Course modules
21 modules over 10 daysParticipants can explain the maintenance work-management process and assign accountabilities across its main roles.
- Maintenance work management model from request through close-out and learning
- ISO 55000 asset-management principles linked to maintenance value decisions
- Roles of requester, planner, scheduler, supervisor, stores and technician
- Work-order lifecycle, status codes, decision rights and handover points
- Distinguishing reactive, corrective, preventive, predictive and improvement work
- Planning and scheduling measures: wrench time, backlog and schedule compliance
Participants can assess maintenance requests and define the information needed before planning begins.
- Minimum work-request data: asset, symptom, location, consequence and urgency
- Problem statements separating observed condition from assumed repair solution
- Five Whys questioning used to clarify recurring equipment symptoms
- Photographs, drawings and operating history supporting accurate work scoping
- Request screening rules for duplicates, incomplete data and inappropriate priorities
- Operations and maintenance interfaces during work identification and approval
Participants can assign defensible maintenance priorities using consequence, urgency and asset criticality.
- Priority matrix combining safety, environmental, production and quality consequences
- Asset criticality ranking using consequence and probability scoring criteria
- Urgency versus priority when assigning target completion dates
- Risk-based maintenance decisions for degraded but operating equipment
- Escalation criteria for immediate response and emergency work authorization
- Priority-code governance preventing routine work from becoming artificial emergencies
Participants can convert approved work requests into clear, bounded maintenance job scopes.
- Site inspection sequence for defining physical scope and access requirements
- Scope boundaries identifying included tasks, exclusions and interface responsibilities
- Equipment history review before selecting repair, replacement or inspection tasks
- Bill of work developed from drawings, manuals and field observations
- Defining acceptance criteria for returned-to-service equipment condition
- Scope-change controls preventing unapproved additions during work execution
Participants can write job plans that specify safe task sequences, resources and quality checks.
- Job-plan structure: task steps, craft hours, materials and special tools
- Task sequencing using predecessor relationships and defined hold points
- Standard job plans differentiated from asset-specific corrective work plans
- Quality checkpoints inserted before concealment, testing and equipment release
- Clear task language describing action, location, component and acceptance criteria
- Planned-versus-actual feedback used to revise job plans after execution
Participants can estimate labour requirements and balance work against available maintenance capacity.
- Craft-hour estimates based on task content, access and equipment condition
- Estimating crew size without confusing elapsed duration and labour hours
- Allowances for travel, permits, isolation, setup and functional testing
- Historical work-order data used to calibrate estimating assumptions
- Weekly capacity calculation from crew availability, leave and productive time
- Load charts comparing planned craft demand with available labour capacity
Participants can prepare material and service requirements before work enters the weekly schedule.
- Material take-offs developed from job plans and equipment drawings
- Bill of materials checked against stock codes, quantities and specifications
- Kitting process for staging parts, consumables, tools and documentation
- Long-lead material controls using required dates and expediting triggers
- External service scopes defining deliverables, timing, competence and acceptance
- Readiness codes identifying material, tool and service constraints
Participants can integrate safety controls, isolations and operating constraints into maintenance plans.
- Permit-to-work requirements identified during job planning and scheduling
- Lockout-tagout steps linked to isolation plans and authorised persons
- Job safety analysis controls integrated with task sequence and hazards
- Operations handover requirements before equipment isolation and maintenance release
- Simultaneous operations reviewed for conflicts, restricted access and hazards
- Testing and commissioning responsibilities defined before permit closure
Participants can establish a visible, controlled maintenance backlog with actionable work categories.
- Backlog categories separating approved, planned, ready, scheduled and deferred work
- Backlog age analysis identifying stale work orders and review thresholds
- Ready backlog measured in weeks by craft and priority
- Weekly backlog review agenda covering risk, readiness and capacity
- Deferral decisions documented with rationale, controls and revised review dates
- Backlog cleansing rules for duplicates, completed work and obsolete requests
Participants can plan preventive maintenance work to protect compliance and reduce avoidable reactive demand.
- Preventive maintenance task review using failure modes and task purpose
- Calendar-based and meter-based triggers selected for appropriate asset conditions
- Maintenance routes grouped by location, craft and access requirements
- PM compliance measures separated from completion quality and effectiveness
- Overdue preventive work assessed using risk and criticality criteria
- Seasonal maintenance requirements incorporated into rolling maintenance plans
Participants can construct weekly schedules from ready work, labour capacity and operating windows.
- Weekly scheduling cycle from backlog selection through schedule release
- Frozen schedule periods protecting planned work from casual changes
- Schedule loading by craft, shift, location and available hours
- Work selection rules balancing priority, age, readiness and production opportunity
- Daily coordination meetings confirming permits, access and emerging constraints
- Supervisor acceptance of schedules before release to maintenance crews
Participants can manage daily work execution while preserving the integrity of the weekly schedule.
- Daily dispatch board showing assigned work, status and schedule changes
- Morning coordination routines confirming labour, permits, materials and access
- Break-in work criteria distinguishing urgent response from poor planning
- Schedule changes recorded with reason codes and authorisation levels
- Crew feedback captured for actual hours, task changes and material issues
- End-of-day status updates maintaining accurate work-order information
Participants can use critical path logic to plan and control major maintenance work packages.
- Work breakdown structure developed for shutdown and major maintenance scope
- Predecessor logic using finish-to-start and start-to-start relationships
- Critical path method calculations for duration, float and schedule sensitivity
- Milestones defined for isolation, inspection, repair, testing and handover
- Resource constraints assessed against critical-path work and specialist availability
- Recovery actions evaluated after delays to critical maintenance activities
Participants can prepare a controlled shutdown work list, readiness process and execution schedule.
- Shutdown work-list criteria separating essential scope from desirable improvements
- Scope freeze milestones controlling late additions and engineering changes
- Readiness reviews covering drawings, materials, permits and contractor requirements
- Turnaround work packs assembled for field execution and quality records
- Daily progress reporting against milestones, critical path and emerging risks
- Post-shutdown review capturing scope growth, delays and planning lessons
Participants can plan contractor work with defined scope, controls, interfaces and acceptance requirements.
- Contractor work scopes defining boundaries, deliverables, competencies and exclusions
- Site induction, permit and supervision requirements built into work packages
- Interface matrix assigning responsibilities between contractors, operations and maintenance
- Service-level milestones monitored through daily progress and quality checks
- Contractor labour loading included within integrated weekly maintenance schedules
- Completion dossiers checked before acceptance, payment approval and close-out
Participants can define CMMS data standards that support planning, scheduling and maintenance analysis.
- Mandatory CMMS fields for asset, failure, labour, materials and status
- ISO 14224 failure-data concepts applied to equipment history coding
- Failure codes distinguishing component, mechanism, cause and corrective action
- Work-order close-out standards for hours, quantities, findings and recommendations
- Master-data controls for equipment hierarchy, task lists and material records
- Data-quality audits identifying missing, inconsistent and misleading maintenance information
Participants can calculate and interpret measures that show planning quality and schedule execution performance.
- Schedule compliance calculated from completed scheduled work and approved changes
- Planned work percentage measured using defined planning-quality criteria
- Backlog size reported by craft, priority, readiness and ageing
- Break-in work percentage analysed by source, urgency and recurring causes
- PM compliance reviewed alongside overdue risk and work quality
- KPI review routines linking performance trends to specific corrective actions
Participants can investigate recurring schedule failures and select practical corrective actions.
- Pareto analysis identifying dominant reasons for schedule non-compliance
- Five Whys analysis applied to recurring material and access delays
- Cause-and-effect diagrams organising people, process, equipment and information factors
- Constraint logs tracking unresolved issues, owners and target completion dates
- Corrective action plans specifying controls, measures and review dates
- Learning reviews converting execution feedback into planning-standard improvements
Participants can design governance routines that sustain maintenance planning and scheduling discipline.
- Work-management meetings defined by purpose, attendees, inputs and decisions
- RACI matrix assigning accountability for planning, scheduling and execution
- Standard operating procedures controlling work-order status and handoffs
- Maturity assessment identifying priority gaps in work-management process discipline
- Improvement roadmap sequencing quick fixes, capability building and system changes
- Management review packs linking maintenance measures to operational performance
Participants can align maintenance planning priorities with asset strategy, risk and operating objectives.
- Maintenance strategy links between asset criticality, failure modes and job plans
- Risk register inputs used when prioritising deferred maintenance work
- Reliability-centred maintenance outputs translated into planned maintenance activities
- Bad-actor equipment reviewed using repeat work orders and downtime history
- Operating windows negotiated from production plans and equipment constraints
- Capital replacement decisions distinguished from recurring maintenance scope
Participants can build, review and present a complete maintenance planning and scheduling pack for a defined asset area.
- Asset-area case data reviewed for demand, risk, capacity and constraints
- Work requests screened using priority, criticality, scope and readiness criteria
- Job plans prepared with tasks, labour, materials, permits and acceptance checks
- Backlog analysis produced using age, status, craft and risk categories
- Weekly schedule built with capacity loading, frozen work and contingencies
- Performance measures selected for compliance, backlog, break-ins and planned work
- Improvement actions presented with owners, milestones and governance routines
Exercises and examples are adapted to each cohort's sectors and roles.