Course modules
18 modules over 10 daysParticipants can define a project controls operating model with clear roles, governance and decision routes.
- Project control purpose, boundaries, roles and decision rights
- Stage-gate governance aligned to sponsor approvals and assurance reviews
- Control account structure linking scope, cost, schedule and ownership
- RACI matrix for project manager, control manager and workstream leads
- Project controls plan content, cadence, thresholds and reporting routes
- Integrated control cycle: measure, analyse, forecast, decide and act
Participants can establish a controlled scope baseline that supports cost, schedule and accountability.
- WBS decomposition using the 100 percent rule and deliverable orientation
- Work packages defined with acceptance criteria, accountable owners and budgets
- Control accounts mapped between WBS, OBS and cost breakdown structure
- Scope baseline approval, version control and authorised change records
- Requirements traceability matrix connecting specifications, deliverables, tests and acceptance
- Preventing scope creep through change authority and baseline discipline
Participants can create a logic-driven schedule basis suitable for formal baseline approval.
- Network logic built with finish-to-start, leads, lags and constraints
- Critical path method calculations for float, criticality and completion dates
- Schedule basis document recording calendars, assumptions, logic and exclusions
- Rolling-wave planning for near-term detail and future planning packages
- Milestone definitions tied to measurable evidence and governance decisions
- Planning quality checks before approving the integrated master schedule
Participants can assess schedule quality, identify critical issues and develop recovery options.
- Baseline schedules with approved logic, durations, resources and key milestones
- DCMA 14-point assessment tests for logic, lags and float
- Critical path trend analysis identifying emerging completion-date pressure
- Schedule performance index interpreted alongside critical path evidence
- Update cycles, data dates, progress status and schedule narrative
- Recovery options tested through resequencing, crashing and fast tracking
Participants can analyse resource demand, capacity constraints and productivity assumptions.
- Resource-loaded schedules connecting labour, plant, materials and activity dates
- Resource histograms exposing peaks, shortages and inefficient deployment patterns
- Resource levelling compared with smoothing, overtime and subcontract alternatives
- Capacity assumptions documented for crews, equipment availability and productivity
- Productivity rates converted into duration, cost and forecast inputs
- Constraint log maintained for access, permits, interfaces and materials
Participants can create a time-phased cost baseline linked to approved scope and schedule.
- Estimate basis records quantities, rates, escalation, exclusions and confidence
- Cost breakdown structure aligned with control accounts and chart codes
- Time-phased budget built from work packages, resources and procurement commitments
- Management reserve separated from contingency and distributed project budget
- Cost baseline approval supported by estimate reconciliation and assumptions register
- Funding profile reconciled with cash requirements and sponsor allocations
Participants can calculate and interpret earned value measures for project performance control.
- Earned value management principles connecting scope, schedule and cost performance
- Planned value, earned value and actual cost calculated consistently
- BAC, PV, EV, AC, CV and SV definitions
- CPI and SPI interpreted with data quality and timing checks
- Earned value techniques selected: weighted milestones, units complete, apportioned effort
- Control account manager responsibilities for progress evidence and performance explanations
Participants can establish objective progress measurement rules and validate performance evidence.
- Objective progress rules defined for engineering, procurement and construction work
- Weighted milestone method assigns value to verifiable completion points
- Physical percent complete validated through quantities, inspections and signed records
- Rules of credit prevent subjective status updates and premature earning
- Progress measurement procedures distinguish effort, deliverables and earned value
- Data quality reviews reconcile field evidence, systems and control accounts
Participants can prepare evidence-based cost forecasts and explain forecast confidence to management.
- Estimate at completion calculated using CPI, SPI and management judgement
- Estimate to complete challenged against remaining quantities, rates and risks
- Variance at completion translated into funding, margin and contingency implications
- To-complete performance index signals required future cost efficiency
- Independent estimate reviews test optimism, omissions and productivity assumptions
- Forecast narratives distinguish observed trends, assumptions, risks and decisions
Participants can quantify risk exposure and integrate contingency decisions into project forecasts.
- Risk register structure captures cause, event, effect, owner and response
- Qualitative probability-impact scoring prioritises threats and opportunities consistently
- Three-point estimates and Monte Carlo simulation quantify schedule uncertainty
- Contingency drawdown tracked against realised risks and approved response actions
- Risk-adjusted forecast separates base estimate, contingency and management reserve
- Early warning indicators linked to risk triggers and response ownership
Participants can assess, approve and record changes without losing baseline traceability.
- Change control workflow records requests, assessments, approvals and implementation dates
- Impact assessments evaluate scope, schedule, cost, risk and contractual effects
- Change log distinguishes pending, approved, rejected and implemented changes
- Baseline revisions authorised only through defined governance and delegated limits
- Trend register captures potential changes before formal instruction arrives
- Configuration status accounting preserves current and historical baseline records
Participants can integrate supplier commitments, progress and claims into project control forecasts.
- Contract type effects on cost exposure, incentives and reporting requirements
- Procurement milestones integrated with design releases, manufacture and delivery dates
- Commitment register reconciles purchase orders, accruals, invoices and forecast costs
- Supplier progress evidence tested against inspection points and payment milestones
- Claims records preserve notices, contemporaneous evidence and entitlement chronology
- Subcontractor forecasts consolidated without double-counting contingency or escalation
Participants can produce concise control reports that direct management attention to decisions.
- Control dashboards separate leading indicators, lagging indicators and decisions required
- Monthly control report integrates schedule, cost, risk, change and cash
- Variance narratives state cause, consequence, corrective action, owner and due date
- Thresholds and tolerances trigger escalation before management reserve consumption
- Traffic-light status supported by evidence rather than subjective confidence
- Executive briefings frame choices, trade-offs, recommendations and required approvals
Participants can specify data structures and controls that support reliable reporting.
- Project controls data model aligns codes, calendars, dates and ownership
- Data dictionary defines fields, sources, validation rules and refresh timing
- Integration points reconcile scheduling, ERP, procurement and document-control systems
- Master data governance prevents duplicate codes and inconsistent reporting hierarchies
- Spreadsheet controls protect formulas, versions, approvals and audit trails
- Dashboard specifications identify users, decisions, measures and update frequency
Participants can assess control effectiveness and maintain evidence for internal assurance reviews.
- Control assurance reviews test baseline integrity, evidence and approval compliance
- Internal control checklist tests segregation, authorisation, reconciliation and retention
- Audit trail requirements link source records, calculations, changes and reports
- Periodic health checks identify control weaknesses before formal assurance reviews
- Corrective action register assigns owners, deadlines, evidence and closure criteria
- Lessons learned capture root causes and reusable control improvements
Participants can diagnose performance problems and prepare quantified recovery action plans.
- Variance analysis distinguishes symptom, root cause, impact and recovery owner
- Schedule recovery scenarios compare resequencing, acceleration, scope reduction and resources
- Cost recovery actions test procurement, productivity, claims and discretionary spend
- Decision logs record options, assumptions, approvals and expected benefits
- Corrective action plans specify measures, owners, dates and verification
- Recovery governance establishes review cadence, escalation thresholds and sponsor decisions
Participants can assemble linked control documents from project charter information and status data.
- Project charter facts converted into scope, schedule, cost and risk controls
- Control plan drafted with governance, calendars, thresholds and accountabilities
- WBS, control accounts and coding structure assembled for a case project
- Baseline schedule and time-phased budget reconciled through shared work packages
- Performance measurement rules documented for selected control accounts
- First forecast and management report prepared from supplied status data
Participants can build, review and present a complete project controls package for sponsor review.
- Project controls package assembled from scope, schedule, cost, risk and change
- Baseline logic, budgets and measurement rules checked for internal consistency
- Forecast calculations tested against variances, remaining work and risk exposure
- Management report presents exceptions, decisions, actions and escalation routes
- Peer review challenges assumptions, traceability, control quality and recovery recommendations
- Formal presentation defends control strategy, forecast and sponsor recommendations
Exercises and examples are adapted to each cohort's sectors and roles.