Course modules
22 modules over 10 daysParticipants can explain how renewable energy projects are structured, financed and assessed for bankability.
- Project-finance ring fencing, non-recourse debt, and special-purpose vehicle structures
- Revenue contracts mapped to solar, wind, storage, and hybrid assets
- Lifecycle stakeholders from sponsor through lenders, advisers, contractors, and offtaker
- Development milestones linked to bankability gates and financing decisions
- Risk allocation traced through project agreements and financing documents
- Term-sheet provisions compared with sponsor returns and lender protections
Participants can convert renewable energy technical inputs into financeable generation assumptions.
- Solar irradiation, wind yield, degradation, and availability assumptions tested
- P50, P90, and P99 energy cases linked to debt sizing
- Battery round-trip efficiency, augmentation, and dispatch constraints modelled
- Independent engineer reports translated into lender-case generation forecasts
- Grid curtailment and transmission loss assumptions incorporated into energy sales
- Technology warranties matched against performance guarantees and liquidated damages
Participants can assess how core project contracts affect cash flow certainty and lender risk.
- Power purchase agreement pricing structures compared: fixed, indexed, merchant
- Take-or-pay, availability, and volume risk allocated under offtake contracts
- EPC price, schedule, interface, and performance obligations assessed
- O&M agreements reviewed for availability guarantees, pass-throughs, and termination
- Direct agreements establish lender step-in rights and cure periods
- Change-in-law, force majeure, and termination payment clauses quantified
Participants can establish a transparent, auditable structure for a renewable project-finance model.
- Excel model structure separates inputs, calculations, outputs, and error checks
- Timeline conventions align construction, operations, debt service, and distributions
- Named ranges, colour conventions, and version controls support model auditability
- Sources-and-uses schedule reconciles development costs, contingencies, and financing fees
- Assumption register records source, owner, date, and approval status
- Balance checks identify circular references, sign errors, and hardcodes
Participants can model construction spending, funding drawdowns and completion-period financing needs.
- EPC drawdowns timed against milestones, retention, contingency, and VAT
- Construction interest during construction calculated from debt draw profiles
- Contingency draw rules distinguish cost overruns from schedule delays
- Working capital needs reflect receivables, payables, inventory, and reserves
- Commissioning dates trigger revenue commencement, debt service, and warranty periods
- Cost-to-complete tests identify funding gaps before financial close
Participants can forecast operating revenues, costs and reserve requirements from project assumptions.
- Generation forecast converts resource data into monthly net energy output
- Tariff escalation, indexation lags, and settlement timing drive revenue
- Operating costs separated into fixed, variable, lifecycle, and pass-through items
- Major maintenance reserves funded through operating cash flow waterfalls
- Land lease, royalties, and concession fees modelled under contract terms
- Receivables ageing captures payment delays, disputes, and collection assumptions
Participants can derive CFADS and model project cash movements through financing waterfalls.
- Income statement, balance sheet, and cash flow statements integrated
- Cash flow available for debt service derived from operating assumptions
- Cash waterfall prioritises taxes, operating costs, reserves, debt, distributions
- Debt service reserve account sizing follows financing agreement requirements
- Restricted cash movements reconciled between project accounts and balance sheet
- Distribution lock-up tests linked to covenant and reserve conditions
Participants can size and structure project debt against project cash flow and risk.
- Senior debt, subordinated debt, and shareholder loans modelled separately
- Debt sizing constrained by debt-to-equity ratios and coverage ratios
- Annuity, straight-line, and sculpted repayment profiles compared
- Sculpting aligns principal repayments with projected cash flow available
- Interest margins, fees, swaps, and commitment charges calculated
- Refinancing assumptions tested against remaining tenor and projected value
Participants can incorporate material tax, accounting and related-party effects into project returns.
- Tax depreciation schedules reflect local allowances and asset classes
- Loss carryforwards, withholding tax, and VAT timing incorporated
- Deferred tax movements reconciled with project financial statements
- IFRS 16 lease treatment considered for land and equipment
- Transfer pricing and related-party charges tested for bankability
- Tax sensitivities show impacts on distributions and equity returns
Participants can calculate, interpret and explain sponsor returns from renewable energy projects.
- Equity internal rate of return calculated from shareholder cash flows
- Project IRR distinguished from equity IRR and lender metrics
- Net present value uses sponsor hurdle rates and terminal assumptions
- Distribution waterfalls allocate returns among sponsors and preferred equity
- Exit valuation based on contracted cash flows and market multiples
- Return bridges explain value effects from revenue, costs, and gearing
Participants can review a base-case model and document findings for decision makers.
- Base-case model audit traces every headline output to assumptions
- Model review checklist tests formulas, units, signs, and timing
- Independent model audit findings classified by severity and remedy
- Input-output dashboards present generation, revenue, debt, and returns
- Version comparison identifies changed assumptions and material output movements
- Model documentation records logic, sources, limitations, and approvals
Participants can identify, quantify and mitigate project risks affecting financing viability.
- Risk register links development, construction, operating, and financial risks
- Probability-impact scoring prioritises risks requiring financial mitigation
- Risk owners, triggers, treatments, and residual exposures documented
- Political risk, currency convertibility, and expropriation exposures assessed
- Currency mismatch quantified between revenues, costs, debt, and distributions
- Hedging options compared using forwards, swaps, caps, and natural hedges
Participants can test financial resilience through structured sensitivities, scenarios and simulations.
- One-way sensitivities test tariff, yield, capex, opex, and interest rates
- Two-way data tables reveal combined resource and price downside
- Scenario cases define downside, base, upside, and break-even assumptions
- Break-even tariff identifies minimum price meeting lender coverage thresholds
- Monte Carlo simulation interprets correlated resource, price, and delay risks
- Tornado charts rank drivers of equity value and debt capacity
Participants can calculate lender ratios and assess covenant compliance under changing conditions.
- DSCR, LLCR, and PLCR calculated using financing agreement definitions
- Debt service coverage ratios tested against base and downside cases
- Loan life coverage ratio relates debt balance to discounted CFADS
- Financial covenants modelled with testing dates, cure rights, and defaults
- Cash sweep mechanisms accelerate repayment after covenant thresholds are exceeded
- Distribution tests connect reserve balances, ratios, and default conditions
Participants can assess due diligence findings and financial-close readiness from a lender perspective.
- Bankability review scopes technical, legal, tax, insurance, and environmental diligence
- Independent engineer deliverables tested against lender information requirements
- Legal due diligence confirms land rights, permits, consents, and enforceability
- Environmental and social action plans costed and scheduled
- Lender model audit process documents assumptions, checks, and qualifications
- Conditions precedent tracked through financial close readiness checklists
Participants can assess insurance arrangements and their effect on debt protection and recovery.
- Construction all-risk, delay-in-start-up, and operational covers compared
- Business interruption limits linked to debt service and fixed costs
- Deductibles, exclusions, and insured events tested against project exposures
- Insurance proceeds waterfall allocates claims between restoration and lenders
- Force majeure schedules distinguish insured events from contractual relief
- Claims cooperation clauses protect lender rights after material losses
Participants can incorporate environmental, social and climate-risk requirements into financing analysis.
- IFC Performance Standards mapped to renewable project development activities
- Equator Principles screening identifies applicable environmental and social requirements
- Stakeholder engagement plans address land access, livelihoods, and grievances
- Climate physical-risk assessment tests heat, flood, wind, and wildfire
- Biodiversity mitigation hierarchy informs design changes, budgets, and permits
- ESG covenants and reporting obligations incorporated into financing documents
Participants can evaluate carbon-market and environmental-attribute revenues within project financing cases.
- Carbon credit additionality assessed against baseline, investment, and barrier tests
- Article 6 authorisation risks distinguished from voluntary market claims
- Verified Carbon Standard methodologies considered for eligible project activities
- Carbon revenue modelled with issuance timing, buffers, fees, and prices
- Corresponding adjustments assessed for host-country authorised mitigation outcomes
- Green attributes allocated between renewable certificates, offtakers, and sponsors
Participants can compare financing options and plan a lender process or refinancing case.
- Competitive lender process compares pricing, tenor, covenants, and flex provisions
- Financing plan sequences development capital, construction debt, and permanent financing
- Green Loan Principles assessed against use-of-proceeds and reporting requirements
- Refinancing case compares call premiums, break costs, and revised debt capacity
- Bond financing contrasted with bank debt for operating assets
- Transaction timetable coordinates adviser mandates, diligence, approvals, and signing
Participants can translate financing terms into economic effects and informed negotiation positions.
- Term sheet translated into model inputs, conditions, and risk allocations
- Debt pricing compares margins, reference rates, floors, and fees
- Mandatory prepayment clauses tested under refinancing, insurance, and asset sale
- Intercreditor arrangements define payment priorities, standstill, and enforcement rights
- Sponsor support obligations sized for completion, cost overruns, and liquidity
- Negotiation positions supported by quantified effects on returns and bankability
Participants can prepare a concise, evidence-based project financing recommendation for approval.
- Investment memorandum frames project rationale, assumptions, risks, and recommendation
- Credit paper explains repayment sources, security package, and downside resilience
- Executive dashboards present debt capacity, returns, sensitivities, and key risks
- Decision gates identify approvals required before bid, close, and construction
- Recommendation wording distinguishes conditions, mitigants, and unresolved issues
- Q&A preparation traces likely challenge questions to model evidence
Participants can build, review and present a complete renewable energy project-finance model and financing recommendation.
- Integrated solar project model populated with contractual and technical assumptions
- Sources-and-uses, CFADS, debt schedule, and equity returns reconciled
- Downside case tests yield, delay, tariff, and interest shocks
- Bankability risks documented with mitigants, owners, and financing implications
- Credit recommendation supported by coverage ratios, sensitivities, and conditions
- Investment committee presentation defends financing structure, returns, and risk allocation
Exercises and examples are adapted to each cohort's sectors and roles.