Course modules
16 modules over 10 daysParticipants can frame a rehabilitation project around asset condition, service requirements and investment priorities.
- Rehabilitation, renewal and replacement distinguished through asset lifecycle decisions
- Asset condition ratings linked to service failure and intervention urgency
- Multi-criteria analysis ranks safety, service, cost and social priorities
- Problem statements separate symptoms, root causes and required outcomes
- Baseline asset data assessed for gaps, reliability and inspection needs
- Intervention options compared using lifecycle cost and service consequences
Participants can prepare a clear rehabilitation scope with boundaries, assumptions and acceptance criteria.
- Project charter establishes objectives, authority, constraints and success measures
- Scope statement defines assets, locations, exclusions and handover requirements
- Requirements traceability matrix links stakeholder needs to deliverables
- Existing-condition surveys identify defects, dimensions, utilities and access limitations
- Assumptions log records uncertain information requiring validation before construction
- Acceptance criteria specify tests, tolerances, documents and operational readiness
Participants can plan stakeholder engagement and manage operational interfaces during rehabilitation works.
- Stakeholder mapping assesses influence, interest, impacts and communication needs
- Power-interest grid determines engagement intensity and escalation routes
- Community grievance mechanism records complaints, response ownership and closure
- Utility coordination matrix assigns survey, protection, relocation and approval actions
- Traffic and access plans protect users, businesses and emergency routes
- Interface register tracks dependencies between owners, designers and contractors
Participants can structure rehabilitation work packages and select an appropriate delivery strategy.
- Work breakdown structure decomposes rehabilitation deliverables into controllable packages
- Control accounts connect scope, budget, schedule and accountable managers
- Package boundaries reflect geography, asset systems, trades and access windows
- Make-or-buy analysis compares internal capability, contractors and specialist suppliers
- Construction sequencing considers live operations, temporary works and shutdown periods
- Responsibility assignment matrix clarifies accountable, responsible, consulted and informed parties
Participants can prepare an estimate and approved cost baseline for rehabilitation works.
- Quantity take-offs convert drawings and surveys into measurable work items
- Unit-rate estimates include labour, plant, materials, preliminaries and overheads
- Bottom-up estimating tests scope completeness against work package quantities
- Contingency analysis distinguishes known risks from management reserve requirements
- Cost baseline phases approved budgets against planned work and milestones
- Cash flow forecast aligns contractor payments with funding availability and commitments
Participants can develop a logic-linked schedule for rehabilitation activities and constraints.
- Critical path method identifies controlling activities and completion threats
- Precedence diagramming maps finish-to-start, start-to-start and lag relationships
- Resource loading tests labour, equipment and material demand by period
- Access windows constrain work around traffic, operations and seasonal conditions
- Three-week look-ahead plans convert baseline activities into field commitments
- Schedule narrative explains assumptions, constraints, milestones and recovery options
Participants can identify, assess and treat rehabilitation risks using a structured register.
- ISO 31000 principles establish risk ownership, context and review discipline
- Risk breakdown structure categorises technical, commercial, safety and social threats
- Probability-impact matrix prioritises risks using agreed scoring definitions
- Bow-tie analysis maps causes, preventive controls, consequences and recovery controls
- Risk responses assign avoidance, mitigation, transfer, acceptance and contingency actions
- Early warning indicators trigger management attention before risk escalation occurs
Participants can select procurement routes and prepare contract management requirements for rehabilitation projects.
- Procurement strategy matches market capacity, scope maturity and risk allocation
- Design-bid-build and design-build compared for rehabilitation uncertainty
- Prequalification criteria assess contractor experience, resources, safety and financial capacity
- Bid evaluation matrices score technical compliance, methodology, price and programme
- FIDIC contract principles address notices, variations, claims and payment certification
- Tender documents specify investigations, temporary works and service continuity obligations
Participants can establish quality controls that verify rehabilitation work against defined requirements.
- Inspection and test plans define hold points, witnesses and acceptance evidence
- Method statements describe sequence, plant, controls and quality responsibilities
- Material submittals verify specifications, certificates, samples and approved alternatives
- Nonconformance reports record defects, corrective actions and verification results
- Root cause analysis investigates recurring workmanship and process failures
- As-built records capture installed assets, dimensions, materials and test results
Participants can integrate safety, environmental and social controls into rehabilitation delivery plans.
- Job hazard analysis identifies task hazards, controls and residual risk
- Permit-to-work systems govern confined spaces, excavation and energised assets
- Temporary traffic management separates workers, vehicles, pedestrians and public access
- Environmental management plans control dust, noise, waste, spills and runoff
- Social management measures address access disruption, labour conduct and grievances
- Incident reporting distinguishes immediate response, investigation and corrective action
Participants can manage mobilisation, site logistics and daily coordination for rehabilitation works.
- Mobilisation checklist confirms permits, insurances, staff, equipment and site facilities
- Site logistics plan allocates storage, access, waste routes and welfare areas
- Daily coordination meetings resolve interfaces, constraints and next-shift requirements
- Temporary works register controls design, inspection, alteration and removal approvals
- Field instructions document authorised clarifications without changing contract scope
- Photographic records provide dated evidence of conditions, progress and defects
Participants can measure progress and report schedule, cost and risk performance accurately.
- Physical progress measurement uses quantities, milestones and weighted work packages
- Earned value management calculates planned value, earned value and actual cost
- Schedule performance index indicates progress efficiency against approved baseline
- Cost performance index identifies expenditure efficiency and forecast concerns
- Forecast at completion combines current performance with remaining work estimates
- Dashboard reporting presents progress, risks, decisions and recovery commitments
Participants can control changes and maintain records needed to assess claims fairly.
- Change control board evaluates scope, cost, schedule and risk consequences
- Variation requests distinguish client changes from unforeseen condition adjustments
- Contemporaneous records preserve instructions, notices, photographs and daily reports
- Time impact analysis assesses delay effects on critical path activities
- Extension-of-time submissions connect delay events, notices and programme evidence
- Negotiation preparation defines facts, entitlement positions and settlement boundaries
Participants can plan commissioning and transfer rehabilitated assets into reliable operation.
- Commissioning plan sequences prechecks, functional tests, demonstrations and acceptance
- Punch lists assign defect owners, deadlines, verification and closure evidence
- Operations readiness confirms training, spares, manuals and maintenance arrangements
- Handover dossiers compile warranties, test certificates, drawings and asset records
- Defects liability management tracks notifications, repairs and final release conditions
- Post-project review captures lessons for future rehabilitation programme decisions
Participants can establish governance, reporting and decision structures for rehabilitation programmes.
- Stage-gate reviews test readiness before design, procurement, construction and handover
- Governance matrix defines approvals, delegations, reporting lines and escalation thresholds
- Programme dependency mapping identifies shared utilities, funding and access constraints
- Benefits realisation plan connects completed works to service improvement measures
- Management information systems consolidate cost, schedule, risk and quality data
- Portfolio prioritisation revises investment sequencing using condition and performance evidence
Participants can build, review and present a complete rehabilitation project management plan for a defined infrastructure asset.
- Asset-condition evidence converted into a justified rehabilitation project scope
- Work breakdown, responsibility matrix and delivery strategy integrated coherently
- Baseline schedule and cost plan tested against access constraints
- Risk register, stakeholder plan and safeguards controls reviewed critically
- Procurement, quality and reporting arrangements aligned with contract requirements
- Formal presentation defends delivery decisions, controls and handover strategy
Exercises and examples are adapted to each cohort's sectors and roles.