Course modules
18 modules over 10 daysParticipants can identify the contractual and evidential foundations required to manage a delay event.
- Contract documents mapped to time, notice, payment, and claim obligations
- Hierarchy clauses resolved where drawings, specifications, schedules, and amendments conflict
- Baseline obligations distinguished from contractor means, methods, and sequencing decisions
- Responsibility matrices connect employer, engineer, contractor, and subcontractor actions
- Contemporaneous records tested for authorship, dates, completeness, and traceability
- Early-warning procedures linked to contractual notice and mitigation duties
Participants can assess whether a baseline programme is suitable for delay analysis and claim administration.
- CPM logic defines critical, near-critical, and driving activity chains
- Forward and backward pass calculations establish total and free float
- Calendars, constraints, and lags reviewed for artificial criticality
- Schedule narratives explain logic, assumptions, milestones, and access conditions
- Baseline acceptance criteria tested against contract requirements and constructability
- Data-date discipline preserves status integrity during progress updates
Participants can test whether planned sequencing, durations and resources support credible completion dates.
- WBS coding aligns scope packages, cost accounts, and schedule activities
- Resource-loaded schedules expose crew, plant, and material feasibility
- Quantity-based production rates validate activity durations and sequencing
- Procurement lead times integrated with design release and fabrication milestones
- Interface milestones define handovers between civil, MEP, and commissioning work
- Schedule quality checks identify open ends, excessive lags, and constraints
Participants can evaluate progress updates and identify credible evidence of schedule movement.
- Physical progress rules distinguish installed quantities from reported percentages
- Update cycles compare actual starts, finishes, remaining duration, and logic
- Earned value indicators separate schedule slippage from cost performance
- Photographs, diaries, and inspection records corroborate field progress
- Look-ahead plans expose emerging access, design, and procurement constraints
- Progress dashboards report critical-path movement and milestone forecast dates
Participants can classify delay events and determine the principal entitlement questions requiring investigation.
- Delay events classified as excusable, compensable, concurrent, or contractor-risk
- Employer-risk changes separated from neutral events and contractor default
- Concurrent delay tests distinguish true concurrency from overlapping effects
- Time bars assessed against notice wording, knowledge, and prejudice
- Mitigation duties evaluated using reasonable steps, cost, and available resources
- Disruption distinguished from delay, acceleration, and inefficient working
Participants can establish an event administration process that preserves contractual rights and evidence.
- Notice registers capture event dates, clauses, recipients, and response deadlines
- Contractual notice wording drafted with reservation of rights and particulars
- Cause-and-effect narratives connect instructions, impacts, mitigation, and entitlement
- Engineer determinations tracked against submission dates and contractual time limits
- Correspondence protocols prevent admissions, inconsistent positions, and unsupported assertions
- Document control preserves revision history, transmittals, and evidential status
Participants can select an appropriate delay-analysis method based on records, timing and contractual purpose.
- Prospective and retrospective analyses selected according to available records
- Time impact analysis inserts fragnets into the contemporaneous accepted update
- Impacted as-planned analysis tests event effects against the baseline programme
- Windows analysis examines critical-path movement across successive update periods
- As-planned versus as-built comparison identifies variance without proving causation
- Collapsed as-built analysis considers removing delay events from actual history
Participants can perform and explain a structured time impact analysis for a delay event.
- Fragnet design states event scope, durations, logic ties, and assumptions
- Data-date selection fixes the schedule condition before each delay event
- Statused updates preserve actual progress before inserting prospective impacts
- Impact results distinguish critical delay, noncritical delay, and float consumption
- Sensitivity tests assess alternative logic, duration, and calendar assumptions
- Technical memoranda explain inputs, outputs, limitations, and conclusions
Participants can trace critical-path movement and delay responsibility through successive project periods.
- Window boundaries follow update dates, major events, and stable work periods
- Critical-path shifts traced through logic changes, progress, and calendar revisions
- Delay ownership assigned only after event timing and causal links
- As-built dates reconciled with diaries, reports, photographs, and correspondence
- Period-by-period narratives distinguish planned sequence from actual work progression
- Windows findings presented with graphics, tabulations, and source references
Participants can assess concurrent delay and determine whether acceleration costs may be recoverable.
- Concurrency matrices compare critical effects, timing, responsibility, and contractual consequences
- True concurrent delay tested at project completion rather than activity level
- Pacing evaluated where one party deliberately matches another's delay
- Constructive acceleration assessed through denied extensions and recovery demands
- Directed acceleration distinguished from voluntary mitigation and resequencing
- Recovery schedules tested for resource realism, logic integrity, and achievable dates
Participants can identify, evidence and quantify productivity losses arising from disruptive events.
- Measured mile analysis compares unaffected productivity against disrupted work performance
- Productivity factors isolate drawing changes, access restrictions, and trade stacking
- Labor-hour records reconciled to quantities, timesheets, and payroll data
- System dynamics of cumulative impacts distinguished from isolated disruption events
- Loss-of-productivity claims avoid double recovery with delay and prolongation costs
- Disruption narratives connect contemporaneous records to quantified productivity losses
Participants can calculate time-related costs and test their connection to compensable delay.
- Prolongation costs separated into time-related preliminaries, overheads, and financing
- Site overhead calculations trace staff, plant, facilities, and supervision costs
- Head-office overhead methods compared using Hudson, Emden, and Eichleay formulas
- Actual cost records tested for causation, reasonableness, and contractual recovery
- Acceleration costs quantify overtime, additional shifts, premium freight, and plant
- Interest calculations apply contract rates, compounding rules, and claim periods
Participants can prepare non-duplicative quantum schedules for variations and time-related claims.
- Variation valuation applies contract rates, star rates, and fair valuation
- Daywork records substantiate labor, plant, materials, and agreed mark-ups
- Material price escalation calculated using contractual indices and adjustment formulas
- Currency fluctuation clauses tested against base dates and index publication dates
- Payment certificates reconciled to measured work, variations, and retention
- Claim schedules prevent duplication between valuation, prolongation, and disruption heads
Participants can assemble a clear claim submission linking entitlement, causation, delay and quantum.
- Claim registers prioritise events by notice status, value, limitation, and evidence
- Entitlement matrices pair contractual clauses with facts, records, and remedies
- Chronologies sequence instructions, notices, impacts, submissions, and determinations
- Cause-effect-cost structure links breach or event to requested relief
- Particulars meet contractual requirements for substantiation, updates, and supporting documents
- Claim documents separate factual evidence, analysis, contractual argument, and quantum
Participants can apply common contract procedures and select suitable routes for resolving claim disputes.
- FIDIC 2017 claims procedure mapped from notice through determination and dispute
- NEC4 early warning and compensation event mechanisms compared with FIDIC
- Extension-of-time clauses interpreted with prevention principle and time-bar provisions
- Dispute avoidance boards assessed for referral, procedure, and decision effects
- Negotiation preparation defines BATNA, settlement range, evidence, and authority
- Expert determination, adjudication, arbitration, and litigation compared for claim resolution
Participants can review claim submissions critically and prepare evidence-based settlement positions.
- Schedule review checklist tests logic, calendars, constraints, progress, and revisions
- Independent claim review challenges entitlement, causation, delay, and quantum links
- Cross-examination readiness tests source reliability, assumptions, and alternative explanations
- Peer review protocols document reviewer comments, responses, and version control
- Executive summaries state decision required, exposure, recommendation, and key evidence
- Settlement scenarios model time, cost, cashflow, and relationship consequences
Participants can establish governance routines that improve claim readiness throughout project delivery.
- Claims governance assigns event ownership, approvals, escalation, and reporting cadence
- Monthly claim dashboards show notices, exposure, ageing, determinations, and recovery
- Lessons-learned reviews convert recurring delay causes into project controls
- Risk registers integrate schedule threats, opportunities, owners, triggers, and responses
- Commercial meeting agendas track actions, commitments, disputes, and decision dates
- Records retention schedules protect claim evidence through limitation periods
Participants can build, review and present a complete delay-and-claim strategy for a contested construction project.
- Project fact pattern converted into a complete delay and claim strategy
- Baseline and updates reviewed to select a defensible delay-analysis method
- Event chronology, notices, and evidence mapped against contractual entitlement
- Time impact and concurrency findings translated into extension-of-time conclusions
- Prolongation and disruption heads quantified without duplication or unsupported assumptions
- Claim dossier presented with executive recommendation, risks, and negotiation position
Exercises and examples are adapted to each cohort's sectors and roles.