Course modules
10 modules over 5 daysParticipants can connect maintenance requirements, asset criticality and service targets to spare-parts planning decisions.
- Service-level targets linked to asset criticality, downtime cost and lead time
- Maintenance strategies: corrective, preventive, predictive and condition-based maintenance requirements
- Failure modes translated into spare-part demand drivers and stocking implications
- Criticality matrices separating safety, production, environmental and cost consequences
- Bill of materials relationships between equipment, assemblies and replaceable components
- Common terminology: MRO, rotable, repairable, consumable, insurance and strategic spares
Participants can segment spare parts and identify master-data conditions needed for reliable planning.
- Item master data fields governing planning, replenishment, traceability and obsolescence control
- ABC analysis using annual usage value and Pareto concentration
- XYZ classification from demand variability and forecastability measures
- ABC-XYZ matrix assigning differentiated review, service and stocking policies
- FSN analysis identifying fast-moving, slow-moving and non-moving inventory
- Data cleansing rules for duplicates, units, lead times and supersessions
Participants can select and assess forecasting methods for spare parts with irregular demand.
- Demand-pattern diagnosis using average demand interval and squared coefficient variation
- Intermittent-demand characteristics distinguished from lumpy, erratic and smooth consumption
- Croston's method separating demand size from inter-demand interval estimation
- Syntetos-Boylan Approximation correcting Croston bias for intermittent demand
- Moving averages and exponential smoothing for stable, non-intermittent demand
- Forecast error measures: MAD, MAPE, bias and tracking signal
- Forecast value added assessed against naïve and planner-adjusted forecasts
Participants can combine historical consumption with maintenance and engineering information to improve demand plans.
- Maintenance plans converted into time-phased planned spare-part requirements
- Work-order history analysed for failure codes, quantities and replacement intervals
- Installed-base changes incorporated into demand rates and stocking assumptions
- Engineering change notices controlled through effectivity dates and supersession chains
- Project shutdowns and turnarounds separated from recurring maintenance demand
- Planner overrides documented with reason codes, assumptions and expiry dates
Participants can model supply uncertainty and incorporate supplier and repair performance into planning parameters.
- End-to-end replenishment lead time mapped from requisition through goods receipt
- Lead-time distributions measured using purchase-order history rather than supplier promises
- Supplier performance tracked through on-time delivery, completeness and quality measures
- Repair-loop turnaround time modelled for rotable and repairable components
- Minimum order quantities, pack sizes and transport constraints factored into plans
- Supply-risk segmentation combining single-source exposure, geography and substitute availability
Participants can calculate and select replenishment parameters suited to part characteristics and service requirements.
- Continuous-review reorder points calculated from demand, lead time and safety stock
- Periodic-review order-up-to levels set for scheduled purchasing cycles
- Safety stock derived from service targets and demand-lead-time variability
- Cycle service level distinguished from fill rate and equipment availability
- EOQ applied where ordering, holding and demand assumptions remain valid
- Min-max settings aligned with criticality, review frequency and replenishment constraints
- Insurance spares justified through consequence analysis rather than usage frequency
Participants can determine where inventory should be held and assess alternatives to local stocking.
- Multi-echelon stocking roles assigned across central, regional and site warehouses
- Pooling benefits assessed for low-demand parts across multiple operating locations
- Transshipment rules defined for urgent demand, ownership and replenishment responsibility
- Consignment, vendor-managed inventory and framework agreements evaluated for critical items
- Repairable exchange pools balanced against repair capacity and turnaround time
- Stocking-location decisions tested against response time, freight and downtime costs
Participants can manage planning-system exceptions and maintain inventory records that support reliable replenishment.
- MRP parameters aligned with independent demand, dependent demand and maintenance schedules
- Planning exceptions reviewed for shortages, excess stock, reschedule messages and late orders
- Purchase requisitions released using approved planning rules and authority limits
- Cycle-count programmes targeted through ABC class, record accuracy and risk
- Inventory record accuracy investigated using root-cause codes and corrective actions
- Warehouse replenishment signals connected to bin locations, reservations and issue transactions
Participants can identify lifecycle risks and make evidence-based decisions on excess and obsolete spares.
- Obsolescence risk identified from supplier notices, technology changes and declining usage
- Last-time-buy quantities evaluated against forecast horizon, alternatives and carrying cost
- Supersession chains maintained to prevent duplicate buying and unusable residual stock
- Excess and dormant stock segmented by recoverability, return options and disposal
- Disposition decisions compare redeployment, repair, resale, scrapping and controlled retention
- Inventory write-off proposals supported by evidence, approvals and financial impact
Participants can establish performance controls and a prioritised plan for improving spare-parts planning.
- Spare-parts KPI hierarchy linking availability, service, inventory investment and obsolescence
- Dashboard measures defined for forecast accuracy, fill rate, turns and stockouts
- Monthly planning cadence assigns inputs, decisions, escalation routes and owners
- Parameter-review triggers set for demand shifts, lead-time changes and criticality revisions
- RACI matrix clarifies planner, maintenance, engineering, procurement and warehouse accountabilities
- 90-day improvement plan prioritises data, policy and supplier actions
Exercises and examples are adapted to each cohort's sectors and roles.








