Course modules
20 modules over 10 daysParticipants can relate construction planning controls to the Primavera P6 project data structure.
- Planning deliverables from tender programme through as-built completion records
- Project controls cycle linking scope, time, cost, risk and change
- Primavera P6 Enterprise Project Structure and organisational responsibility hierarchy
- Project, portfolio and programme distinctions within Primavera P6 databases
- Data date purpose in forecasting completed and remaining project work
- Schedule specifications, employer requirements and contractual programme obligations
Participants can configure a Primavera P6 workspace for controlled schedule development.
- P6 Professional interface, layouts, tables, bars and activity details
- Creating projects with start dates, responsible managers and default settings
- User preferences affecting dates, units, durations and calculation displays
- Calendars, codes and dictionaries established before activity entry begins
- Activity table filters, grouping, sorting and saved layout management
- Project notebook fields used for assumptions, approvals and planning notes
Participants can translate scope information into a structured planning basis.
- Work breakdown structure developed from contract scope and deliverable packages
- Control accounts aligned with disciplines, areas, contractors and reporting needs
- Planning assumptions register covering access, productivity, design and procurement
- Construction work packages defined at measurable field execution level
- Milestone register distinguishing contractual, interface and internal target dates
- Responsibility assignment matrix connecting work packages to accountable parties
Participants can define measurable activities that represent workable construction operations.
- Activities sized for control, progress measurement and accountable ownership
- Physical construction sequence from enabling works through commissioning handover
- Design, procurement and construction interfaces represented as schedule activities
- Work-front release logic for access, permits, inspections and predecessor completion
- Activity codes distinguishing location, discipline, contractor and work type
- Coding dictionaries maintained to support consistent portfolio reporting
Participants can calculate activity durations from quantities, productivity and working time.
- Quantity take-offs converted into crew outputs and planned activity durations
- Production rates adjusted for learning curves, congestion and weather allowances
- Crew composition matched to trade skills, supervision and equipment capacity
- Calendars reflecting shifts, weekends, holidays and restricted working periods
- Discrete activities separated from level-of-effort and hammock activities
- Duration assumptions documented with source data and estimator ownership
Participants can create logic relationships that model construction sequence and dependencies.
- Finish-to-start relationships used for conventional trade and procurement sequencing
- Start-to-start and finish-to-finish links applied where genuinely justified
- Lead and lag treatment avoiding hidden logic and uncontrolled negative lags
- Open ends identified and resolved through clear project start and finish logic
- Logic ties tested against access, inspections, design release and commissioning
- Relationship descriptions recorded for high-risk interfaces and handovers
Participants can interpret schedule calculations, float values and driving paths.
- Forward and backward pass calculations producing early and late dates
- Total float, free float and negative float interpreted correctly
- Longest path analysis compared with total-float criticality settings
- Driving relationships traced through controlling work packages and milestones
- Near-critical activities identified using practical float thresholds and trend reports
- Constraints evaluated for their effect on calculated completion dates
Participants can control constraints and milestones without concealing schedule risk.
- Mandatory constraints reserved for contractual dates and genuine physical restrictions
- Start-on and finish-on constraints tested against logic-driven forecasts
- Milestones structured for design approval, procurement, completion and handover
- Constraint logs recording rationale, owner, expiry date and approval status
- Hard constraints replaced with logical relationships wherever practicable
- Schedule integrity reviewed after each constraint or milestone change
Participants can assign resource requirements and identify capacity pressure in P6.
- Labour, plant, material and non-labour resources configured in P6
- Resource calendars matched to shifts, availability and operating restrictions
- Role assignments used before named resources are commercially confirmed
- Resource units calculated from crew composition, production rates and durations
- Resource histograms exposing peaks, shortages and idle capacity periods
- Assignment units adjusted without disconnecting quantities from production assumptions
Participants can produce time-phased cost forecasts from resource-loaded programme data.
- Cost accounts linked to work breakdown structure and control accounts
- Resource rates applied to labour, plant, material and subcontract activities
- Expense assignments captured for mobilisation, testing, permits and equipment
- Planned value curves generated from budgeted cost of work scheduled
- Cash-flow forecasts reconciled with payment terms, retention and procurement commitments
- Cost loading checks distinguish schedule-control values from accounting records
Participants can create and administer an approved schedule baseline for performance control.
- Baseline schedule reviewed for logic, durations, resources and contractual milestones
- Target programme compared against calculated forecast before approval submission
- Primary, secondary and tertiary baselines configured for controlled comparison
- Baseline approval records capturing revision, date, authority and planning assumptions
- Change-control procedure distinguishes authorised changes from forecast movement
- Baseline copies protected before updates, recovery planning or claim analysis
Participants can update Primavera P6 schedules using disciplined field progress data.
- Data-date discipline separates actual performance from future forecast work
- Physical percent complete applied to measurable construction work packages
- Remaining durations reassessed using current productivity and access conditions
- Actual starts, finishes and quantities validated against field reporting evidence
- Out-of-sequence progress managed through retained logic or progress override
- Update narratives explain critical changes, delayed activities and recovery actions
Participants can assess delay exposure and develop credible schedule recovery options.
- Forecast completion compared with contractual milestones and approved baseline dates
- Delay drivers isolated through critical-path movement and variance analysis
- Recovery options tested using resequencing, additional crews and changed calendars
- Acceleration impacts assessed for productivity, access, safety and cost
- Mitigation actions assigned owners, deadlines and measurable programme effects
- Recovery schedules retain transparent logic and documented planning assumptions
Participants can evaluate programme credibility using recognised schedule-quality diagnostics.
- DCMA 14-point assessment applied to logic, lags, constraints and float
- AACE International RP 29R-03 schedule-quality concepts applied to construction programmes
- High-duration activities examined for missing detail and weak control points
- Negative float, excessive leads and open ends flagged for corrective action
- Critical-path continuity tested from current data date through project completion
- Quality-review findings prioritised by forecast impact and corrective ownership
Participants can convert master programme data into practical short-term work plans.
- Three-week and six-week look-ahead plans extracted from current schedule forecasts
- Constraint analysis identifies drawings, materials, permits, access and labour prerequisites
- Weekly work plans aligned with measurable commitments and field accountability
- Planned-percent-complete trends compared with actual production and missed commitments
- Subcontractor interface meetings focused on handovers, work fronts and resource clashes
- Look-ahead actions fed back into P6 activity status and remaining durations
Participants can produce audience-specific P6 reports that support timely decisions.
- Executive dashboards present milestones, critical risks, trends and recovery actions
- Bar-chart layouts tailored for client, site, subcontractor and management audiences
- Milestone reports distinguish achieved dates, forecast dates and baseline commitments
- Narrative reports explain progress, critical-path change and upcoming decision points
- Activity codes and filters create discipline-specific and area-specific reporting views
- PDF, Excel and XER exports controlled through revision and distribution records
Participants can integrate non-construction dependencies into a coordinated project programme.
- Procurement schedules model enquiry, award, manufacture, delivery and inspection stages
- Long-lead equipment linked to foundations, installation, testing and commissioning
- Design deliverables connected to procurement release and construction work packages
- Interface milestones coordinated between civil, structural, MEP and specialist contractors
- Client decisions modelled as activities with accountable owners and required dates
- Schedule risks recorded where external approvals control construction commencement
Participants can prepare schedule evidence for evaluating the time effects of change.
- Contemporaneous updates preserved before analysing delay events or instructed changes
- Time-impact analysis inserts prospective fragnet logic into approved update schedules
- Delay events linked to affected activities, records, notices and contractual milestones
- Concurrency assessed through separate critical-path effects and calendar overlap
- Extension-of-time submissions supported by narrative, programme extracts and assumptions
- Schedule records retained with audit trails for dispute avoidance and review
Participants can organise consistent planning data across multiple construction projects.
- Enterprise calendars standardised while retaining project-specific working restrictions
- Activity codes governed for portfolio reporting without losing project detail
- Shared resource pools identify cross-project labour and plant demand conflicts
- Project templates accelerate repeatable programme setup for similar construction packages
- Portfolio milestone reports consolidate forecast completion and critical exposure
- Data governance assigns responsibility for codes, calendars, baselines and access
Participants can build, review and present a complete Primavera P6 construction planning and scheduling pack.
- Scope, milestones and planning assumptions converted into a coded work breakdown structure
- Logic-linked activities developed with durations, calendars, resources and cost assignments
- Baseline programme checked using DCMA diagnostics and critical-path review methods
- Progress update applied using field quantities, actual dates and remaining durations
- Recovery options assessed against milestone forecasts, resources and work-front constraints
- Management report presented with look-ahead plan, risks and recommended actions
Exercises and examples are adapted to each cohort's sectors and roles.