Course modules
20 modules over 10 daysParticipants can define the cost-management system, responsibilities and decision points for a construction project.
- Project cost lifecycle from feasibility estimate through final account settlement
- Client, consultant, contractor and subcontractor cost-management responsibilities
- Work breakdown structures linking scope packages, budgets and reporting codes
- Cost baseline, commitment budget, forecast cost and approved contingency distinctions
- Direct costs, preliminaries, overheads, profit and risk allowance components
- Information requirements from drawings, specifications, programmes and commercial documents
Participants can create a cost breakdown that aligns scope, procurement packages and reporting requirements.
- Scope decomposition using work breakdown structure and cost breakdown structure
- Elemental, trade, location and work-package coding approaches compared
- Cost codes mapped to procurement packages and accounting cost centres
- Drawing registers and specification schedules used to establish scope completeness
- Assumptions registers separating included work, exclusions and unresolved design information
- Design maturity assessments before releasing estimates or tender documentation
Participants can select and apply appropriate measurement rules to construction work items.
- RICS NRM 1 principles for order-of-cost estimating and cost planning
- RICS NRM 2 structure for detailed measurement of building works
- CESMM4 classification principles for civil engineering measurement and pricing
- Net and gross measurement rules for openings, voids and overlaps
- Units of measurement for excavation, concrete, reinforcement and finishes
- Method-related charges, temporary works and preliminaries measurement treatment
Participants can prepare auditable quantity take-offs and bill items from project information.
- Dimension paper conventions for recording lengths, areas, volumes and enumerations
- Taking off structural concrete quantities from plans, sections and schedules
- Wall, floor and roof measurement using drawing scale verification
- Bill item descriptions defining location, material, workmanship and unit
- Quantity-checking procedures using independent recalculation and drawing cross-references
- Audit trails linking measured quantities to source drawings and revisions
Participants can build unit rates from resource data, productivity assumptions and risk allowances.
- Labour constants converted into crew hours, output rates and unit costs
- Material quotations adjusted for waste, delivery, storage and price validity
- Plant ownership and hire costs allocated through productive operating hours
- Subcontract quotations analysed for scope gaps, exclusions and commercial qualifications
- Composite rates built from labour, materials, plant, overheads and profit
- Sensitivity analysis testing productivity, inflation and currency assumptions
Participants can prepare an elemental cost plan using benchmarks, quantities and project assumptions.
- Order-of-cost estimates using floor area, functional unit and elemental benchmarks
- RICS NRM 1 elemental cost plan structure and reporting format
- Benchmark normalisation for location, inflation, specification and project scale
- Cost-significant design decisions identified through elemental cost comparison
- Target cost allocation across substructure, superstructure, services and external works
- Contingency allowances derived from defined uncertainty and design maturity
Participants can quantify cost risk and establish transparent contingency control procedures.
- Risk breakdown structures separating design, market, site and delivery risks
- Probability-impact matrices prioritising cost threats and potential opportunities
- Expected monetary value calculations for discrete identified risk events
- Three-point estimates using optimistic, most likely and pessimistic cost values
- Contingency drawdown approvals linked to risk-register status and evidence
- Escalation allowances distinguished from contingency and management reserve
Participants can assess how procurement choices affect price certainty, risk allocation and cost control.
- Traditional, design-build and construction management procurement cost characteristics
- Lump-sum, remeasurement, target-cost and cost-reimbursable pricing mechanisms
- Risk allocation matrices matching risks to accountable contractual parties
- Package strategy balancing market capacity, interfaces and pricing competition
- Early contractor involvement effects on buildability, pricing and programme certainty
- Procurement schedules aligned with design release dates and budget authorisations
Participants can evaluate tender returns and recommend a commercially sound award decision.
- Tender addenda incorporated before comparing bidder quantities and qualifications
- Arithmetic checks identifying extension errors, omissions and inconsistent totals
- Bid normalisation adjusting returns to a common scope and pricing basis
- Commercial comparison matrices covering price, exclusions, programme and risk
- Abnormally low tender analysis using rate outliers and clarification questions
- Tender recommendation reports documenting evaluation rationale and approval requirements
Participants can establish a time-phased control budget from approved scope, rates and programme data.
- Approved estimate converted into control accounts and work-package budgets
- Cost loading construction programmes using activity quantities, rates and durations
- Resource-loaded schedules compared with cost-loaded cash-flow requirements
- Budget phasing by procurement commitment, delivery, installation and retention
- Control budget reconciliation against contract sum and approved contingency
- Baseline change protocols preserving original budget and authorised revisions
Participants can forecast project cash requirements using programme, payment and retention assumptions.
- Monthly cash-flow curves derived from cost-loaded programme activities
- Interim payment timing modelled with certification, payment and retention periods
- Mobilisation advances, recovery deductions and retention release incorporated
- Committed cost, accrued cost and paid cost reconciled monthly
- S-curve analysis comparing planned expenditure against actual expenditure trends
- Funding forecasts updated for approved changes, delays and price escalation
Participants can prepare a monthly cost report that explains variances and required actions.
- Actual cost collection from invoices, payroll, plant records and accruals
- Committed cost registers tracking purchase orders, subcontracts and change orders
- Estimate at completion calculated from actuals, commitments and remaining work
- Cost-to-complete forecasts tested against quantities, productivity and programme status
- Variance narratives distinguishing scope changes, rate changes and execution effects
- Management dashboards presenting budget, forecast, risk exposure and corrective actions
Participants can use earned value measures to assess cost and schedule performance.
- Planned value, earned value and actual cost definitions
- Physical progress measurement using quantity-installed and milestone-weighting methods
- Cost performance index and schedule performance index calculations
- Cost variance and schedule variance interpreted for management decisions
- Estimate at completion calculated using performance-based forecasting formulas
- ANSI EIA-748 control account concepts applied to construction reporting
Participants can control, price and report changes before they erode project margins.
- Change registers recording instruction dates, scope, valuation and approval status
- Potential variation notices issued before changed work affects progress
- Quantity-based valuation using contract rates, derived rates and new rates
- Daywork records supported by labour sheets, plant logs and material invoices
- Time-related preliminaries assessed for extension, disruption and prolongation effects
- Change-control workflows connecting technical approval, commercial approval and budget revision
Participants can prepare and review interim valuations using measured progress and contract terms.
- Valuation dates, payment notices and certification periods under construction contracts
- Measured work, materials on site and off-site materials valuation rules
- Retention calculations, release triggers and defects-period deductions
- Provisional sums and prime cost sums managed through authorisation records
- Payment applications reconciled against programme progress, delivery records and approvals
- FIDIC payment provisions compared with NEC4 assessment principles
Participants can organise cost records that support claims analysis, dispute avoidance and final settlement.
- Contemporaneous records for labour, plant, materials, weather and instructions
- Daily reports aligned with cost codes, activities and affected work areas
- Cause-and-effect analysis connecting events, disruption, delay and cost impact
- Measured mile analysis for productivity loss where comparable work exists
- Claim substantiation using notices, correspondence, programme data and cost records
- Document-control protocols preserving revision history and approval evidence
Participants can prepare a structured final-account strategy and reconcile outstanding commercial matters.
- Final account statement reconciling contract sum, variations, claims and adjustments
- Outstanding variation schedules prioritised by value, evidence and negotiation readiness
- Reconciliation of provisional sums, contingencies, retention and contra-charges
- Subcontract final accounts aligned with main-contract settlement exposure
- Close-out checklists covering warranties, as-builts, releases and final payments
- Lessons learned captured from estimate accuracy, procurement and change performance
Participants can establish governance controls that protect cost integrity and approval accountability.
- Delegated authority matrices for budgets, commitments, changes and payments
- Segregation of duties across measurement, certification, approval and payment
- Forecast assurance reviews testing assumptions, evidence and management bias
- Audit trails for estimates, tender evaluations, variations and final accounts
- Conflict-of-interest declarations during tender assessment and supplier selection
- Cost-reporting protocols defining reporting dates, thresholds and escalation routes
Participants can structure cost data for reliable spreadsheet analysis and management reporting.
- Cost-code dictionaries establishing consistent package, element and activity classifications
- Spreadsheet controls using protected formulas, version logs and validation checks
- Pivot tables summarising commitments, actuals, forecasts and cost variances
- Data reconciliation between procurement registers, site records and finance systems
- Dashboard design focusing on exceptions, trends, decisions and accountable owners
- Common data environment principles for controlled commercial document access
Participants can build, review and present a complete project cost-management pack with recommendations.
- Project scope and assumptions converted into an auditable cost breakdown
- Elemental estimate and priced quantities assembled into baseline project budget
- Tender comparison identifies preferred award, exclusions and commercial conditions
- Time-phased cash forecast reflects programme, payments, retention and escalation
- Change register and risk allowance establish forecast cost at completion
- Monthly cost report explains earned value, variances and corrective actions
- Management presentation defends recommendations, approvals and next reporting actions
Exercises and examples are adapted to each cohort's sectors and roles.