Course modules
19 modules over 10 daysParticipants can explain how P6 structures projects, users, data and reporting responsibility.
- Primavera P6 database concepts, modules, user preferences and project access
- Enterprise Project Structure hierarchy aligned with portfolios, programmes and projects
- Organisational Breakdown Structure ownership for project managers and responsible managers
- Project controls cycle from planning through updating, forecasting and reporting
- Project Security Profiles and access rights for controlled schedule data
- Opening projects, layouts and views within the P6 Professional interface
Participants can configure planning structures that support consistent schedule classification and reporting.
- Enterprise Project Structure nodes created for portfolio and programme reporting
- Project codes classify projects by client, region, phase and sponsor
- Activity codes support filtering, grouping and responsibility-based schedule analysis
- Resource codes classify labour, plant, materials and specialist capability
- Global, project and resource calendars define workable time assumptions
- Calendar exceptions model holidays, shutdowns, shifts and weather allowances
Participants can create a P6 project and develop a control-oriented work breakdown structure.
- New project settings establish planned dates, responsible manager and defaults
- Work Breakdown Structure developed from scope, deliverables and control accounts
- WBS dictionary records work-package purpose, boundaries and accountable ownership
- Milestones positioned at approvals, handovers, contractual dates and decision gates
- Project phases reflected through WBS levels rather than activity naming
- OBS assignments connect WBS elements with responsible management roles
Participants can define activities at a level suitable for control, updating and reporting.
- Activity types selected for task dependent, resource dependent and milestone work
- Activity naming conventions distinguish deliverable, action, location and discipline
- Original duration estimates derived from production rates and work quantities
- Duration type settings control recalculation of units, duration and resource assignments
- Activity steps capture measurable internal work without distorting schedule logic
- Codes assign discipline, area, contractor, risk category and reporting package
Participants can create logic-linked schedules and interpret critical path calculations.
- Finish-to-start relationships model successor work after predecessor completion
- Start-to-start and finish-to-finish relationships model concurrent controlled work
- Leads and lags applied only where physical or contractual logic supports
- Precedence diagramming method exposes sequence, interfaces and parallel work
- Data date and forward pass calculations determine early activity dates
- Backward pass calculations establish late dates, float and critical path
- Relationship tabs and network views identify missing or suspect logic
Participants can control schedule dates without obscuring valid network logic.
- Mandatory constraints distinguished from soft constraints and target dates
- Start-on and finish-on constraints assessed for critical path distortion
- Deadline dates flag target breaches without forcing activity schedule dates
- Negative float investigated through logic, constraints, calendars and imposed dates
- Schedule Quality Assessment checks open ends, long durations and excessive lags
- Constraint logs document rationale, approval authority and removal conditions
Participants can produce an initial integrated schedule for review with delivery stakeholders.
- WBS activities sequenced into an integrated scope-to-handover project programme
- Calendars assigned according to work patterns, shifts and contractual assumptions
- Milestone dates tested against contractual commitments and approval lead times
- Critical path reviewed for constructability, procurement and commissioning interfaces
- Longest path analysis identifies completion drivers beyond simple float values
- Schedule narratives record assumptions, exclusions, risks and key dates
Participants can assign resources and roles to create an auditable resource-loaded schedule.
- Resource dictionary defines labour, equipment, material and non-labour resources
- Roles represent planned capability before named resource assignment decisions
- Resource calendars capture availability, shift patterns and planned absences
- Activity assignments specify budgeted units, rates and planned usage
- Units per time values model crew productivity and resource demand
- Resource curves distribute planned units using front-loaded or back-loaded profiles
Participants can identify overallocations and use P6 levelling options responsibly.
- Resource usage profiles reveal daily, weekly and monthly demand peaks
- Histograms compare planned demand against maximum availability and capacity
- Overallocation analysis identifies competing activities and constrained specialist resources
- Resource levelling priorities use total float, activity priority and dates
- Levelling options reviewed for delays, splits and imposed constraint effects
- Manual resource smoothing balances demand while protecting contractual milestones
Participants can develop cost-loaded schedules that support budget and cash flow forecasting.
- Expense items capture subcontract, procurement and fixed activity expenditure
- Resource rates calculate labour, plant and material assignment costs
- Cost accounts structure budgets by control account, discipline and cost category
- Budgeted cost fields reconcile activity estimates with approved project budgets
- Cash flow curves show planned expenditure by reporting period
- Cost loading assumptions documented for procurement, escalation and contingency treatment
Participants can establish baselines and control authorised schedule changes in P6.
- Baseline schedule approved after scope, logic and resource review
- Primary baseline selected for planned-versus-current date and cost comparison
- Secondary baselines preserve tender, approved and recovery programme versions
- Baseline bars display original commitments against current forecast dates
- Change control records scope, logic, duration and resource impacts
- Baseline update rules distinguish authorised changes from performance variance
Participants can update a P6 schedule using controlled progress data and a status date.
- Data date set to the agreed reporting cut-off date
- Actual start and actual finish dates recorded from verified evidence
- Remaining duration updates reflect realistic work, constraints and productivity
- Physical percent complete measured against defined activity completion criteria
- Duration percent complete used where elapsed time represents credible progress
- Progress override versus retained logic assessed for update policy compliance
- Out-of-sequence progress investigated before publishing revised completion forecasts
Participants can diagnose forecast slippage and prepare evidence-based recovery actions.
- Variance analysis compares current dates against approved baseline commitments
- Critical path changes traced through updated logic, durations and constraints
- Total float trends identify weakening schedule contingency before milestone breach
- Delay analysis separates completed impacts from forecast risks and assumptions
- Recovery options assess resequencing, acceleration, additional resources and scope changes
- Time impact analysis models prospective changes within an approved programme
Participants can configure and interpret earned value measures for schedule and cost performance.
- Earned value techniques selected for milestones, physical progress and apportioned effort
- Budget at Completion derived from baseline resource and expense costs
- Planned Value, Earned Value and Actual Cost calculated by status date
- Schedule Performance Index indicates progress achieved against planned work
- Cost Performance Index indicates cost efficiency of completed work
- Estimate at Completion forecasts final cost using current performance indices
Participants can create P6 layouts that present the right schedule information to each audience.
- Activity layouts configured with grouped WBS, codes and responsibility fields
- Filters isolate critical activities, late work, milestones and incomplete tasks
- Grouping and sorting reveal contractor, discipline, area and phase performance
- Columns selected for dates, float, resources, costs and baseline variance
- Bars and timescale settings create readable Gantt chart presentations
- Layout standards preserve controlled views for planners, managers and clients
Participants can produce decision-focused schedule outputs from P6 data.
- Project reports present milestones, critical path, progress and forecast completion
- Resource reports identify planned demand, availability gaps and overallocation periods
- Cost reports summarise budgets, actuals, commitments and forecast expenditure
- Activity usage spreadsheets provide time-phased units, costs and earned value
- Executive dashboards focus attention on exceptions, decisions and accountable actions
- Schedule narrative explains status, variances, risks and recovery recommendations
Participants can exchange schedule data while protecting coding, logic and baseline integrity.
- XER exports transfer P6 projects, calendars, codes and resource assignments
- XML exports support controlled exchange with compatible enterprise systems
- Microsoft Excel imports update activity data using structured templates
- Import logs reviewed for rejected records, duplicate codes and mapping errors
- Schedule data dictionaries define mandatory fields, formats and ownership
- Version control protects approved files and traceable schedule submissions
Participants can apply governance controls that improve schedule reliability and auditability.
- DCMA 14-Point Assessment tests logic, lags, constraints and float
- Schedule health checks examine missing predecessors, successors and invalid dates
- Update calendars define reporting cut-offs, validation steps and approval routes
- Planning procedures assign responsibility for inputs, review and publication
- Coding standards support portfolio roll-up, audit trails and comparative reporting
- Issue registers track data defects, corrective actions and closure evidence
Participants can build, review and present a complete P6 schedule pack for a controlled project.
- Project scope converted into WBS, activities, milestones and accountability assignments
- Logic-linked programme tested using critical path, float and schedule-quality indicators
- Resources, expenses and cost accounts assigned to control budgeted work
- Approved baseline compared with updated progress and forecast completion dates
- Management report presents variances, risks, recovery actions and decision requests
- Peer review challenges schedule logic, constraints, assumptions and reporting clarity
Exercises and examples are adapted to each cohort's sectors and roles.