18 modules over 10 daysParticipants can explain the value chain, outputs and decision points of a biogas project.
- Biogas value chains from feedstock collection to energy offtake
- Anaerobic digestion outputs: biogas, digestate, heat, electricity and biomethane
- Compare CHP, boiler, vehicle fuel and grid-injection business models
- Project development stages from opportunity screening through commissioning
- Stakeholder roles: feedstock suppliers, operators, utilities, regulators and financiers
- Revenue structures for energy sales, waste fees and environmental attributes
Participants can assess feedstock quality, availability and supply risks for a proposed plant.
- Feedstock inventory: tonnes, seasonality, dry matter, contaminants and collection radius
- Differentiate manure, food waste, sludge, crop residues and energy crops
- Sampling plans for total solids, volatile solids, COD and nutrients
- Biochemical methane potential tests: purpose, limits and interpretation
- Calculate annual feedstock availability using collection and rejection assumptions
- Supply agreements covering volume, quality, delivery schedules and gate fees
Participants can relate microbial pathways and chemistry to stable methane production.
- Hydrolysis, acidogenesis, acetogenesis and methanogenesis in anaerobic digestion
- Methanogenic archaea sensitivity to pH, temperature and toxic compounds
- Volatile fatty acids and alkalinity as stability indicators
- Ammonia inhibition mechanisms in nitrogen-rich feedstock mixtures
- Trace elements supporting methanogenic activity and process resilience
- C:N ratio, buffering capacity and co-digestion feedstock balancing
Participants can calculate preliminary substrate, gas and energy balances for a biogas system.
- Build mass balances from feedstock tonnes, solids and conversion assumptions
- Estimate methane production using volatile solids destruction and BMP results
- Calculate lower heating value from methane concentration measurements
- Energy balances for digester heating, parasitic loads and useful output
- Apply conversion efficiencies for CHP engines, boilers and upgrading systems
- Sensitivity analysis for yield, uptime, feedstock volume and methane content
Participants can select a suitable digester configuration and establish preliminary design parameters.
- Compare wet, dry, plug-flow, CSTR and batch digestion systems
- Select mesophilic or thermophilic operation from feedstock characteristics
- Hydraulic retention time and solids retention time design logic
- Organic loading rate limits for stable digester operation
- Size digester volume using daily substrate flow calculations
- Mixing systems, heating loops and recirculation design considerations
Participants can define reception, preparation and contamination-control requirements for selected feedstocks.
- Reception layouts for weighbridge, unloading, storage and odour containment
- Depackaging food waste using shredding, pulping and separation equipment
- Screening technologies for plastics, grit, stones and fibrous contaminants
- Maceration and slurry preparation for pumping and mixing performance
- Hygienisation requirements for animal by-products and pathogen control
- Odour control using enclosure, extraction and biofilter systems
Participants can specify treatment steps required to protect equipment and meet gas-use requirements.
- Typical biogas constituents: methane, carbon dioxide, hydrogen sulphide and moisture
- Hydrogen sulphide removal using iron salts, activated carbon and biological scrubbers
- Moisture removal through cooling, condensation, drying and drainage
- Siloxane control for landfill, wastewater and food-waste gas streams
- Gas sampling methods, analyser selection and calibration requirements
- Set gas-quality specifications for engines, boilers and upgrading plants
Participants can compare energy conversion routes and select an appropriate gas utilisation concept.
- CHP selection: spark-ignition engines, microturbines and dual-fuel systems
- Heat recovery design for digesters, buildings and industrial processes
- Membrane separation for carbon dioxide removal and methane recovery
- Pressure swing adsorption performance, limitations and operating requirements
- Water scrubbing and chemical scrubbing technology selection criteria
- EN 16723 requirements for biomethane grid injection and vehicle fuel
Participants can develop a digestate management approach that addresses nutrient value and compliance.
- Separate liquid and fibre fractions using presses, centrifuges and screw presses
- Nutrient analysis for nitrogen, phosphorus, potassium and organic matter
- Digestate storage sizing for seasonal land-application restrictions
- Nutrient management plans matching application rates to crop demand
- Compare composting, drying, pelletising and ammonia-stripping treatment options
- Control runoff, odour, pathogens and nutrient-loss pathways
Participants can establish monitoring routines and interpret data for stable plant performance.
- Daily operating dashboard for feed rate, gas flow and methane concentration
- Trend pH, alkalinity, VFA, ammonia and volatile solids destruction
- Mass-flow measurement for substrates, recirculation, digestate and biogas
- Set warning limits using baseline performance and operating envelopes
- Laboratory quality control for sampling, preservation and analytical repeatability
- SCADA alarms for gas pressure, temperature, foam and equipment faults
Participants can diagnose common operational problems and define corrective action sequences.
- Diagnose acidification from VFA accumulation, declining pH and gas loss
- Identify ammonia inhibition through TAN, free ammonia and temperature data
- Foaming causes: surfactants, rapid loading, mixing faults and filamentous organisms
- Respond to scum layers, sediment accumulation and blocked pipework
- Investigate low methane concentration using gas analysis and feed records
- Apply root-cause analysis using fault trees and five whys
Participants can identify major biogas hazards and prepare operational risk controls.
- Methane explosion hazards, hazardous zones and ignition-source control
- Hydrogen sulphide toxicity, exposure limits and personal monitoring
- Confined-space entry permits for digesters, tanks and gas holders
- HAZOP studies for process deviations, safeguards and action tracking
- Emergency response procedures for gas releases, fires and overpressure
- Lockout-tagout controls during maintenance of rotating and electrical equipment
Participants can identify environmental controls, permit conditions and emissions-reduction measures.
- Permit requirements for waste acceptance, emissions, discharge and digestate use
- Methane slip measurement from upgrading units, engines and storage systems
- Fugitive-emissions surveys using leak detection and repair methods
- Control ammonia emissions from digestate storage and land application
- Odour assessment using source inventories, dispersion inputs and complaint records
- ISO 14040 and ISO 14044 lifecycle assessment boundary setting
Participants can screen a project site and define the evidence needed for feasibility assessment.
- Site screening: access, utilities, setbacks, flood risk and land area
- Map feedstock origins, transport routes and competing disposal outlets
- Assess electricity connection capacity, gas network proximity and heat demand
- Preliminary geotechnical, drainage, groundwater and contamination investigations
- Develop project assumptions register with owners, evidence and review dates
- Stage-gate decisions from concept screening to bankable feasibility
Participants can prepare a technology procurement approach with measurable supplier requirements.
- Develop employer requirements for throughput, uptime, emissions and gas quality
- Compare EPC, EPCM, design-build-operate and packaged-equipment contracting models
- Performance guarantees for methane yield, availability and parasitic energy
- Vendor due diligence covering references, warranties, service capacity and exclusions
- Factory acceptance tests and site acceptance tests for critical equipment
- Spare-parts lists, maintenance contracts and long-term service agreements
Participants can build a preliminary financial case and test the assumptions driving project viability.
- CAPEX breakdown for civil works, digestion, gas treatment and connections
- OPEX assumptions for labour, chemicals, maintenance, power and digestate handling
- Revenue modelling for gate fees, electricity, heat, biomethane and certificates
- Calculate NPV, IRR, payback period and debt-service coverage ratio
- Scenario analysis for feedstock price, energy price and availability
- Allocate risks through feedstock, offtake, EPC and operations contracts
Participants can create an operations framework for reliable, controlled biogas plant performance.
- Operating procedures for receiving, feeding, sampling and digestate dispatch
- Preventive maintenance plans for pumps, mixers, engines and compressors
- Critical-spares strategy based on failure modes and replacement lead times
- Reliability metrics: availability, mean time between failures and downtime
- Shift handovers using operating logs, alarms and outstanding-work records
- Annual shutdown planning for inspection, cleaning and statutory testing
Participants can build, review and present a complete preliminary biogas project concept and implementation plan.
- Define feedstock blend, annual volumes, quality assumptions and supply strategy
- Calculate digester sizing, methane output and net useful energy
- Select treatment, utilisation and digestate-management technologies with justification
- Prepare preliminary CAPEX, OPEX, revenues, sensitivities and investment metrics
- Review permitting, HSE, emissions, operational and contractual risk controls
- Present project recommendation, assumptions register and next-stage development plan
Exercises and examples are adapted to each cohort's sectors and roles.