Course modules
16 modules over 10 daysParticipants can establish a clear project mandate linked to business benefits and delivery authority.
- Project mandate, business case and benefits assumptions tested for viability
- Distinguishing outputs, outcomes, benefits and operational handover accountabilities
- SMART success criteria translated into measurable acceptance conditions
- Assumption, dependency and constraint log established with owners
- Project charter authority, tolerances and sponsor decisions defined
- Benefits map links deliverables to measurable organisational change
Participants can define project scope and control requirements without creating ambiguity or uncontrolled work.
- Scope statement separates included work, exclusions and project boundaries
- Requirements elicitation uses interviews, workshops, observation and document analysis
- MoSCoW prioritisation distinguishes essential requirements from desirable enhancements
- Acceptance criteria specify evidence required for deliverable approval
- Requirements traceability matrix connects needs, deliverables, tests and acceptance
- Scope creep indicators identified before unapproved work consumes resources
Participants can decompose approved scope into manageable deliverables, work packages and accountable owners.
- Work breakdown structure decomposes scope into deliverables and work packages
- Product breakdown identifies tangible outputs before activity planning begins
- Work package definitions specify owner, effort, criteria and dependencies
- RACI matrix clarifies responsibility, accountability, consultation and information flows
- Control accounts connect work packages with reporting and budget responsibility
- Rolling-wave planning manages detail levels across near-term and later work
Participants can create defensible estimates using assumptions, historical evidence and appropriate estimating techniques.
- Analogous estimating uses comparable projects and adjusted delivery assumptions
- Three-point estimates calculate expected duration from optimistic and pessimistic ranges
- Bottom-up estimates aggregate work package effort, duration and direct costs
- Estimating basis records sources, exclusions, contingencies and confidence levels
- Resource calendars expose availability constraints affecting schedule feasibility
- Contingency reserves distinguish identified risk allowances from management reserves
Participants can produce a logical, resource-aware schedule that identifies the work driving completion.
- Precedence diagramming maps finish-to-start, start-to-start and finish-to-finish relationships
- Activity sequencing tests dependencies, leads, lags and external commitments
- Critical path method identifies activities determining the planned completion date
- Float analysis distinguishes schedule flexibility from critical delivery exposure
- Milestone schedules communicate decision points, approvals and key deliverables
- Schedule compression compares crashing costs with fast-tracking risk consequences
Participants can assign people, facilities and specialist inputs while managing capacity constraints.
- Resource breakdown structure categorises labour, equipment, materials and specialist services
- Capacity planning compares demand profiles with named resource availability
- Resource levelling resolves over-allocation within fixed capacity constraints
- Resource smoothing protects milestone dates while reducing workload volatility
- Responsibility assignments align work package ownership with decision authority
- Team mobilisation plan covers onboarding, roles, access and working agreements
Participants can establish approved cost and schedule baselines for disciplined performance control.
- Time-phased budget aligns planned expenditure with scheduled work packages
- Cost baseline separates authorised budgets from contingency and management reserves
- Funding profile identifies cash requirements, approval gates and release conditions
- Baseline approval records authorised scope, schedule, budget and assumptions
- Control thresholds trigger investigation before tolerances are exceeded
- Forecasting methods distinguish committed costs, actuals and estimated completion costs
Participants can assess delivery uncertainty and implement proportionate actions for risks, issues and dependencies.
- Risk register captures cause, event, effect, owner and response
- Probability-impact matrix prioritises threats and opportunities for management attention
- Response strategies include avoid, mitigate, transfer, accept and exploit
- Issue log records current problems, decisions, actions and escalation dates
- Dependency mapping identifies predecessor commitments and external delivery interfaces
- Risk appetite and tolerance guide escalation and contingency decisions
Participants can plan quality assurance, quality control and formal acceptance for project deliverables.
- Quality management plan defines standards, reviews, tests and approval evidence
- Quality assurance examines process compliance before deliverables reach acceptance
- Quality control verifies outputs against specifications and acceptance criteria
- Inspection and test plans assign checkpoints, methods, records and approvers
- Defect management records severity, correction ownership and retest outcomes
- Acceptance records confirm customer approval, conditions and outstanding obligations
Participants can design practical governance that supports timely oversight, decisions and escalation.
- Governance structure defines sponsor, steering group, project manager and workstream roles
- Terms of reference set meeting purpose, authority, membership and cadence
- Stage-gate reviews assess readiness against agreed evidence and decision criteria
- Delegated authorities specify approval limits for scope, cost and schedule
- Project assurance provides independent checks on controls, evidence and delivery confidence
- Escalation routes distinguish operational resolution from sponsor-level intervention
Participants can engage stakeholders with targeted communication, consultation and decision-making arrangements.
- Stakeholder mapping assesses influence, interest, impact and engagement needs
- Power-interest grids determine communication intensity and engagement priorities
- Communication plan specifies audience, purpose, channel, frequency and owner
- Sponsor briefings focus on decisions, tolerances, risks and benefit progress
- Difficult stakeholder conversations use interests, evidence and agreed next actions
- Meeting disciplines record decisions, actions, owners and due dates
Participants can manage project supplier interfaces from requirement definition through delivery assurance.
- Make-or-buy analysis compares capability, cost, control and delivery risk
- Statement of work defines scope, deliverables, service levels and acceptance
- Supplier evaluation criteria weight technical capability, price, risk and capacity
- Contract milestones connect payment events with verified deliverable acceptance
- Supplier performance reviews assess progress, defects, risks and corrective actions
- Interface register coordinates responsibilities between project, supplier and operations teams
Participants can report project performance clearly using meaningful indicators, forecasts and exceptions.
- Status reports distinguish completed work, current commitments and forecast outcomes
- Milestone trend analysis reveals repeated movement in key delivery dates
- Earned value management compares planned value, earned value and actual cost
- Schedule performance index indicates efficiency of planned work completion
- Cost performance index signals variance between value achieved and expenditure
- Exception reports present variance causes, options, decisions and recovery actions
Participants can assess, approve and implement changes while protecting delivery commitments and benefits.
- Change requests document rationale, urgency, scope and requested decision
- Impact assessment examines schedule, cost, risk, quality and benefit effects
- Change control board reviews material changes against approved tolerances
- Configuration management maintains current versions, approvals and product records
- Recovery plans combine root-cause analysis, replanning and accountable corrective actions
- Decision logs preserve rationale for accepted, rejected and deferred changes
Participants can prepare projects for operational adoption, formal closure and benefits follow-through.
- Transition plan assigns operational readiness, training, support and ownership actions
- Operational readiness assessments test people, processes, systems and support arrangements
- Cutover planning coordinates timing, rollback criteria, communications and command structures
- Handover packs include asset records, procedures, warranties and support contacts
- Lessons learned reviews capture evidence, causes, recommendations and accountable follow-up
- Closure reports confirm acceptance, final costs, residual risks and benefit ownership
Participants can build, review and present a complete project delivery pack with justified delivery decisions.
- Project mandate aligns benefits, scope, success criteria and governance authority
- Integrated plan combines work breakdown, schedule, resources and cost baseline
- Risk, issue and dependency registers support prioritised management action
- Stakeholder communications address sponsor decisions, supplier interfaces and operational readiness
- Performance report presents milestones, earned value, forecasts and exceptions
- Change and recovery recommendations defend proposed actions using impact evidence
Exercises and examples are adapted to each cohort's sectors and roles.