Course modules
19 modules over 10 daysParticipants can map the financial structure, decision gates and value drivers of an energy project.
- Project lifecycle gates from concept selection through decommissioning funding
- CAPEX, OPEX and abandonment costs classified within project economics
- Value drivers linking production, availability, tariffs and operating costs
- Stage-gate decision criteria for concept select, sanction and operations
- Roles of sponsors, lenders, contractors, regulators and joint-venture partners
- Financial control cycle connecting estimate, budget, actuals, forecast and approval
Participants can translate technical scope into a structured and controllable cost baseline.
- Work breakdown structure aligned with engineering deliverables and construction packages
- Cost breakdown structure linking accounts, disciplines, assets and contract packages
- Control accounts assigned to accountable managers and measurable work packages
- Scope dictionaries defining inclusions, exclusions, interfaces and estimate assumptions
- Coding structures connecting schedules, procurement systems and general ledger accounts
- Change-control thresholds established for scope, quantities and technical specifications
Participants can select and document appropriate estimating methods for different project maturities.
- AACE estimate classes matched to project definition maturity and accuracy ranges
- Analogous estimates derived from normalised historical project cost data
- Factor estimating using capacity, complexity and installation multipliers
- Bottom-up quantities priced through labour, materials, equipment and subcontract rates
- Vendor quotations evaluated for exclusions, escalation, validity and commercial terms
- Basis of estimate records assumptions, methodology, allowances and exclusions
Participants can develop estimates that distinguish real costs, nominal costs and currency exposure.
- Base-date pricing separated from escalation and contingency allowances
- Real and nominal cash flows reconciled with consistent discount rates
- Commodity price indices selected for steel, fuel, labour and equipment
- Foreign exchange assumptions applied to imported equipment and offshore services
- Forward curves distinguished from inflation indices in economic models
- Sensitivity tables quantify cost exposure to currency and price movements
Participants can quantify uncertainty and set contingency using structured risk analysis.
- Risk register links causes, events, consequences, owners and responses
- Three-point estimates define minimum, most-likely and maximum cost outcomes
- Probability distributions selected for uncertain quantities, rates and durations
- Monte Carlo simulation generates P50, P80 and confidence-level cost forecasts
- Correlation assumptions prevent unrealistic aggregation of independent risk events
- Contingency drawdown tracked against realised risks and approved scope changes
Participants can convert approved estimates into time-phased budgets and funding requirements.
- Control budgets allocated across work packages, periods and responsible managers
- Resource-loaded schedules generate labour, equipment and procurement expenditure profiles
- S-curves compare planned expenditure, commitments, actuals and forecast completion
- Long-lead procurement schedules identify deposit, milestone and delivery payment dates
- Funding plans reconcile project cash needs with equity and debt drawdowns
- Annual budget submissions distinguish authorised funds from forecast expenditure
Participants can establish reliable actual-cost reporting from accounting and procurement records.
- Purchase orders and contracts captured as committed-cost exposure
- Invoice matching checks quantities, rates, milestones, retention and tax treatment
- Accruals estimate received work not yet invoiced at period close
- General ledger reconciliations identify miscoding, duplicates and timing differences
- Cost reports separate actuals, commitments, accruals and remaining forecast costs
- Data-quality checks test coding completeness, cut-off discipline and approval evidence
Participants can calculate and interpret earned value indicators for project performance control.
- ANSI/EIA-748 principles connect scope, schedule, budget and performance measurement
- Planned value derived from authorised budget and baseline schedule
- Earned value credited through weighted milestones, quantities and physical progress
- Actual cost reconciled from accounting records, accruals and approved adjustments
- CPI, SPI, CV and SV calculated for control-account performance
- Performance thresholds trigger management review, recovery actions and forecast updates
Participants can produce credible completion forecasts from current performance and remaining scope.
- Estimate at completion combines actuals, commitments and estimate-to-complete
- Independent EAC formulas tested against current cost performance index
- Remaining work forecast using updated quantities, productivity and market rates
- Schedule-delay effects translated into indirect cost and escalation exposure
- Management reserve distinguished from project contingency and unapproved scope
- Forecast narratives explain movements, corrective actions and decision requirements
Participants can assess contractor cost exposure, payment mechanisms and change-control evidence.
- Lump-sum, reimbursable and target-cost contracts allocate cost risk differently
- Payment terms assessed for milestones, retention, advance payments and incentives
- Variation orders priced through quantity changes, rates and time impacts
- Change logs record instruction dates, entitlement evidence and approval status
- Claims analysis separates disruption, prolongation, acceleration and defective-work costs
- Open-book audits test allowable costs against contract reimbursement provisions
Participants can analyse operating expenditure drivers and build operational cost forecasts.
- Fixed and variable OPEX separated for production and availability analysis
- Unit operating costs calculated per barrel, megawatt-hour or throughput unit
- Maintenance strategies compared using planned, corrective and shutdown cost profiles
- Production forecasts connect volumes, energy yields, tariffs and operating costs
- Benchmarking identifies cost gaps across assets, plants and operating teams
- Life-cycle cost analysis compares equipment alternatives beyond purchase price
Participants can build project cash flow forecasts covering construction, operations and closure.
- Monthly project cash flows sequence construction, commissioning and operating periods
- Revenue models incorporate production, losses, tariffs, availability and curtailment
- Working capital forecasts include receivables, inventory, payables and cash balances
- Debt-service schedules calculate interest, principal repayments and reserve accounts
- Tax timing reflects depreciation, loss carryforwards and deductible expenditure
- Decommissioning cash flows incorporated using timing, inflation and funding assumptions
Participants can evaluate project value using standard capital-investment appraisal methods.
- Net present value calculated from discounted after-tax project cash flows
- Internal rate of return interpreted alongside reinvestment and scale limitations
- Payback period assessed against liquidity constraints and capital recovery targets
- Discount rates reflect project risk, capital structure and currency assumptions
- Levelised cost of energy compares lifetime costs against lifetime generation
- Profitability index ranks constrained capital opportunities using present-value ratios
Participants can assess how financing terms affect project viability and investor returns.
- Corporate finance and project finance structures allocate risk differently
- Debt sizing uses debt-service coverage ratio and projected cash flows
- Loan covenants assessed for reserve accounts, distributions and reporting obligations
- Equity returns calculated after debt service, taxes and partner distributions
- Power purchase agreements evaluated for tenor, indexation and counterparty risk
- Lender due diligence tests technical, market, legal and financial assumptions
Participants can incorporate fiscal terms and partner interests into project financial analysis.
- Tax depreciation schedules model capital allowances and taxable income timing
- Royalty structures apply volume-based, value-based and profit-based fiscal mechanisms
- Production-sharing terms allocate cost recovery, profit production and government take
- Joint operating agreements define cash calls, billings and partner voting rights
- Non-operated venture statements reconciled with budgets, commitments and expenditure approvals
- Effective tax rates tested under price, cost and production sensitivities
Participants can identify reporting implications of energy-project costs and long-term obligations.
- IFRS 6 exploration expenditure assessed for capitalisation and impairment indicators
- IAS 16 component accounting distinguishes major inspections and replacement costs
- IAS 36 impairment testing compares carrying value with recoverable amount
- IAS 37 provisions estimate decommissioning, restoration and environmental obligations
- Asset retirement obligations discounted and accreted through project life
- Management reporting reconciles project metrics with statutory financial statements
Participants can test investment resilience and communicate financially material uncertainties.
- One-way sensitivity analysis ranks variables by value and cash impact
- Two-way data tables test combined commodity price and capital cost changes
- Scenario analysis compares base, downside, upside and stress-case assumptions
- Tornado charts communicate material drivers to investment committee members
- Break-even analysis identifies minimum price, volume or availability requirements
- Decision trees value staged commitments under technical and market uncertainty
Participants can design cost-control reporting that supports timely management intervention.
- Delegated authorities define approval limits for budgets, changes and commitments
- Monthly cost reports present baseline, actuals, forecast, variance and actions
- Variance analysis distinguishes price, quantity, productivity, timing and scope drivers
- Forecast assurance reviews challenge assumptions, evidence and estimate completeness
- Investment committee packs connect performance trends with approval decisions
- Dashboard metrics balance financial status, schedule progress, risks and opportunities
Participants can build, review and present a complete energy-project cost-control and investment recommendation.
- Project scope translated into cost breakdown structure and basis of estimate
- Time-phased budget reconciled with procurement commitments and funding requirements
- Earned value results incorporated into estimate-at-completion forecast
- Cash flow model calculates NPV, IRR and debt-service coverage
- Risk simulation and sensitivity analysis support contingency and investment decisions
- Management pack presents findings, actions, approvals and decision recommendation
Exercises and examples are adapted to each cohort's sectors and roles.