Course modules
18 modules over 10 daysParticipants can explain RCM principles, scope and conformance requirements for an implementation.
- RCM purpose: preserving asset functions rather than maintaining equipment condition
- SAE JA1011 evaluation criteria for a valid RCM process
- SAE JA1012 guidance for applying RCM concepts consistently
- Maintenance policy types: corrective, preventive, predictive and failure-finding
- Relationship between RCM, asset management and maintenance work management
- Screening candidate systems by risk, downtime, cost and failure history
Participants can define the governance, scope, data and team arrangements for an RCM study.
- RCM charter defining objectives, boundaries, decisions and expected deliverables
- Select cross-functional team members with operational and technical authority
- System boundary diagrams showing inputs, outputs, interfaces and exclusions
- Asset hierarchy alignment between engineering records and CMMS equipment structures
- Information requirements: drawings, manuals, work orders, alarms and process data
- Facilitator, scribe and technical authority roles during RCM sessions
Participants can document operating context and measurable asset functions for an RCM analysis.
- Operating context captured through duty cycle, environment and demand profile
- Primary functions stated with measurable performance standards and tolerances
- Secondary functions covering containment, protection, control and information
- Define hidden functions whose failure remains undiscovered during normal operation
- Performance standards linked to production, quality, safety and service requirements
- Functional block diagrams connecting equipment items to required system outputs
Participants can identify functional failures and credible failure modes without confusing symptoms and causes.
- Functional failures expressed as complete loss or degraded performance
- Failure modes recorded at an appropriate level of technical specificity
- Distinguish failure cause, failure mode, failure mechanism and observable symptom
- Use work-order history to validate recurring failure mode assumptions
- Human error modes considered within operating and maintenance tasks
- Failure mode wording aligned with ISO 14224 failure taxonomy
Participants can describe failure effects in sufficient detail to support consequence evaluation.
- Failure effects describe what happens after each failure mode occurs
- Record local effects, system effects and evidence available to operators
- Sequence protective devices, alarms, trips and standby equipment responses
- Estimate outage duration including detection, diagnosis, repair and restart
- Identify collateral damage caused by continued operation after failure
- Document existing maintenance tasks and their actual failure-control purpose
Participants can classify failure consequences and prioritise analysis effort using risk-based criteria.
- Hidden failure consequences assessed through multiple failure combinations
- Safety consequences evaluated against credible harm and exposure pathways
- Environmental consequences assessed against release, permit and remediation impacts
- Operational consequences quantified through lost output, quality and service disruption
- Non-operational consequences measured through direct repair and replacement costs
- Criticality matrices calibrated with consequence definitions and likelihood bands
Participants can apply structured RCM decision logic to select technically feasible maintenance actions.
- Decision logic begins with hidden, safety, environmental and operational consequences
- Technical feasibility tests determine whether proactive tasks can prevent failure
- Potential failure identification supports condition-based task selection decisions
- Failure-finding tasks test protective functions with hidden failure consequences
- Default actions selected when no proactive task is technically feasible
- Document task decisions, rationale, assumptions and residual risk acceptance
Participants can specify condition-based maintenance tasks with meaningful warning intervals and response actions.
- P-F interval defines time between potential and functional failure
- Condition indicators selected for relevance, detectability and failure progression
- Vibration analysis applied to imbalance, misalignment, looseness and bearing defects
- Lubricant analysis identifies contamination, wear debris and lubricant degradation
- Thermography detects electrical resistance, insulation deterioration and mechanical friction
- Inspection routes specify method, interval, alert limit and corrective response
Participants can select restoration and replacement tasks based on age-related failure evidence.
- Age-reliability patterns distinguish wear-out failures from random failure behaviour
- Restoration tasks restore resistance to an identifiable age-related failure mode
- Scheduled replacement eliminates components before established wear-out exposure
- Weibull analysis estimates characteristic life, shape parameter and failure probability
- Task intervals balance failure risk, intervention cost and production windows
- Overhaul-induced failures considered before prescribing intrusive maintenance tasks
Participants can develop failure-finding tasks for hidden protective and standby functions.
- Hidden functions include trips, interlocks, relief devices and standby equipment
- Failure-finding intervals determined from allowable unavailability and consequence severity
- Proof tests verify protective function response, setpoint and restoration requirements
- Test coverage limitations recorded for partial stroke and functional testing
- Protective device bypass controls prevent unplanned exposure during testing
- Document test acceptance criteria, evidence and corrective action requirements
Participants can justify run-to-failure decisions and specify appropriate default actions.
- Run-to-failure decisions require acceptable safety, environmental and operational consequences
- Economic analysis compares planned task cost with corrective failure cost
- Design modification considered when repeated failure remains unacceptable
- One-time changes address installation errors, design defects and operating practices
- Redundancy options assessed for risk reduction, maintainability and common-cause failures
- Spare parts strategy supports approved corrective maintenance response times
Participants can convert RCM decisions into clear, executable maintenance task specifications.
- Task statements specify action, asset, method, standard and acceptance criteria
- Job plans identify labour skills, tools, permits and material requirements
- Inspection standards define observable conditions, limits and escalation triggers
- Maintenance intervals assigned by calendar time, runtime, cycles or condition
- Route-based tasks grouped without compromising required inspection timing
- Precision maintenance requirements include alignment, torque, cleanliness and lubrication controls
Participants can translate approved RCM outputs into controlled CMMS maintenance plans and records.
- CMMS asset records reflect approved system boundaries and equipment hierarchy
- Preventive maintenance plans contain task steps, frequencies and triggering rules
- Failure codes capture component, failure mode, cause and remedy
- Job plan libraries control standard work, safety instructions and quality checks
- Work order feedback fields support task review and failure data improvement
- Change control protects approved maintenance strategies from undocumented alterations
Participants can use maintenance and operational data to validate RCM assumptions and priorities.
- Data quality review checks completeness, consistency, coding and timestamp accuracy
- Pareto analysis identifies dominant downtime, cost and repeat failure contributors
- Mean time between failures measured with clear population and exposure definitions
- Mean time to repair separates active repair time from logistical delay
- Bad actor analysis prioritises assets with chronic operational or maintenance impact
- Trend charts test whether maintenance changes improve failure performance
Participants can facilitate focused RCM sessions and manage technical disagreement constructively.
- Facilitation agenda maintains progression from functions through task decisions
- Evidence hierarchy separates field data, engineering judgement and unsupported opinion
- Challenge assumptions using failure evidence, drawings and operating experience
- Consensus rules define when technical authority must resolve disagreement
- Scribe discipline preserves traceability between worksheets and task recommendations
- Quality assurance reviews completed RCM records against SAE JA1011 criteria
Participants can plan phased RCM deployment, stakeholder adoption and governance controls.
- Implementation roadmap sequences pilot systems, review gates and deployment waves
- Benefits cases quantify labour changes, downtime reduction and avoided risk
- Stakeholder mapping identifies operators, maintainers, planners and approvers
- Training plans address new inspection methods, standards and work instructions
- Management of change controls approve maintenance strategy and interval revisions
- Governance forums review overdue actions, residual risks and implementation progress
Participants can establish measures and review cycles that keep RCM strategies effective after implementation.
- Leading indicators track task compliance, defect identification and overdue work
- Lagging indicators measure functional failures, downtime and consequence events
- Maintenance effectiveness review tests whether tasks detect or prevent failures
- Interval optimisation uses inspection findings, failure history and task performance
- RCM living programme triggers review after incidents, modifications and demand changes
- Audit checklists test data traceability, task quality and decision conformance
Participants can build, review and present a complete RCM analysis and implementation plan for a priority asset system.
- Define system boundaries, operating context, functions and performance standards
- Analyse functional failures, failure modes, effects and consequence classifications
- Apply RCM decision logic to select justified maintenance actions
- Draft CMMS-ready task specifications, intervals and acceptance criteria
- Prepare implementation roadmap, governance controls, measures and resource requirements
- Present analysis findings and defend decisions during technical peer review
Exercises and examples are adapted to each cohort's sectors and roles.