Course modules
20 modules over 10 daysParticipants can explain Kaizen as a daily management and structured improvement system.
- Kaizen principles: customer value, respect for people, incremental improvement
- Continuous improvement roles from frontline teams to executive sponsors
- Kaizen, Lean, Six Sigma and quality management compared
- Improvement types: daily Kaizen, focused Kaizen and breakthrough change
- Process performance framed through quality, delivery, cost and safety
- Conditions that cause improvement work to fail after implementation
Participants can define a process in terms of customers, demand and value delivered.
- SIPOC diagrams defining suppliers, inputs, process steps, outputs and customers
- Voice of Customer translated into critical-to-quality process requirements
- Demand patterns distinguished between customer demand, failure demand and internal demand
- Process boundaries set using trigger events and customer completion points
- Service-level requirements linked to measurable process performance measures
- Stakeholder analysis identifying customers, operators, owners and improvement sponsors
Participants can observe work at the Gemba and identify evidence of process waste.
- Gemba walks structured around work, flow, abnormalities and customer value
- Eight wastes identified through DOWNTIME observation categories
- Observation sheets capture waiting, queues, movement, rework and interruptions
- Separate symptoms, assumptions and verified facts during process observation
- Work sampling estimates time spent on value-adding and non-value-adding activity
- Safety, ergonomics and employee burden considered during waste identification
Participants can establish a reliable baseline for a Kaizen improvement opportunity.
- Operational definitions prevent inconsistent counting of defects, delays and completions
- Baseline data plans specify measures, sources, frequency and ownership
- Run charts reveal variation, trends, shifts and recurring performance patterns
- Pareto charts focus attention on highest-frequency defects or delay causes
- First-pass yield, cycle time and lead time calculated correctly
- Data integrity checks identify missing records, inconsistent categories and duplicate counts
Participants can create a current-state value stream map from observed process data.
- Value stream mapping symbols represent material, information and process flows
- Current-state maps show cycle time, waiting time, inventory and defects
- Takt time calculated from available working time and customer demand
- Information flows traced from customer request through scheduling and release
- Process boxes distinguish touch time from elapsed lead time
- Bottlenecks located using capacity, queue length and utilisation evidence
Participants can select a high-value improvement problem and frame it in an A3.
- Impact-effort matrices compare improvement opportunities using transparent criteria
- Problem statements quantify the gap without proposing premature solutions
- A3 sections connect background, current condition, target and analysis
- SMART targets specify performance level, deadline and measurement method
- Scope boundaries prevent projects expanding beyond controllable process conditions
- Sponsor agreements clarify expected benefits, authority and resource commitments
Participants can use PDCA to test, evaluate and standardise improvement countermeasures.
- Plan-Do-Check-Act cycles structure small, evidence-based process changes
- Hypotheses state expected effects before countermeasure testing begins
- Test plans define trial scope, measures, duration and decision rules
- Check phases compare actual results against baseline and target
- Act decisions standardise, adapt, abandon or retest countermeasures
- PDCA records preserve learning from unsuccessful improvement tests
Participants can identify and validate root causes before selecting countermeasures.
- Fishbone diagrams organise potential causes across people, methods and equipment
- 5 Whys analysis follows causal chains to controllable process conditions
- Cause-and-effect matrices rank suspected causes against critical performance requirements
- Stratification separates defect patterns by product, shift, location or channel
- Scatter plots test relationships between potential drivers and outcomes
- Cause validation distinguishes correlation, coincidence and demonstrated mechanism
Participants can document standard work that supports safety, quality and predictable output.
- Standard work combines sequence, timing, quality points and expected inventory
- Work instructions use clear steps, visual cues and acceptance criteria
- Job breakdown sheets identify major steps, key points and reasons
- Standard work charts show operator movement, machine time and handoffs
- Workload balance charts compare task content against takt time
- Revision controls keep standards current after approved process changes
Participants can design 5S conditions and visual controls for stable daily work.
- Sort criteria remove obsolete tools, materials, files and information
- Set-in-order methods assign locations, quantities, labels and retrieval rules
- Shine inspections expose equipment deterioration, contamination and unsafe conditions
- Standardise routines define ownership, frequency and acceptable workplace conditions
- Sustain audits use simple scoring, escalation and corrective action records
- Visual controls display status, abnormalities, priorities and standard conditions
Participants can prevent defects through source inspection and error-proofing design.
- Quality at source stops defects before downstream processing begins
- Poka-yoke methods prevent, detect or signal predictable human errors
- Mistake-proofing selects contact, fixed-value and motion-step control methods
- Defect containment protects customers while root-cause work proceeds
- Control plans define checks, response actions, owners and escalation thresholds
- Check sheets capture defect types consistently at the point of occurrence
Participants can improve flow by matching work release, capacity and demand.
- Little's Law links work-in-progress, throughput and lead time
- One-piece flow compared with batch processing using process constraints
- Pull systems release work according to downstream consumption signals
- Kanban cards define replenishment triggers, quantities and work-in-progress limits
- Heijunka levels volume and mix to reduce unevenness
- Line balancing redistributes work content around takt-time requirements
Participants can analyse changeovers and reduce setup time using SMED principles.
- SMED separates internal setup tasks from external preparation activities
- Changeover observation records task sequence, duration, delays and motion
- Externalisation moves preparation work before equipment or service interruption
- Parallel work assigns independent setup tasks to appropriate team members
- Quick-release fixtures, presets and checklists reduce adjustment time
- Changeover standards define sequence, roles, safety checks and target duration
Participants can identify reliability losses and define operator-led maintenance actions.
- Overall equipment effectiveness combines availability, performance and quality losses
- Six big losses classify stoppages, speed loss, defects and startup waste
- Autonomous maintenance assigns routine cleaning, inspection and lubrication tasks
- Planned maintenance schedules protect critical assets before failure occurs
- Abnormality tags trigger repair, analysis and closure of equipment conditions
- Reliability measures distinguish mean time between failures and repair time
Participants can adapt Kaizen methods to transactional, digital and customer-facing work.
- Service blueprints map customer actions, frontstage work and support processes
- Queue analysis identifies delay caused by arrivals, capacity and prioritisation
- Failure demand tracks avoidable contacts created by incomplete first responses
- Digital workflow mapping exposes rekeying, approvals and exception loops
- Case triage rules match work complexity to capability and response targets
- Standard response templates reduce variation without removing professional judgement
Participants can plan and facilitate a focused Kaizen event with clear controls.
- Kaizen charters define business case, scope, targets and team membership
- Event agendas sequence observation, analysis, design, testing and review
- RACI matrices assign decision rights, actions and consultation responsibilities
- Facilitation techniques surface frontline knowledge and manage conflicting perspectives
- Implementation risk registers identify dependencies, disruption and mitigation actions
- Daily report-outs communicate findings, decisions, blockers and next steps
Participants can prepare stakeholders to adopt and maintain changed working methods.
- Stakeholder mapping assesses influence, impact, concerns and engagement needs
- Change messages explain process purpose, expected behaviours and practical benefits
- Training plans specify audience, content, timing and competence confirmation
- Resistance analysis distinguishes valid operational concerns from incomplete information
- Leader standard work reinforces observation, coaching and timely escalation
- Recognition practices reinforce reported abnormalities and improvement contributions
Participants can establish performance controls that maintain Kaizen gains after implementation.
- Tiered daily management links frontline measures to leadership review routines
- Visual performance boards show targets, actuals, trends and abnormalities
- Daily huddles review safety, quality, delivery, cost and actions
- Escalation rules define response timing, authority and issue ownership
- Process confirmation audits verify adherence to critical standard work
- Control charts distinguish common-cause variation from special-cause signals
Participants can quantify benefits and manage improvement work as a prioritised portfolio.
- Benefits registers separate realised savings, avoided cost and capacity released
- Financial assumptions document volumes, rates, timing and benefit owners
- Leading indicators track adoption before final business results appear
- Project dashboards show progress, risks, decisions and benefit status
- Prioritisation criteria balance customer impact, feasibility, urgency and strategic fit
- Improvement portfolios prevent duplicated projects and competing process changes
Participants can build, review and present a complete Kaizen improvement project pack for a defined process problem.
- A3 project pack integrates problem statement, baseline, analysis and target
- Current-state map confirms process boundaries, demand, delays and waste
- Root-cause evidence supports selected countermeasures and test priorities
- Future-state design specifies flow, standards, controls and ownership
- Implementation roadmap sequences actions, dependencies, risks and review milestones
- Peer review tests logic, measurability, feasibility and sustainment arrangements
- Sponsor presentation communicates benefits, decisions required and follow-up measures
Exercises and examples are adapted to each cohort's sectors and roles.








