Course modules
20 modules over 10 daysParticipants can define a renewable energy project and establish its initial delivery controls.
- Solar and wind project lifecycles from origination through commissioning and handover
- Stage-gate decisions linking development evidence, approvals, financing, construction and operations
- Project charter contents: objectives, boundaries, assumptions, constraints and success criteria
- PMBOK process groups adapted for utility-scale renewable energy delivery
- Roles of developer, owner, EPC contractor, lender and independent engineer
- Early project artefacts: charter, stakeholder register, milestone plan and risk log
Participants can assess site and resource factors that shape project feasibility and delivery risk.
- Solar irradiance and wind resource data sources for preliminary energy assessment
- P50 and P90 energy estimates with exceedance probability interpretation
- GIS constraint mapping for land, access, terrain, setbacks and protected areas
- Site reconnaissance findings translated into development assumptions and action items
- Micro-siting effects on turbine yield, wake losses and construction access
- Solar layout constraints from shading, topography, drainage and equipment clearances
Participants can plan consent activities and track their dependencies within the project schedule.
- Land lease, easement and right-of-way requirements for generation and transmission assets
- Permit register structure covering environmental, planning, building and electrical approvals
- Critical-path analysis of consent durations, submission dates and appeal periods
- Permit conditions converted into design, construction and monitoring requirements
- Authority engagement plans with decision dates, evidence needs and accountabilities
- Consent change control following layout revisions, capacity changes or route amendments
Participants can create stakeholder engagement plans for projects with competing local interests.
- Stakeholder mapping using power-interest grids and influence assessment
- Landowner, community, regulator and grid operator expectations identified systematically
- Material concerns recorded through issue logs, commitments registers and response plans
- Community consultation schedules aligned with permitting milestones and design decisions
- Grievance mechanism design for receiving, investigating and closing stakeholder concerns
- Communication matrices defining message owners, channels, timing and approval routes
Participants can define project scope and build a work breakdown structure for delivery control.
- Scope statement defining facilities, capacity, interfaces, exclusions and acceptance criteria
- Work breakdown structures separating development, engineering, procurement, construction and commissioning
- Control accounts assigned to measurable work packages and accountable managers
- Basis of design requirements linked to scope verification and change control
- Interface registers covering civil, electrical, mechanical, grid and communications packages
- Requirements traceability matrices connecting stakeholder needs to design deliverables
Participants can produce an integrated schedule showing critical dependencies and delivery milestones.
- Precedence diagramming method for development, procurement, construction and energisation activities
- Critical path analysis identifying float, constraints and schedule-driving dependencies
- Level three schedules with engineering, procurement and construction work packages
- Resource calendars reflecting weather windows, access restrictions and seasonal constraints
- Milestone schedules linking lender conditions, grid dates and commercial operation
- Schedule updates using progress evidence, forecast dates and remaining durations
Participants can establish a cost baseline and forecast project cash requirements.
- Capital cost breakdowns for development, equipment, civil works and grid connection
- Bottom-up estimates using quantities, unit rates, quotations and contingency assumptions
- Cost baseline creation through time-phased work package budgets and commitments
- Thirteen-week cash forecasts built from payment terms, invoices and milestones
- Contingency management using quantified risks, drawdown rules and approval thresholds
- Foreign exchange and commodity exposure tracked within procurement cost forecasts
Participants can select procurement routes and manage key renewable project contract interfaces.
- EPC, multi-contract and construction management delivery models compared for risk allocation
- Procurement plans sequencing long-lead equipment, civil works and specialist services
- Bid evaluation matrices covering price, technical compliance, capacity and delivery certainty
- FIDIC contract principles for obligations, notices, variations and dispute avoidance
- Liquidated damages, performance guarantees and warranty terms for generation assets
- Contract administration logs for correspondence, instructions, claims and payment certificates
Participants can identify, analyse and treat delivery risks using a structured risk process.
- Risk breakdown structures covering development, technical, commercial and construction exposures
- Probability-impact matrices calibrated with agreed scoring definitions and escalation thresholds
- Risk register entries specifying causes, events, consequences, owners and actions
- Monte Carlo schedule analysis for weather, permitting and supply uncertainty
- Decision logs documenting options, recommendation, approval authority and implementation actions
- Early warning indicators for cost growth, schedule slippage and contractor underperformance
Participants can integrate safety, quality and environmental controls into project delivery plans.
- Construction health and safety plans addressing lifting, excavation, electrical and working-at-height hazards
- Permit-to-work systems controlling high-risk activities and energy isolation requirements
- Inspection and test plans defining hold points, witnesses and quality records
- Nonconformance reports managed through root-cause analysis and corrective action tracking
- Environmental management plans covering erosion, dust, waste, biodiversity and water controls
- Contractor audits testing documented procedures, field conditions and closeout evidence
Participants can manage the principal technical interfaces affecting solar PV project delivery.
- PV module selection criteria including degradation, bifaciality, warranties and certification
- Inverter, transformer and collector system interfaces managed through design responsibility matrices
- Single-axis tracker installation dependencies involving foundations, tolerances and control systems
- DC and AC cable routing coordinated with drainage, roads and equipment pads
- IEC 62446-1 documentation requirements for photovoltaic system verification and records
- Solar performance ratio assumptions tested against losses, availability and curtailment
Participants can manage major engineering and logistics interfaces for wind farm construction.
- IEC 61400 design considerations for turbines, loads, safety and power performance
- Turbine supply agreements coordinated with transport, storage, erection and acceptance milestones
- Foundation design interfaces involving geotechnical data, concrete curing and tower delivery
- Heavy-lift planning for crane selection, assembly areas and weather restrictions
- Wake modelling assumptions reflected in layout decisions and energy yield forecasts
- SCADA, communications and condition monitoring interfaces defined before turbine commissioning
Participants can plan grid interconnection work and manage its critical technical dependencies.
- Interconnection applications identifying capacity, location, technology and proposed commissioning dates
- Grid impact studies covering load flow, fault levels, stability and harmonic performance
- Connection agreements allocating responsibilities for substations, lines and protection systems
- Electrical balance-of-plant interfaces between plant collector systems and network facilities
- Grid code compliance evidence for active power, reactive power and fault ride-through
- Energisation plans coordinating utility permits, switching procedures and authorised personnel
Participants can coordinate site mobilisation, construction sequencing and progress control.
- Construction execution plans defining site logistics, temporary works and access controls
- Mobilisation checklists covering permits, welfare, security, equipment and contractor inductions
- Look-ahead planning linking weekly work fronts, constraints and responsible parties
- Daily progress reporting using installed quantities, labour hours and equipment utilisation
- Weather contingency plans for high winds, rainfall, heat and lightning restrictions
- Site coordination meetings resolving interfaces between civil, electrical and equipment contractors
Participants can control environmental and social commitments through construction and handover.
- Environmental and social action plans converted into assigned project control activities
- Biodiversity protection measures scheduled around breeding seasons and habitat restrictions
- Cultural heritage chance-find procedures integrated into excavation and earthworks controls
- Labour management plans addressing recruitment, accommodation, conduct and worker grievances
- Community benefit commitments tracked through owners, dates, evidence and completion status
- Incident reporting procedures covering environmental damage, community events and corrective actions
Participants can align delivery evidence with financing conditions and lender monitoring needs.
- Financial close conditions linked to permits, contracts, insurance and technical reports
- Independent engineer reviews assessing design maturity, budgets, schedules and energy estimates
- Drawdown packages containing progress certificates, invoices, reports and covenant evidence
- Debt service assumptions affected by availability, generation, curtailment and operating costs
- Lender technical adviser findings assigned through action registers and closure dates
- Material project changes assessed against financing documents and consent requirements
Participants can measure performance, forecast completion and control authorised project changes.
- Earned value management using planned value, earned value and actual cost
- Schedule performance index and cost performance index interpreted for corrective decisions
- Estimate at completion forecasts updated from productivity, commitments and risk exposure
- Change requests documenting scope, cost, schedule, risk and contract implications
- Change control boards reviewing evidence, authority limits and implementation priorities
- Monthly project reports combining milestones, costs, risks, issues and decisions
Participants can plan commissioning activities and prepare an asset for operational acceptance.
- Commissioning plans sequencing mechanical completion, pre-energisation checks and functional testing
- Punch-list management assigning defects, due dates, evidence and acceptance status
- Energisation readiness reviews confirming permits, protection settings and operating procedures
- Performance tests measuring generation, availability, power quality and contractual guarantees
- As-built drawings, manuals, spares and training records compiled for handover
- Operational readiness criteria covering staffing, monitoring, maintenance and emergency response
Participants can close renewable projects with auditable records and transferable delivery learning.
- Closeout plans covering final accounts, claims, warranties, records and outstanding defects
- Contract completion certificates issued against defined acceptance and documentation requirements
- Lessons learned workshops separating root causes, practices and future actions
- Benefits realisation measures linking project outputs to energy, revenue and reliability targets
- Post-project reviews comparing approved baselines with actual cost, schedule and performance
- Document retention schedules preserving permits, test records, contracts and asset data
Participants can build, review and present a complete delivery plan for a solar or wind project.
- Project charter and stage-gate plan consolidated into a decision-ready delivery pack
- Work breakdown structure, schedule and cost baseline checked for internal consistency
- Risk register, stakeholder plan and permit tracker reviewed against project assumptions
- Procurement strategy and contract controls matched to major package interfaces
- Commissioning readiness plan tested against grid, quality and operational acceptance requirements
- Executive presentation communicates delivery logic, risks, decisions and immediate actions
Exercises and examples are adapted to each cohort's sectors and roles.








