Course modules
18 modules over 10 daysParticipants can explain how project controls supports investment decisions across the oil and gas project lifecycle.
- Stage-gate decisions from concept selection through commissioning and handover
- FEL deliverables and estimate maturity at each approval gate
- Project controls interfaces with engineering, procurement, construction, and operations
- Control account responsibilities under an integrated project management plan
- Decision rights, reporting cadence, and assurance escalation routes
- Owner, EPC, EPCM, and contractor control responsibilities compared
Participants can create aligned scope, organisation, cost and work breakdown structures.
- Work breakdown structures aligned with facilities, systems, and deliverables
- Cost breakdown structures linked to estimating and accounting codes
- Organisation breakdown structures defining accountable control account managers
- Control accounts connecting scope, budget, schedule, and responsibility
- Coding dictionaries supporting consistent reporting across contractor packages
- Scope dictionaries defining inclusions, exclusions, interfaces, and acceptance criteria
Participants can assess estimate basis, maturity, allowances and uncertainty for capital projects.
- AACE estimate classes and expected definition maturity requirements
- Estimate basis documents recording quantities, rates, assumptions, and exclusions
- Factored, parametric, and detailed estimating methods compared
- Direct costs separated from indirect costs, allowances, and contingency
- Vendor quotations, benchmark data, and productivity norms assessed
- Escalation, currency, taxes, and location factors incorporated consistently
Participants can produce a time-phased cost baseline and project cash-flow forecast.
- Approved budget distributed across control accounts and reporting periods
- Time-phasing rules aligned with schedule activities and procurement milestones
- Commitment registers distinguishing purchase orders, contracts, and approved changes
- Actual cost collection from invoices, accruals, payroll, and ledger extracts
- Cash-flow curves built from payment terms and forecast expenditure
- Management reserve separated from control account contingency and budget
Participants can develop a logic-driven integrated schedule for an oil and gas project.
- Primavera P6 activity coding for areas, disciplines, and contract packages
- Precedence diagramming relationships between engineering, procurement, construction, and commissioning
- Milestone dictionaries defining measurable completion and acceptance conditions
- Critical path method calculations for early dates, late dates, and float
- Schedule calendars reflecting shifts, weather windows, and access restrictions
- Level-three schedules linked to control accounts and progress measurement
Participants can evaluate schedule quality, critical paths and near-critical work.
- DCMA 14-point checks applied to contractor schedule submissions
- Open ends, excessive lags, and hard constraints identified
- Critical and near-critical paths traced through key project interfaces
- Negative float analysed against contractual milestones and recovery obligations
- Schedule updates reviewed for logic changes and status-date discipline
- Look-ahead schedules translated into accountable weekly work priorities
Participants can design progress measurement rules for engineering, procurement and construction work.
- Weighted milestone rules for engineering document development and approval
- Procurement progress measured from requisition through delivery and inspection
- Installed quantities measured against issued-for-construction quantity baselines
- Rules of credit assigned to fabrication, erection, testing, and handover
- Physical percent complete distinguished from elapsed time and invoiced value
- Progress measurement procedures defining evidence, ownership, and verification
Participants can calculate and interpret earned value indicators for project performance control.
- ANSI/EIA-748 principles applied to control account performance measurement
- Planned value, earned value, and actual cost calculated
- Cost performance index and schedule performance index interpreted
- Budget at completion, estimate at completion, and variance at completion
- Performance measurement baselines reconciled with authorised scope changes
- Earned value limitations for procurement-heavy and lump-sum contracts
Participants can prepare evidence-based cost and schedule forecasts using current project data.
- Estimate-to-complete forecasts built from remaining quantities and productivity
- Independent estimate-at-completion compared with contractor forecast submissions
- Trend registers capturing emerging scope, quantity, and productivity exposure
- Forecast confidence assessed through data quality and assumption testing
- S-curves used to compare planned, actual, and forecast performance
- Management actions linked to forecast drivers and accountable owners
Participants can connect project risk analysis with cost and schedule contingency decisions.
- Risk breakdown structures aligned with technical, commercial, and execution threats
- Cause-event-effect statements written for measurable risk register entries
- Probability-impact scoring supported by defined assessment criteria
- Monte Carlo analysis estimating schedule confidence and contingency ranges
- Three-point estimates applied to uncertain durations and cost exposures
- Risk owners, response actions, triggers, and residual exposure recorded
Participants can administer change control from identification through approved baseline update.
- Change registers recording origin, scope, estimate, schedule, and approval
- Technical queries and design changes screened for control impacts
- Change impact assessments separating direct, indirect, and time-related costs
- Authorisation thresholds aligned with delegated authority and governance requirements
- Baseline change logs preserving original budgets, dates, and audit trails
- Unapproved changes reported separately from authorised project budget movement
Participants can control procurement package status, commitments and contractor performance evidence.
- Procurement plans linked with long-lead equipment and schedule requirements
- Bid packages, purchase orders, and contract commitments tracked
- Expediting status measured against vendor document and delivery milestones
- Contract payment schedules reconciled with physical progress and acceptance
- Lump-sum, reimbursable, and target-cost control implications compared
- Vendor data registers monitored for engineering and construction dependencies
Participants can analyse field productivity and convert performance evidence into forecast actions.
- Installed quantities, labour hours, and productivity factors reconciled
- Earned hours compared with actual hours and planned norms
- Crew loading curves assessed against access, permits, and workfront readiness
- Constraint logs capturing materials, drawings, equipment, and interface blockers
- Daily reports validated against quantity books and supervisor records
- Productivity recovery actions assigned against measurable field performance indicators
Participants can control completion, commissioning and handover readiness through measurable systems.
- System and subsystem breakdown structures supporting commissioning sequence planning
- Mechanical completion certificates linked to inspection and test records
- Punch-list status categorised by safety, operability, and handover impact
- Turnover packages tracked against documentation, testing, and acceptance requirements
- Commissioning milestones integrated with construction completion and energisation dates
- Operations readiness actions monitored alongside physical completion progress
Participants can assemble schedule and cost evidence for delay analysis and claims review.
- Contemporaneous records collected from schedules, reports, correspondence, and site logs
- Time impact analysis applied to prospective delay events
- Windows analysis comparing critical path movement across update periods
- Concurrent delay assessed against contract entitlement and causation evidence
- Extension-of-time submissions checked for logic, records, and mitigation
- Disruption costs distinguished from delay costs and scope growth
Participants can produce decision-ready reports with clear exceptions, forecasts and actions.
- Monthly project control reports structured around approved management decisions
- Variance narratives explaining drivers, impacts, actions, and residual exposure
- Dashboards presenting cost, schedule, risk, progress, and procurement indicators
- Data dates, reporting cut-offs, and reconciliation rules controlled
- Forecast challenge meetings testing assumptions with discipline leads
- Assurance reviews checking baseline integrity, traceability, and reporting consistency
Participants can formulate a recovery plan for deteriorating cost and schedule performance.
- Recovery triggers defined from cost, schedule, productivity, and risk thresholds
- Root-cause analysis separating symptoms from controllable performance drivers
- Schedule compression options assessed through crashing and fast tracking
- Resource reallocation tested against workfront readiness and productivity limits
- Recovery forecasts documented with assumptions, owners, dates, and costs
- Executive recovery reports presenting options, trade-offs, and approval decisions
Participants can build, review and present a complete project controls pack for an oil and gas capital project.
- Scope, WBS, CBS, and control accounts integrated into one control basis
- Time-phased budget and cash-flow forecast reconciled with schedule milestones
- Progress measurement rules applied across engineering, procurement, and construction
- Earned value results interpreted alongside trends, risks, and commitments
- Change impacts assessed against cost baseline and critical path
- Management report presented with forecast, exceptions, actions, and decisions
Exercises and examples are adapted to each cohort's sectors and roles.