Course modules
20 modules over 10 daysParticipants can explain Lean principles and frame a Lean programme around customer value, flow and measurable business needs.
- Lean purpose, customer value and operational waste in manufacturing systems
- Toyota Production System pillars: just-in-time and jidoka principles
- Eight wastes identified through production, material and information flow
- Value, value stream, flow, pull and perfection operating principles
- Policy deployment links site objectives, improvement activity and daily work
- Lean implementation failure modes: isolated tools, weak leadership and poor follow-through
Participants can establish a fact-based baseline for selecting Lean improvement priorities.
- Baseline measures for safety, quality, delivery, cost and morale
- Operational definitions prevent inconsistent reporting of losses and performance
- Gemba observation records actual conditions, work methods and barriers
- Time observation separates cycle time, waiting time and changeover time
- Pareto analysis ranks defects, downtime categories and delay causes
- Data collection plans specify source, owner, frequency and validation checks
Participants can create current-state value stream maps and identify flow constraints across a product family.
- Product family selection using routing similarity and customer demand patterns
- Current-state mapping captures process boxes, inventory, flows and information
- Calculate total lead time, processing time and value-added ratio
- Record cycle time, uptime, changeover time and available capacity
- Material flow analysis identifies queues, transport loops and batch accumulation
- Information flow mapping traces schedules, triggers, releases and feedback
- Constraint identification focuses improvement effort on system throughput limitations
Participants can calculate demand-driven production requirements and assess line capacity against takt.
- Takt time calculated from net available time and customer demand
- Cycle-time comparison exposes stations unable to meet customer pace
- Work-content charts distinguish manual, machine and walking elements
- Yamazumi charts visualise workload imbalance across operators and stations
- Line balancing reallocates work while protecting quality and safety
- Capacity calculations account for uptime, yield, staffing and changeovers
- Pitch defines the management interval for paced production control
Participants can design a future-state value stream using flow, pull and controlled production points.
- Future-state mapping applies takt, flow, pull and pacemaker decisions
- Pacemaker process selection controls production scheduling for the value stream
- Continuous-flow assessment considers product, process, quality and equipment constraints
- Supermarkets regulate replenishment where continuous flow remains impractical
- FIFO lanes control sequence and inventory between linked processes
- Heijunka concepts level volume and mix to reduce production instability
- Kaizen bursts convert future-state gaps into scoped improvement actions
Participants can establish workplace controls that make normal conditions, abnormalities and priorities visible.
- 5S audit criteria define workplace organisation and sustainment expectations
- Sort removes unnecessary tools, materials, documents and obsolete stock
- Set-in-order uses point-of-use storage, labelling and location control
- Shine inspections reveal deterioration, leaks, defects and safety hazards
- Standardise visual conditions using photographs, colour coding and boundary lines
- Visual management boards display targets, status, abnormalities and escalation actions
- Layered process audits verify adherence to workplace and process standards
Participants can document and improve standard work for safe, repeatable and capable production.
- Standard work combines takt time, work sequence and standard inventory
- Work combination tables show manual, walking and machine-time relationships
- Standardised work charts define operator movement, locations and process sequence
- Job instruction breakdowns specify major steps, key points and reasons
- Work instructions incorporate quality checks, safety controls and escalation triggers
- Process confirmation checks whether work follows agreed operating conditions
- Revision control maintains ownership and currency of production standards
Participants can design basic pull replenishment systems with explicit inventory and replenishment rules.
- Push and pull systems compared through trigger, inventory and scheduling logic
- Kanban cards define part number, quantity, source, destination and signal
- Container sizing balances handling frequency, space and replenishment responsiveness
- Kanban quantity calculations use demand, replenishment time and safety factors
- Supermarket rules govern withdrawal, replenishment and stockout escalation
- FIFO discipline prevents hidden queues and uncontrolled production sequencing
- Pull-system audits test card accuracy, container integrity and adherence
Participants can analyse changeovers and develop SMED actions that reduce setup time and variation.
- SMED separates internal setup tasks from external preparation tasks
- Changeover observation records sequence, duration, motion and waiting losses
- Convert internal activities to external preparation wherever technically feasible
- Quick-release devices reduce fastening, adjustment and tool-change time
- First-piece approval methods reduce quality delays after changeovers
- Setup standardisation defines roles, tools, settings and verification steps
- Changeover performance tracking measures duration, variation and recurring delays
Participants can use equipment-loss data to prioritise maintenance and operator care actions.
- OEE measures availability, performance and quality losses at equipment level
- Six big losses classify breakdowns, setups, stops, speed and defects
- Autonomous maintenance assigns cleaning, inspection and minor care routines
- Planned maintenance schedules tasks from equipment condition and failure history
- Failure mode analysis identifies critical equipment risks and controls
- Downtime coding supports accurate loss classification and Pareto prioritisation
- Maintenance-production coordination protects planned work windows and output commitments
Participants can design quality-at-source controls that prevent, detect and contain defects.
- Jidoka stops processes when defined abnormal conditions occur
- Poka-yoke devices prevent errors or detect them immediately
- Source inspection verifies error conditions before defects are created
- In-process checks define frequency, acceptance criteria and reaction plans
- Andon signals communicate abnormalities and summon timely technical support
- Defect containment separates suspect material, disposition and traceability records
- Control plans connect critical characteristics, checks, owners and reactions
Participants can lead evidence-based problem solving from problem definition through verified corrective action.
- A3 thinking structures problem solving on one evidence-based page
- Problem statements quantify the gap, location, timing and business impact
- Five Whys traces causal chains beyond immediate symptoms
- Fishbone diagrams organise potential causes across process categories
- Cause verification uses data, observation and controlled testing
- Countermeasures address verified causes, owners, dates and expected effects
- Follow-up plans confirm results and standardise effective changes
Participants can establish daily routines that control performance, escalate abnormalities and maintain improvement gains.
- SQDCP boards track safety, quality, delivery, cost and people measures
- Tiered meetings escalate unresolved issues through defined management levels
- Daily accountability boards assign actions, owners, due dates and status
- Plan-versus-actual tracking reveals output gaps within the shift
- Escalation triggers distinguish local recovery from management intervention needs
- Leader standard work defines routine checks, coaching and follow-up actions
- Visual escalation confirms issue closure and verifies countermeasure effectiveness
Participants can select Lean projects that address material business needs and can be implemented responsibly.
- Project selection aligns improvement opportunities with policy deployment objectives
- Impact-effort matrices compare benefits, complexity, risk and resource demand
- Project charters define problem, scope, targets, team and governance
- Benefit calculations distinguish hard savings, cost avoidance and capacity release
- Dependency mapping identifies sequencing constraints between improvement initiatives
- Risk registers address safety, quality, delivery and implementation exposure
- Obeya boards coordinate priorities, decisions, milestones and cross-functional actions
Participants can plan stakeholder engagement and capability building for sustained Lean adoption.
- Stakeholder analysis identifies influence, impact, concerns and engagement actions
- Change narratives connect Lean changes to customer and employee outcomes
- Sponsor roles provide visible decisions, resources and barrier removal
- Supervisor coaching converts improvement expectations into daily leadership behaviours
- Training needs analysis identifies role-specific knowledge, skills and practice
- Resistance analysis distinguishes valid operational concerns from uncertainty and loss
- Communication plans specify messages, channels, timing and feedback routes
Participants can plan a controlled Lean pilot with clear scope, measures, responsibilities and review points.
- Pilot selection balances business relevance, manageable scope and learning value
- Implementation plans sequence preparation, trial, review, adjustment and standardisation
- RACI matrices clarify accountability for actions, decisions and approvals
- Readiness reviews confirm materials, staffing, training, equipment and data
- Pilot scorecards track leading indicators and outcome measures daily
- PDCA cycles test countermeasures before wider process deployment
- Go-no-go criteria govern pilot continuation, adaptation or withdrawal decisions
Participants can build sustainment controls that protect gains and support continuous improvement.
- Control plans define measures, frequencies, limits, owners and reactions
- Audit schedules verify standard work, 5S and pull-system discipline
- Process ownership assigns accountability beyond the improvement project team
- Leader standard work reinforces routine observation, coaching and issue escalation
- Skills matrices identify qualification gaps and cross-training priorities
- Recognition mechanisms reinforce problem reporting, adherence and improvement contributions
- Hansei reviews capture lessons, unresolved risks and next improvement priorities
Participants can incorporate safety and ergonomic controls into Lean process design and improvement decisions.
- Risk assessments identify hazards created by flow, layout and work changes
- Ergonomic screening reviews reach, force, posture, repetition and lifting
- Standard work embeds safe methods, protective equipment and stop conditions
- Near-miss analysis identifies weak controls before injury or damage occurs
- Cell layouts separate pedestrian routes, vehicle movement and hazardous operations
- Safety kaizen addresses workplace risks through worker-led practical improvements
- Change-control reviews approve process modifications before implementation
Participants can use Lean leadership routines to develop problem-solving capability and maintain management discipline.
- Gemba walks use observation, questions and evidence rather than assumptions
- Coaching kata develops target conditions through iterative improvement cycles
- Improvement kata frames direction, current condition, target and experiments
- Leader behaviours support psychological safety for reporting abnormalities early
- Hoshin catchball aligns objectives through structured dialogue and negotiation
- Decision logs record assumptions, approvals, risks and unresolved issues
- Management review cadences connect frontline learning with strategic priorities
Participants can build, review and present a complete Lean implementation plan for a selected production area.
- Current-state evidence defines the production problem, scope and baseline
- Future-state map specifies flow, pull, capacity and quality controls
- Prioritised kaizen portfolio links countermeasures to quantified performance gaps
- Pilot charter assigns milestones, roles, risks, measures and decision gates
- Change plan addresses stakeholders, communications, training and supervisor coaching
- Sustainment controls define audits, leader routines and escalation mechanisms
- Executive presentation defends business case, sequencing and expected benefits
Exercises and examples are adapted to each cohort's sectors and roles.








