Course modules
19 modules over 10 daysParticipants can explain how renewable energy changes electricity supply, demand and investment decisions.
- Primary energy, final energy and electricity defined using energy balances
- Electricity supply chain from generation through transmission, distribution and consumption
- Power, energy, capacity and load expressed in standard engineering units
- Demand profiles, peak demand and load factor interpreted from interval data
- Decarbonisation drivers: emissions targets, fuel prices, security and air quality
- Energy trilemma trade-offs between affordability, reliability and environmental performance
Participants can screen renewable resources using appropriate data sources and quality checks.
- Solar irradiation measured as global horizontal and plane-of-array values
- Wind speed distributions analysed using Weibull parameters and hub-height adjustment
- Hydrological flow records converted into seasonal hydroelectric generation potential
- Biomass feedstock availability assessed by quantity, quality, distance and seasonality
- Geothermal resource indicators include temperature gradient, permeability and reservoir depth
- Data quality checks address measurement periods, missing values and representativeness
Participants can describe photovoltaic system design choices and estimate their production effects.
- Photovoltaic effect, cell types and module ratings explained clearly
- Fixed-tilt, single-axis tracking and bifacial array configurations compared
- Inverters, transformers and balance-of-system equipment matched to plant scale
- Shading losses identified through horizon, obstruction and row-spacing analysis
- Performance ratio separates irradiation, conversion losses and availability losses
- Rooftop and utility-scale layouts assessed for land, access and maintenance
Participants can assess wind turbine suitability using site, turbine and production characteristics.
- Turbine power curves relate wind speed to electrical output
- Hub height selection considers shear, turbulence and turbine transport constraints
- Wake losses estimated from turbine spacing and prevailing wind direction
- Capacity factor calculated from annual generation and rated capacity
- Wind farm components include turbines, collection systems and substations
- Noise, visual impact and aviation constraints considered during site screening
Participants can distinguish dispatchable renewable technologies and their development constraints.
- Hydropower output calculated from head, flow, efficiency and gravity
- Run-of-river, storage and pumped-storage schemes compared for flexibility
- Tidal range, tidal stream and wave technologies assessed by maturity
- Geothermal plants use dry steam, flash steam or binary cycles
- Reservoir uncertainty, drilling risk and induced seismicity evaluated systematically
- Civil works requirements drive cost, permitting and construction schedules
Participants can evaluate bioenergy pathways using feedstock, conversion and sustainability criteria.
- Feedstock categories include residues, energy crops, wastes and biogas
- Anaerobic digestion converts organic materials into methane-rich biogas
- Combustion, gasification and pyrolysis compared by output and feedstock
- Fuel properties include moisture, calorific value, ash and contaminants
- Lifecycle greenhouse-gas accounting tests biomass carbon and transport assumptions
- Waste hierarchy prevents energy recovery displacing higher-value material uses
Participants can identify renewable heat options for buildings and industrial processes.
- Heat pumps move heat using electricity and refrigeration cycles
- Coefficient of performance varies with source and delivery temperatures
- Solar thermal collectors supply domestic hot water and process heat
- Industrial electrification options include resistance heating, induction and electric boilers
- Heat demand profiles matched with temperature requirements and operating hours
- Thermal storage shifts heat production away from peak electricity periods
Participants can prepare preliminary annual generation estimates with explicit assumptions and losses.
- Annual energy yield calculated from resource, capacity and performance assumptions
- Loss diagrams separate availability, electrical, curtailment and degradation effects
- P50 and P90 estimates communicate production uncertainty to investors
- Degradation rates applied to photovoltaic modules and wind turbine output
- Monthly generation profiles compared with demand and tariff periods
- Sensitivity tables test resource, loss and availability assumptions
Participants can identify grid issues affecting renewable plant design, connection and operation.
- Frequency, voltage and reactive power maintain stable electricity system operation
- Interconnection studies examine fault levels, protection and voltage constraints
- Variable renewable output managed through forecasting, reserves and flexibility
- Curtailment occurs when network capacity or system balancing becomes constrained
- Grid codes specify ride-through, reactive capability and control requirements
- Distribution-level generation changes power flows and protection coordination
Participants can compare storage and demand-flexibility options for renewable integration.
- Battery energy storage sized by power rating, duration and duty cycle
- Lithium-ion battery degradation driven by cycling, temperature and state-of-charge
- Pumped hydro, compressed air and thermal storage compared by application
- Demand response shifts controllable loads using price or dispatch signals
- Storage revenue streams include arbitrage, capacity and ancillary services
- Round-trip efficiency and usable capacity determine delivered storage value
Participants can map the stages, decisions and evidence required for project development.
- Development sequence progresses through screening, feasibility, consent, construction and operation
- Site control secured through ownership, lease, easement or concession agreements
- Fatal-flaw screening tests resource, grid, land, permitting and community risks
- Feasibility studies define design basis, surveys, estimates and implementation schedule
- Project governance assigns decision rights, approvals and escalation routes
- Stage-gate reviews determine whether projects proceed, pause or stop
Participants can identify environmental and social requirements for early project planning.
- Environmental and social impact assessment identifies material project effects
- Baseline surveys cover biodiversity, water, cultural heritage and livelihoods
- Mitigation hierarchy applies avoidance, minimisation, restoration and offsetting
- Stakeholder mapping identifies affected groups, interests, influence and concerns
- Free, prior and informed consent considered for Indigenous Peoples
- Permitting registers track approvals, evidence, conditions and responsible parties
Participants can compare renewable options using cost, value and financial performance measures.
- Capital expenditure separates development, equipment, construction and connection costs
- Operating expenditure includes maintenance, insurance, land rent and administration
- Levelised cost of energy discounts lifecycle costs and electricity output
- Net present value and internal rate of return assess investment returns
- Discount rates reflect financing costs, risk perceptions and capital structure
- Sensitivity analysis tests energy yield, tariffs, costs and delays
Participants can distinguish the commercial structures used to sell or procure renewable electricity.
- Merchant revenue depends on market prices, capture rates and volume
- Power purchase agreements allocate price, volume, credit and curtailment risks
- Corporate procurement options include sleeved contracts, physical supply and certificates
- Feed-in tariffs, auctions and contracts-for-difference shape project revenues
- Behind-the-meter projects value avoided purchases, demand charges and resilience
- Guarantees of origin and renewable energy certificates support electricity claims
Participants can interpret renewable project financing structures and lender requirements.
- Project finance relies on contracted cash flows and limited recourse
- Equity, senior debt, mezzanine debt and grants compared by risk
- Debt service coverage ratio tests cash flow against debt obligations
- Lenders review resource studies, contracts, permits and technical due diligence
- Bankability depends on allocation of construction, operating and revenue risks
- Financial close conditions precede drawdown, notice-to-proceed and construction mobilisation
Participants can select procurement routes and identify key contract interfaces.
- EPC contracts allocate design, construction, schedule and performance responsibilities
- Multi-contract delivery separates equipment supply, civil works and installation packages
- Technical specifications define outputs, standards, testing and acceptance criteria
- Tender evaluation combines price, technical quality, delivery record and risk
- Performance guarantees address energy output, availability and liquidated damages
- Change-control procedures manage scope, cost, schedule and approval impacts
Participants can identify operational controls that protect renewable asset performance and value.
- Construction schedules sequence surveys, procurement, civil works and commissioning
- Commissioning verifies safety systems, controls, protection and performance tests
- SCADA systems collect operational data, alarms and equipment status
- Preventive maintenance plans use manufacturer intervals and condition indicators
- Availability, performance ratio and forced outage rate track asset performance
- Asset management plans cover warranties, spares, inspections and lifecycle budgets
Participants can prepare a structured risk assessment for a renewable energy project.
- Risk registers record causes, events, consequences, owners and controls
- Probability-impact matrices prioritise risks requiring active management attention
- Technical risks include resource uncertainty, equipment failure and grid constraints
- Commercial risks cover price exposure, counterparty credit and inflation
- Political risks include policy change, permitting delay and currency restrictions
- Decision logs document assumptions, evidence sources, approvals and unresolved issues
Participants can build, review and present a complete preliminary renewable energy project assessment pack.
- Define project objective, demand context, site boundary and decision criteria
- Select technology using resource, demand, grid and site evidence
- Calculate annual generation, capacity factor, losses and demand matching
- Develop preliminary LCOE, cash-flow assumptions and investment recommendation
- Prepare risk register, stakeholder map, permitting actions and delivery milestones
- Present assessment pack with assumptions, sensitivities and management decision request
Exercises and examples are adapted to each cohort's sectors and roles.