costs and forecast costs distinguished within cost reports
- Reconciling general ledger costs with project control system reporting
- Period cut-off rules preventing timing errors in monthly performance results
Participants can calculate and interpret core earned value variances and performance indices.
- Cost Variance calculation using earned value minus actual cost
- Schedule Variance calculation using earned value minus planned value
- Cost Performance Index interpretation for completed work cost efficiency
- Schedule Performance Index interpretation for planned production achievement
- Current-period results compared with cumulative trends and control thresholds
- Variance percentage calculations supporting proportional assessment across control accounts
Participants can develop completion forecasts using EVM indices, bottom-up estimates and risk judgement.
- Estimate at Completion using BAC divided by cumulative CPI
- Independent Estimate at Completion using actual cost plus remaining budget
- CPI and SPI combined forecasts for projects with schedule-driven cost exposure
- Estimate to Complete built from quantities, productivity and remaining commitments
- To-Complete Performance Index testing feasibility of target completion budgets
- Forecast assumptions recorded with ownership, evidence and review dates
Participants can investigate significant variances and prepare accountable corrective-action plans.
- Variance Analysis Reports structured around cause, impact, action and ownership
- Root cause analysis using five whys and cause-and-effect diagrams
- Productivity variance separated from quantity growth, price escalation and rework
- Schedule delay impacts traced through work fronts, interfaces and critical paths
- Corrective actions assigned with dates, expected benefits and verification measures
- Trend registers distinguishing isolated events from recurring control account problems
Participants can control authorised baseline changes without obscuring underlying project performance.
- Baseline Change Requests documenting scope, budget, schedule and approval impacts
- Authorised changes distinguished from forecast changes and unauthorised scope growth
- Retrospective baseline changes prevented through formal change-control cut-off dates
- Budget transfers between control accounts recorded with clear management rationale
- Contract variations integrated with revised work packages and performance measures
- Baseline logs preserving audit trails for management and client review
Participants can incorporate subcontract, procurement and indirect-cost performance into construction EVM.
- Subcontractor EVM requirements embedded within scope, reporting and payment clauses
- Procurement earned value tied to purchase orders, fabrication and delivery milestones
- Material cost recognition matched with receipt, installation and ownership transfer
- Indirect cost control for site preliminaries, supervision and temporary facilities
- Subcontractor progress claims tested against agreed earning rules and evidence
- Supplier reporting calendars aligned with project data dates and governance reviews
Participants can prepare concise EVM reports that support timely project decisions.
- Monthly performance reports combining metrics, explanations, forecasts and corrective actions
- Control account dashboards highlighting threshold breaches and adverse performance trends
- S-curves comparing planned value, earned value and actual cost
- Estimate-at-completion narratives explaining material changes since previous reporting periods
- Executive reporting focused on decisions, exposures, actions and required approvals
- Data quality checks before issuing project performance information to stakeholders
Participants can build, review and present a complete EVM control model, forecast and corrective-action plan for a construction project.
- Project WBS, control accounts and responsibility assignments assembled into one model
- Time-phased baseline created from scope, schedule and authorised budget information
- Progress measurement rules selected for engineering, procurement and site production
- PV, EV, AC, CPI, SPI and EAC calculations completed
- Variance causes, corrective actions and forecast assumptions documented for review
- Management report presented with performance findings, decisions and implementation priorities
Exercises and examples are adapted to each cohort's sectors and roles.