Course modules
20 modules over 10 daysParticipants can define an energy opportunity using demand, emissions, cost and reliability evidence.
- Energy transition drivers: electrification, decarbonisation targets, fuel-price exposure, and resilience
- National energy balances interpreted using primary, final, and useful energy
- Demand profiles separated into baseload, variable, seasonal, and critical loads
- Scope 1 and 2 emissions linked to energy procurement decisions
- Energy policy instruments: auctions, tax credits, mandates, and carbon pricing
- Materiality matrix distinguishes cost, emissions, reliability, and stakeholder priorities
Participants can compare renewable technologies against a defined project requirement.
- Solar photovoltaic systems compared by scale, mounting, output, and constraints
- Wind turbine projects assessed through wind regime, terrain, setbacks, and access
- Bioenergy pathways distinguished by feedstock, conversion technology, and supply security
- Hydropower and geothermal options screened against resource and permitting conditions
- Technology selection matrix scores cost, yield, maturity, impacts, and reliability
- Hybrid generation combinations matched to operational demand and grid availability
Participants can prepare an energy baseline suitable for renewable project screening.
- Twelve-month utility bills converted into consumption, demand, tariff, and cost data
- Interval meter data analysed for daily, weekly, and seasonal load patterns
- Energy-use intensity calculated per floor area, production unit, or service output
- Load inventory identifies critical equipment, operating hours, and backup requirements
- Baseline adjustments account for weather, occupancy, production, and planned expansion
- Data-quality checks identify missing intervals, estimated readings, and unusual consumption
Participants can estimate preliminary solar PV output from resource and site information.
- Global horizontal irradiance converted into plane-of-array solar resource estimates
- PVGIS and meteorological datasets compared for resource-data uncertainty
- Shading analysis identifies obstruction losses from buildings, trees, and terrain
- Performance ratio separates irradiation, temperature, soiling, inverter, and cable losses
- Module orientation and tilt tested against annual yield and load timing
- Preliminary PV yield expressed in kilowatt-hours per kilowatt-peak annually
Participants can judge whether a wind opportunity merits further technical investigation.
- Wind-speed distributions represented using Weibull parameters and measurement records
- Hub-height extrapolation applies wind-shear assumptions to measured site data
- Turbine power curves translate wind speeds into expected annual generation
- Wake losses estimated from turbine spacing, prevailing winds, and terrain
- Capacity factor tested against resource quality, curtailment, and availability assumptions
- Setback, aviation, noise, and visual constraints recorded during initial screening
Participants can screen dispatchable renewable technologies using resource and operational criteria.
- Feedstock assessment covers quantity, seasonality, moisture, competing uses, and transport
- Anaerobic digestion matched to organic waste composition and digestate management
- Biomass combustion evaluated through fuel quality, emissions controls, and storage
- Small hydropower screening considers head, flow duration, abstraction, and ecology
- Geothermal resource concepts distinguish shallow heat, direct use, and power generation
- Dispatchable renewable output valued against thermal fuel displacement and reliability needs
Participants can identify storage roles and size preliminary hybrid-system configurations.
- Battery storage applications separated into shifting, backup, peak shaving, and balancing
- Lithium-ion battery specifications compared using capacity, power, cycles, and degradation
- State-of-charge profiles tested against generation variability and critical-load requirements
- Round-trip efficiency and depth-of-discharge incorporated into usable storage calculations
- Hybrid solar, battery, diesel configurations modelled for remote and weak-grid sites
- Battery safety requirements address thermal management, fire protection, and access control
Participants can identify grid connection requirements and likely integration constraints.
- Interconnection studies examine voltage limits, fault levels, protection, and hosting capacity
- Net metering, net billing, and feed-in tariffs compared for project revenues
- Inverter functions support voltage ride-through, reactive power, and frequency response
- Curtailment risk assessed from grid congestion, dispatch rules, and generation timing
- Power-quality issues include harmonics, flicker, voltage imbalance, and transients
- Single-line diagrams communicate generation, metering, protection, and connection interfaces
Participants can conduct a preliminary site-screening assessment for renewable development.
- Site-screening checklist records land tenure, access, slope, drainage, and security
- GIS mapping identifies exclusions, easements, protected areas, and nearby infrastructure
- Grid-connection proximity assessed against route length, voltage level, and upgrade costs
- Planning permits sequenced with environmental approvals, licences, and stakeholder consultation
- Land agreements distinguish lease, easement, purchase, concession, and community benefit
- Fatal-flaw analysis prioritises constraints requiring resolution before development expenditure
Participants can identify and manage major environmental and social issues in renewable projects.
- Environmental and social impact assessment scopes receptors, pathways, impacts, and mitigation
- IFC Performance Standards applied to land use, labour, biodiversity, and communities
- Biodiversity screening addresses habitat loss, bird collision, bats, and protected species
- Stakeholder engagement plan maps affected groups, concerns, communication, and grievance channels
- Construction management controls dust, noise, traffic, waste, and erosion
- Decommissioning provisions address asset removal, land restoration, recycling, and financial security
Participants can prepare a preliminary financial appraisal for a renewable energy project.
- Capital expenditure separates equipment, civil works, development, connection, and contingency
- Operating expenditure estimates maintenance, insurance, land rent, administration, and replacement
- Levelized Cost of Energy calculates lifetime cost per generated kilowatt-hour
- Discounted cash flow estimates net present value, internal rate, and payback
- Sensitivity analysis tests irradiation, tariff, capital cost, inflation, and degradation
- Avoided-cost calculations distinguish retail tariffs, demand charges, fuel, and carbon costs
Participants can compare financing structures and allocate key project risks.
- Balance-sheet ownership compared with leasing, project finance, and energy-service models
- Debt-service coverage ratio interpreted for lender assessment of repayment capacity
- Equity returns tested using distribution waterfalls, exit assumptions, and tax treatment
- Blended finance structures combine grants, concessional debt, guarantees, and commercial capital
- Risk allocation matrix assigns development, construction, resource, market, and political risks
- Investment committee papers present assumptions, approvals, conditions, and decision options
Participants can select a procurement route and assess core renewable energy contract terms.
- On-site solar procurement compares purchase, lease, solar service, and PPA models
- Physical and virtual power purchase agreements distinguished by delivery and settlement
- Request-for-proposal documents define scope, technical requirements, pricing, and guarantees
- Bid evaluation matrix weights technical compliance, commercial value, delivery, and safeguards
- PPA terms address tenor, tariff escalation, volume, curtailment, and termination
- Renewable energy certificates assessed for ownership, retirement, and claims integrity
Participants can define technical requirements and quality controls for renewable energy assets.
- Employer's requirements specify output, design life, codes, interfaces, and acceptance tests
- IEC 62446-1 requirements guide photovoltaic documentation, inspection, and commissioning
- Factory acceptance tests verify equipment performance before shipment and installation
- Site acceptance tests confirm output, protection settings, safety, and communications
- Quality inspection plans assign hold points, witness points, records, and responsibilities
- Defect-liability provisions define correction periods, response times, and retention amounts
Participants can plan major construction controls for renewable energy project delivery.
- Work breakdown structures organise development, procurement, construction, commissioning, and handover
- Critical path method identifies schedule dependencies, float, milestones, and delay exposure
- Construction logistics plan addresses access roads, lifting, storage, traffic, and workforce
- Permit-to-work systems control electrical isolation, excavation, lifting, and work-at-height
- HSE plans identify hazards, controls, emergency response, training, and reporting
- Contractor performance tracked through schedule, quality, safety, cost, and change indicators
Participants can establish operating controls and performance measures for renewable assets.
- Operations and maintenance strategy distinguishes preventive, predictive, corrective, and condition-based work
- SCADA data monitors generation, availability, alarms, inverter status, and weather conditions
- Performance guarantees tested against contractual reference conditions and measurement methods
- Availability calculations separate planned outages, forced outages, curtailment, and grid interruptions
- Maintenance planning covers spares, service contracts, warranties, inspections, and response times
- Asset management plans define ownership, records, budgets, inspections, and lifecycle decisions
Participants can measure renewable energy performance and report credible emissions outcomes.
- Metering architecture distinguishes revenue meters, operational meters, submeters, and check meters
- Measurement and verification plans define baselines, boundaries, variables, and reporting periods
- IPMVP options selected for retrofit savings, generation, and facility-level changes
- GHG Protocol Scope 2 methods compare location-based and market-based reporting
- Emissions factors selected using grid data, fuel factors, and contractual instruments
- Performance dashboards communicate generation, savings, emissions, availability, and exceptions
Participants can incorporate lifecycle impacts and end-of-life planning into project decisions.
- ISO 14040 and ISO 14044 frame lifecycle assessment goals and boundaries
- Embodied carbon compared across modules, inverters, batteries, structures, and transport
- Supply-chain due diligence examines minerals, labour conditions, traceability, and supplier controls
- Circular procurement requirements address repairability, warranties, reuse, recycling, and take-back
- Battery end-of-life pathways compare second life, recycling, storage, and disposal
- Lifecycle cost analysis includes replacement cycles, decommissioning, remediation, and residual value
Participants can govern renewable energy projects through structured risks, controls and approvals.
- Risk register records cause, event, consequence, likelihood, owner, and response
- Bow-tie analysis links preventive controls, recovery measures, and assurance activities
- Stage-gate governance defines feasibility, development, investment, construction, and handover decisions
- Change-control procedures assess scope, cost, schedule, quality, and approval impacts
- Project dashboards report milestones, budget, risks, permits, procurement, and technical performance
- Lessons-learned reviews capture decisions, variances, outcomes, and reusable improvements
Participants can build, review and present a complete renewable energy solution business case.
- Project brief defines demand, objectives, site conditions, stakeholders, and decision criteria
- Technology selection substantiated through resource, load, cost, grid, and safeguards evidence
- Preliminary yield and financial model state assumptions, sensitivities, and decision thresholds
- Procurement strategy sets contract route, evaluation criteria, governance, and timetable
- Implementation roadmap sequences approvals, design, construction, commissioning, and performance monitoring
- Executive presentation communicates recommendation, risks, funding need, benefits, and next decisions
Exercises and examples are adapted to each cohort's sectors and roles.