Course modules
20 modules over 10 daysParticipants can map the SAP PM process from maintenance request to financial settlement.
- SAP PM objects within SAP S/4HANA Asset Management architecture
- Process map from notification through order closure and settlement
- Maintenance strategies linked to corrective, preventive and condition-based work
- Plant maintenance integration points with MM, FI, CO and QM
- Roles, authorisations and audit trails in maintenance transactions
- Asset hierarchy decisions affecting planning, reporting and cost collection
Participants can define master-data structures that support planning, history and reporting.
- Maintenance planning plants, planner groups and work centres defined
- Functional locations structured by system, location and maintainable boundaries
- Equipment records built with manufacturer data, warranties and classification
- Object types selected for serialised assets and repairable spares
- Bills of materials assigned to equipment and functional locations
- Class characteristics standardise asset attributes and reporting filters
Participants can create controlled maintenance requests and capture usable failure information.
- Notification types distinguish breakdown, malfunction, activity and service requests
- Catalog profiles code damage, causes, activities and object parts
- Priority matrices translate business impact into response and completion targets
- Malfunction start and finish times produce downtime records
- Long-text standards capture symptom, condition and technical findings
- Notification status controls handover, approval and order creation
Participants can create maintenance orders with controlled scope, status and technical context.
- Order types govern planning, execution, settlement and approval routes
- Control keys determine internal labour, external services and confirmation requirements
- Operations, suboperations and relationships represent executable job sequences
- Standard text keys create repeatable scopes, methods and acceptance criteria
- Maintenance order statuses prevent premature release, closure and settlement
- Reference objects carry history, costs and technical context into orders
Participants can build reusable job plans and derive planned maintenance costs.
- Task lists capture operations, components, tools and standard labour values
- General task lists support reusable methods across similar asset classes
- Equipment task lists preserve asset-specific work instructions and history
- Functional-location task lists organise system-level inspection and servicing work
- Work centres provide capacity, activity types and scheduling formulas
- Planned costs derive from labour, materials, services and overheads
Participants can control material and service requirements within maintenance orders.
- BOM reservations identify planned components before order release
- Material availability checks expose shortages and procurement lead-time risks
- External operations create purchase requisitions, service entry and invoice controls
- Service specifications define scope, quantities, acceptance and commercial limits
- Repairable spares processes track removal, refurbishment and return-to-stock
- Goods issues and returns preserve order-level material cost traceability
Participants can schedule maintenance work against capacity, priority and operating constraints.
- Order dates calculated through operation durations, relationships and floats
- Capacity requirements compared against work-centre availability and shift calendars
- Dispatching rules sequence ready work by priority, dates and constraints
- Maintenance backlog segmented by age, priority, craft and asset criticality
- Weekly schedules freeze committed work and protect emergency capacity
- Schedule compliance distinguishes planned, scheduled, started and completed work
Participants can control order release, execution confirmation, technical completion and closure.
- Order release confirms permits, materials, capacity and technical readiness
- Mobile execution captures confirmations, measurements, photos and failure codes
- Actual labour and material postings compare execution against plan
- Partial confirmations record progress, remaining work and revised completion dates
- Technical completion controls outstanding reservations, purchasing and follow-up actions
- Order closure validates history, costs and settlement readiness
Participants can design time-based maintenance plans using cycles, packages and scheduling parameters.
- Time-based strategies define cycle sets, packages and call horizons
- Single-cycle plans schedule recurring inspections, lubrication and statutory tasks
- Strategy plans bundle short, medium and long interval packages
- Maintenance items connect task lists to equipment or functional locations
- Scheduling parameters control call objects, tolerances and automatic release
- Maintenance plan completion updates due dates using confirmation data
Participants can use measurement data to trigger and schedule condition-based maintenance work.
- Measuring points define counters, readings, limits and measurement positions
- Measurement documents record meter readings, condition values and timestamps
- Counter-based plans generate calls from operating hours, distance or cycles
- Performance-based scheduling uses estimated and actual counter readings
- Threshold values trigger notifications from adverse condition measurements
- Data quality checks identify implausible readings and missing measurements
Participants can connect maintenance orders with isolation, permit and return-to-service controls.
- Work clearance management links maintenance orders to isolation and permits
- Permit-to-work steps coordinate operations, safety roles and release conditions
- Lockout-tagout requirements documented through operational and maintenance procedures
- Safety measures assign personal protective equipment and hazard controls
- Clearance statuses prevent work before isolation verification and approval
- Return-to-service checks confirm reinstatement, testing and operational handover
Participants can analyse maintenance cost and apply order-level financial controls.
- Cost elements separate labour, materials, services and overhead allocations
- Planned-versus-actual analysis identifies estimate errors and execution variance
- Settlement rules transfer maintenance costs to cost centres or assets
- Order budgets set tolerance limits and approval escalation points
- Activity types price internal labour through controlling rate structures
- Cost reports support monthly accruals, forecasts and variance commentary
Participants can define maintenance KPIs and interpret performance from SAP PM data.
- Backlog weeks calculated from labour demand and available craft capacity
- Schedule compliance tracks work completed within committed weekly windows
- Planned maintenance percentage separates proactive orders from reactive work
- Mean time between failures uses operating time and functional failures
- Mean time to repair combines repair durations and repair counts
- Dashboard definitions reconcile SAP order data with management KPI rules
Participants can identify recurring asset losses and investigate their underlying causes.
- Failure codes standardise problem, damage, cause and remedy analysis
- ISO 14224 taxonomy aligns equipment classes, failure modes and data fields
- Pareto charts rank repeat failures by frequency, downtime and cost
- Five Whys tests causal chains beyond immediate repair observations
- Cause-and-effect diagrams organise mechanical, electrical, process and human factors
- Bad-actor registers prioritise assets by recurring loss and intervention value
Participants can select maintenance strategies using criticality, FMEA and RCM decision logic.
- Asset criticality matrices score safety, environmental, production and cost consequences
- FMEA identifies failure modes, effects, controls and risk priorities
- RCM decision logic selects condition-based, scheduled, redesign or run-to-failure tasks
- Weibull analysis distinguishes infant mortality, random failures and wear-out patterns
- Maintenance strategies revised using failure evidence, task effectiveness and economics
- Reliability improvement proposals define owner, action, benefit and verification measure
Participants can explain and manage SAP PM integration points affecting maintenance delivery.
- MM integration converts component demand into reservations and purchase requisitions
- FI and CO integration posts maintenance costs and settlement documents
- Quality notifications connect inspection findings with corrective maintenance orders
- Project System links shutdown work packages to project structures
- Document Management System attaches drawings, procedures and certificates
- GIS and linear asset references locate work on networked infrastructure
Participants can plan and control maintenance work executed during planned outages.
- Shutdown scopes assemble work lists, resources, materials and contractor requirements
- Network logic sequences outage tasks using dependencies, durations and milestones
- Critical-path analysis identifies schedule drivers and float consumption
- Turnaround readiness reviews test drawings, spares, permits and work packs
- Daily control rooms manage progress, constraints, changes and recovery actions
- Post-outage reviews capture lessons, cost variance and scope growth
Participants can establish governance controls for maintenance data quality and accountability.
- Master-data ownership assigns creation, change approval and periodic review responsibilities
- Data standards define naming, coding, mandatory fields and validation rules
- Duplicate detection resolves redundant equipment, materials and functional locations
- Migration mapping reconciles legacy fields with SAP object structures
- Role-based access separates requester, planner, supervisor and cost approval duties
- Audit extracts demonstrate status history, approvals and master-data changes
Participants can define process ownership, governance routines and improvement priorities for SAP PM.
- Maintenance process maps define handoffs from request through performance review
- RACI matrices assign accountable roles for planning, execution and closeout
- Planner-scheduler routines establish weekly gates, backlog reviews and escalation
- Standard job plans reduce planning variability and improve estimate quality
- Data review cadences convert KPI exceptions into corrective actions
- Implementation roadmaps sequence governance, master data, process and reporting changes
Participants can build, review and present a complete SAP PM maintenance and asset reliability work pack.
- Asset register excerpt establishes functional locations, equipment and criticality rankings
- Notification analysis identifies failure patterns, priorities and corrective requirements
- Maintenance plan combines task lists, cycles, packages and measurement triggers
- Order work pack specifies operations, materials, services, costs and safety controls
- Weekly schedule balances backlog, capacity, permits and material availability
- Reliability proposal applies FMEA, KPIs and a quantified action register
- Peer review tests data quality, process controls and presentation rationale
Exercises and examples are adapted to each cohort's sectors and roles.








