Course modules
16 modules over 10 daysParticipants can define the governance, decisions and records required for disciplined project cost management.
- Project cost management processes aligned to PMBOK Guide terminology
- AACE estimate classes and decision maturity relationships explained
- Cost estimating, budgeting, funding, and control distinctions defined
- Governance roles for sponsor, project manager, controller, and estimator
- Basis of estimate as an auditable decision record
- Stage-gate cost decisions from concept selection through closeout
Participants can translate approved scope into work packages suitable for estimating and budget control.
- Scope statement translated into a deliverable-oriented work breakdown structure
- Work packages defined with clear boundaries, owners, and acceptance criteria
- Control accounts positioned between work packages and management reporting
- Planning packages used where near-term detail remains unavailable
- WBS dictionary records assumptions, inclusions, exclusions, and estimating references
- Scope baseline approval prevents unpriced work entering the budget
Participants can identify measurable quantities, resource requirements and productivity assumptions for cost estimates.
- Quantity take-offs connect drawings, specifications, and measurable cost drivers
- Units of measure standardised before applying production rates
- Resource-loaded work packages separate labour, materials, equipment, and subcontract costs
- Productivity assumptions tested against site conditions and work methods
- Cost build-ups trace quantities through rates, waste, and allowances
- Estimate worksheets retain source data, calculations, and revision history
Participants can select and apply top-down estimating methods appropriate to project definition maturity.
- Analogous estimates adjusted for size, complexity, location, and inflation
- Parametric models built from validated units, drivers, and ranges
- Regression outputs checked for correlation, outliers, and explanatory limits
- Learning curves model repeated production work and efficiency gains
- Three-point estimates combine optimistic, most likely, and pessimistic values
- Method selection matched to project definition and available evidence
Participants can create detailed work package estimates from labour, material, equipment and subcontract inputs.
- Bottom-up estimates aggregated from resource-loaded work package calculations
- Labour hours converted using grades, rates, shifts, and burdens
- Material pricing distinguishes quotations, catalogues, framework rates, and allowances
- Equipment ownership and operating costs calculated from utilisation assumptions
- Subcontract packages estimated with bid comparisons and scope normalisation
- Estimate reconciliation identifies omissions, overlaps, rounding, and double counting
Participants can quantify cost uncertainty and set contingency reserves using structured risk analysis.
- Risk register converted into cost exposure using probability-impact assessments
- Expected monetary value quantifies individual risks and aggregate exposure
- Decision-tree analysis compares contingent options with different cost consequences
- Monte Carlo simulation produces confidence ranges for total project cost
- Contingency reserves separated from management reserves and undistributed budget
- Confidence levels documented alongside assumptions, exclusions, and estimate maturity
Participants can connect activity schedules, resource plans and cost estimates into an integrated delivery model.
- Network schedules establish activity dates, dependencies, and critical path
- Resource calendars capture availability, shift patterns, and planned absences
- Resource rates assigned consistently across labour, equipment, and facilities
- Resource levelling exposes cost and schedule effects of capacity constraints
- Time-phased quantities align planned work with accounting periods
- Schedule changes assessed before revising resource and cost forecasts
Participants can build and document an approved, time-phased cost baseline for project control.
- Control accounts combine scope, schedule, budget, and responsible ownership
- Work package budgets rolled up through the cost breakdown structure
- Cost baseline time-phased by accounting period and authorised work
- Management reserve held outside the performance measurement baseline
- Funding requirements distinguished from planned expenditure and accruals
- Baseline approval package documents reconciliation, assumptions, and authority
Participants can account for indirect, escalation, tax, currency and lifecycle cost factors.
- Direct, indirect, fixed, and variable costs classified consistently
- Overhead allocations tested against organisational costing policy and drivers
- Escalation applied using indices, timing, currency, and contract terms
- Foreign exchange exposure estimated through rate scenarios and hedging assumptions
- Taxes, duties, permits, and insurance included in total cost
- Lifecycle cost considers acquisition, operation, maintenance, and disposal
Participants can assess supplier pricing, contract structures and procurement cost exposure.
- Make-or-buy analysis compares total cost, capacity, risk, and control
- Bid tabulations normalise supplier proposals to a common scope
- Contract types allocate cost risk between buyer and supplier
- Unit-rate, lump-sum, and reimbursable pricing structures evaluated
- Supplier payment milestones aligned with deliverables, retention, and acceptance
- Procurement allowances reconciled with package budgets and contingency
Participants can forecast project cash requirements and identify funding timing constraints.
- Project cash flow distinguishes commitments, accruals, invoices, and payments
- Payment schedules model deposits, milestones, retention, and payment lags
- Monthly cash forecasts reconcile planned spend with funding availability
- Working capital effects identified from receivables, payables, and inventory
- 13-week rolling cash forecast updated from approved commitments
- Funding drawdown plans reflect financing covenants and approval lead times
Participants can measure cost and schedule performance using earned value management metrics.
- Earned value management integrates scope, schedule, and cost performance
- Planned value, earned value, and actual cost calculated correctly
- Cost and schedule variances interpreted at control account level
- Cost performance index and schedule performance index analysed
- Estimate at completion calculated using appropriate forecasting formulas
- ANSI/EIA-748 control account discipline applied to performance reporting
Participants can prepare realistic cost forecasts and identify the root causes of variance.
- Actual costs reconciled between project records and general ledger
- Committed costs incorporated before invoices arrive for realistic forecasts
- Estimate to complete challenged using remaining quantities and productivity
- Variance root causes separated into rate, quantity, timing, and scope
- Trend logs distinguish emerging exposure from approved budget changes
- Forecast narratives state assumptions, actions, owners, and decision dates
Participants can assess, approve and record cost effects of project changes.
- Change requests priced against approved scope, schedule, and baseline
- Impact assessments quantify direct costs, indirect effects, and risk changes
- Change control board decisions preserve baseline and audit trail
- Budget transfers distinguished from contingency drawdowns and management reserve releases
- Scope creep detected through requirements traceability and work authorisation
- Rebaselining criteria applied only after authorised material changes
Participants can produce decision-ready cost reports and recommend corrective action.
- Cost reports present actuals, commitments, forecasts, and variance explanations
- Dashboard metrics tailored for sponsors, finance teams, and delivery managers
- Estimate basis reviewed through independent challenge and peer review
- Data quality checks test coding, cut-off, completeness, and reconciliation
- Cost governance calendar sets review cadence, thresholds, and escalation routes
- Recovery actions prioritised using cost drivers, risk, and schedule impacts
Participants can build, review and present a complete project estimate, cost baseline, cash forecast and control plan.
- Project brief translated into scope, WBS, assumptions, and cost drivers
- Estimate basis prepared with methods, sources, exclusions, and confidence level
- Resource-loaded estimates built into a time-phased cost baseline
- Risk analysis sets contingency using expected monetary value and scenarios
- Cash forecast, funding plan, and earned value measures completed
- Peer review challenges quantities, rates, risks, and forecast logic
- Executive presentation defends budget, reserves, governance, and recommended actions
Exercises and examples are adapted to each cohort's sectors and roles.