Course modules
16 modules over 10 daysParticipants can explain how Lean principles change project planning, control and improvement decisions.
- Lean value, flow, pull, perfection and respect applied to projects
- Project delivery viewed as a customer-value flow system
- Differences between Lean projects, traditional projects and operational Lean
- The eight wastes translated into project delivery failure modes
- Customer value statements, critical requirements and acceptance criteria
- Leading indicators distinguish flow health from retrospective status reporting
Participants can define customer value and translate it into measurable project outcomes.
- Voice of customer converted into measurable project value requirements
- CTQ trees connect stakeholder needs with deliverable acceptance measures
- Problem statements separate symptoms, causes, impacts and desired conditions
- Benefits maps link outputs, outcomes, owners and measurement methods
- Scope boundaries prevent value dilution through uncontrolled requirements
- Success criteria establish quality, timing, cost and service expectations
Participants can map current-state project flow and identify delay, waste and hand-off risks.
- Current-state value stream maps show work, information and approval flows
- Process time, waiting time and lead time quantified consistently
- Swimlanes expose ownership gaps between project functions and suppliers
- Queue analysis identifies accumulation points and delayed decision stages
- Handover quality assessed through inputs, outputs and acceptance conditions
- Future-state maps define target flow, controls and improvement priorities
Participants can identify project waste and investigate its underlying causes systematically.
- TIMWOODS categories identify waste in project information and work
- Five Whys tests causal assumptions behind repeated delivery failures
- Fishbone diagrams organise causes across people, process, technology and policy
- Pareto analysis prioritises frequent defects and high-impact delays
- Failure demand distinguishes necessary rework from avoidable corrective activity
- Root-cause evidence separates facts, assumptions, correlations and opinions
Participants can create project plans that account for flow, dependencies and constraints.
- Work breakdown structures aligned with customer value and deliverable flow
- Dependency mapping distinguishes finish-to-start links from information needs
- Milestone planning establishes observable conditions for release and acceptance
- Batch size decisions reduce waiting, rework and coordination burden
- Takt thinking balances planned demand with team delivery capacity
- Constraint logs assign owners, due dates and escalation thresholds
Participants can design a Kanban system that controls project work flow.
- Kanban boards visualise committed, active, blocked and completed work
- Explicit pull policies define entry criteria and replenishment decisions
- Work-in-progress limits protect capacity and expose overloaded stages
- Classes of service distinguish standard, fixed-date, expedite and intangible work
- Blocked-work rules trigger escalation before delay becomes schedule variance
- Service delivery reviews assess flow performance and policy effectiveness
Participants can select project work using transparent value, risk and capacity criteria.
- Cost of Delay compares value loss from deferred project decisions
- Weighted Shortest Job First ranks work by economics and duration
- MoSCoW prioritisation clarifies minimum viable scope and trade-offs
- Decision rules protect critical commitments from unplanned work requests
- Capacity allocation balances delivery, improvement, support and contingency work
- Backlog refinement tests readiness before work enters active delivery
Participants can establish visual controls that support rapid project decisions.
- Visual management boards display commitments, flow, risks and ownership
- Daily huddles review blocked work, priorities and immediate countermeasures
- Obeya rooms connect strategic objectives with project execution evidence
- Andon signals make abnormal conditions visible to decision makers
- Escalation paths specify response times, authority levels and documentation
- Standard meeting agendas reduce reporting duplication and unresolved actions
Participants can build quality controls into project workflow rather than rely on final inspection.
- Definition of Done sets verifiable completion and acceptance conditions
- Poka-yoke controls prevent predictable errors in project hand-offs
- Check sheets capture defect patterns during reviews and approvals
- First-pass yield measures accepted deliverables without corrective rework
- Quality at the source assigns verification to work originators
- Control plans define checks, owners, frequencies and corrective actions
Participants can improve schedule reliability by managing commitments, buffers and constrained resources.
- Last Planner System principles improve promise reliability among delivery teams
- Look-ahead planning removes constraints before scheduled work begins
- Percent Plan Complete measures reliability of weekly work commitments
- Critical Chain buffers protect delivery against resource and dependency variation
- Resource levelling reduces multitasking and competing priority conflicts
- Weekly work plans match available capacity with ready project tasks
Participants can connect Lean flow controls with proportionate project risk management.
- Risk registers distinguish threats, opportunities, assumptions and constraints
- Probability-impact matrices prioritise treatment actions and contingency ownership
- Pre-mortems identify credible failure pathways before execution begins
- Trigger conditions convert risk monitoring into timely management action
- Assumption logs test uncertain planning premises at defined review points
- Flow metrics reveal emerging risks before milestone slippage occurs
Participants can manage project interfaces using clear agreements, feedback and escalation mechanisms.
- Stakeholder maps assess influence, interest, expectations and engagement needs
- RACI matrices clarify decisions, accountability, consultation and information duties
- Supplier hand-off agreements define quality, timing and evidence requirements
- Feedback loops capture user learning before expensive commitments harden
- Interface registers track dependencies between teams, vendors and regulators
- Escalation protocols resolve cross-functional conflicts within agreed response windows
Participants can create governance reports that support intervention rather than passive status review.
- Tiered governance aligns operational decisions with sponsor-level intervention
- A3 reports present problem, analysis, countermeasures and follow-up evidence
- Cumulative flow diagrams reveal queue growth and workflow instability
- Burn-up charts compare completed scope against approved delivery targets
- RAG status criteria anchored to evidence, thresholds and decisions
- Benefits reviews verify whether delivered outputs produce intended outcomes
Participants can run structured improvement cycles to improve project delivery performance.
- PDCA cycles test countermeasures through planned, measurable learning
- Kaizen events focus teams on bounded, high-value delivery problems
- Standard work documents repeatable planning, review and hand-off practices
- Retrospectives convert delivery experience into specific process improvements
- Before-and-after measures verify improvement rather than perceived progress
- Improvement backlogs sequence actions by impact, effort and ownership
Participants can combine Lean controls with established project management and Agile practices.
- PMBOK performance domains connected with Lean flow management controls
- Agile iterations supported by Kanban policies and work-in-progress limits
- Stage-gate governance adapted for evidence-based learning and feedback
- Hybrid delivery models combine predictive milestones with pull-based execution
- Change control evaluates value, flow impact, risk and capacity
- Method selection considers uncertainty, compliance, dependencies and stakeholder needs
Participants can build, review and present a complete Lean project delivery pack for a defined project.
- Project charter defines value, scope, stakeholders, measures and governance
- Current-state value stream map identifies waste, queues and constraints
- Future-state workflow specifies pull policies, limits and hand-off controls
- A3 proposal presents root causes, countermeasures, owners and follow-up
- Visual management design sets boards, metrics, cadences and escalation rules
- Implementation roadmap sequences pilots, reviews, training and adoption measures
Exercises and examples are adapted to each cohort's sectors and roles.