Course modules
16 modules over 10 daysParticipants can define a transport project’s lifecycle, governance structure and success criteria.
- Transport asset lifecycle stages from strategic need through handback and renewal
- Stakeholder map covering road, rail, port, airport and utility interfaces
- Project success criteria balancing capacity, safety, reliability, cost and carbon
- Systems thinking for interfaces between civil works, operations and maintenance
- Governance roles under sponsor, client, delivery partner and operator models
- Stage-gate decisions aligned with business case maturity and approvals
Participants can translate an approved need into measurable project objectives, benefits and boundaries.
- Five Case Model components for public transport investment decisions
- Benefits map linking outputs, outcomes, operational changes and strategic objectives
- Problem statement tested against demand, capacity, safety and reliability evidence
- Options appraisal using cost-benefit analysis, multi-criteria analysis and affordability
- Assumptions log recording demand, funding, consent and delivery dependencies
- Project definition statement establishing boundaries, exclusions and key constraints
Participants can establish controlled scope baselines from stakeholder and technical requirements.
- Requirements traceability matrix linking user needs, design criteria and verification
- Work breakdown structure separating assets, systems, enabling works and services
- Scope baseline combining approved requirements, WBS dictionary and acceptance criteria
- Define operational requirements for capacity, availability, maintainability and resilience
- Interface requirements between transport systems, utilities, stations and depots
- Acceptance criteria for civil works, systems integration and asset handback
Participants can build a logic-driven baseline programme for transport project delivery.
- Critical path method logic linking design, procurement, construction and commissioning
- Develop work packages from the approved work breakdown structure
- Milestone schedule for consents, land access, possessions and service entry
- Resource-loaded schedules identifying labour, plant, materials and specialist constraints
- Calendar assumptions for night work, possessions and seasonal construction limits
- Schedule quality checks using missing logic, excessive lags and open ends
Participants can plan construction access while protecting live transport operations and users.
- Possession planning for railway access, isolation, protection and restoration activities
- Traffic management plans maintaining road capacity, pedestrian access and emergency routes
- Airport airside permits, work windows and operational coordination controls
- Port marine access constraints affecting dredging, berth works and cargo operations
- Constructability reviews against operational restrictions, access routes and staging requirements
- Operational readiness criteria before reopening roads, railways and passenger facilities
Participants can establish cost baselines, forecasts and control thresholds for project decisions.
- Cost breakdown structure aligned with work packages, contracts and funding categories
- Estimate classes and contingency allowances for concept, design and construction stages
- Quantity-based estimating using drawings, specifications, productivity rates and unit costs
- Time-phased cost baseline matched to programme activities and payment milestones
- Forecast final cost using commitments, accruals, actuals and remaining risk
- Management reserve rules distinguishing known risks from unidentified uncertainty
Participants can assess, quantify and manage transport delivery risks and opportunities.
- Risk breakdown structure covering technical, commercial, operational and external threats
- Risk register fields for cause, event, effect, owner and response
- Probability-impact scoring calibrated through agreed likelihood and consequence definitions
- Monte Carlo schedule risk analysis using duration uncertainty and logic links
- Quantitative risk analysis for contingency ranges and confidence levels
- Early warning indicators for land, utility, consent and supply-chain risks
Participants can plan stakeholder engagement and regulatory actions that protect project commitments.
- Stakeholder salience analysis using power, legitimacy and urgency attributes
- Engagement plan for communities, businesses, operators, regulators and elected representatives
- Consultation records capturing commitments, concerns, responses and accountable owners
- Environmental impact assessment obligations, mitigation measures and consent conditions
- Land acquisition and access coordination through parcel registers and permissions
- Escalation routes for public complaints, media issues and political sensitivities
Participants can match delivery and contract approaches to transport project risks and constraints.
- Procurement strategy comparing design-bid-build, design-build, alliance and construction management
- Packaging decisions for enabling works, civils, systems and specialist equipment
- FIDIC contract families and allocation of design, ground and payment risks
- NEC4 options, early warnings and compensation event administration principles
- Tender evaluation criteria balancing price, capability, methodology and programme certainty
- Supplier due diligence covering capacity, financial standing, safety and past performance
Participants can administer project contracts through notices, records, valuations and claims prevention.
- Contract administration plan defining authorities, correspondence rules and record retention
- Notice requirements for delay, differing conditions, disruption and change events
- Payment certification supported by measurement records, progress evidence and approvals
- Change orders documenting scope, price, time and risk allocation
- Claims avoidance through contemporaneous records, meeting minutes and programme updates
- Dispute escalation using negotiation, adjudication, mediation and arbitration pathways
Participants can measure cost and schedule performance and report exceptions to governance forums.
- Earned value management metrics for planned value, earned value and actual cost
- Schedule performance index and cost performance index interpretation limits
- Progress measurement rules for design, procurement, construction and testing activities
- Control account structure connecting scope, budget, schedule and accountable managers
- Monthly reporting pack covering milestones, risks, changes, safety and forecast outturn
- Exception reports distinguishing variance causes, impacts, decisions and recovery actions
Participants can control technical and organisational interfaces through defined ownership and verification.
- Interface register identifying physical, functional, contractual and operational boundaries
- Interface control documents specifying inputs, outputs, dates and acceptance conditions
- RACI matrix assigning responsibility for cross-package decisions and deliverables
- Systems engineering V-model linking requirements, design, integration and verification
- Configuration management for drawings, specifications, software versions and asset data
- Integration testing sequence for civil assets, power, signalling and communications
Participants can establish assurance arrangements for quality, safety and environmental compliance.
- ISO 9001 quality plans defining inspections, test points and nonconformance handling
- Inspection and test plans for earthworks, structures, track and pavement
- Construction safety management under ISO 45001 principles and permit systems
- Environmental management plans addressing noise, dust, water, waste and biodiversity
- Independent assurance reviews for design maturity, readiness and safety critical work
- Nonconformance reports tracking containment, root cause, corrective action and closure
Participants can assess changes and prepare recovery actions for threatened project commitments.
- Integrated change control from request intake through approval and baseline update
- Change impact assessment covering scope, cost, programme, risk and operations
- Trend register identifying emerging issues before formal change requests
- Delay analysis using as-planned versus as-built and time impact methods
- Recovery schedules using resequencing, resource adjustment, acceleration and scope prioritisation
- Decision logs recording options, approvals, conditions and accountable decision-makers
Participants can plan asset commissioning, operational handover and project closeout evidence.
- Commissioning plan sequencing installation, testing, trial operations and acceptance
- Operational readiness reviews covering people, procedures, spares and emergency arrangements
- Asset information requirements for drawings, maintenance data and configuration records
- Handover checklist covering defects, warranties, training, manuals and certificates
- Defects management process assigning owners, due dates and closure evidence
- Lessons learned review converting delivery evidence into future project actions
Participants can build, review and present a complete transport infrastructure project management pack for governance approval.
- Assemble scope, requirements, schedule, budget and risk baselines into one pack
- Reconcile stakeholder commitments with access, possession and operational constraints
- Review procurement strategy, contract risks and interface ownership assignments
- Test control thresholds against cost, schedule, safety and quality scenarios
- Present governance decisions, escalation routes and recovery actions to reviewers
- Defend handover readiness using evidence from assurance and commissioning plans
Exercises and examples are adapted to each cohort's sectors and roles.