Course modules
16 modules over 10 daysParticipants can distinguish engineering project delivery responsibilities, governance roles and lifecycle decision points.
- Engineering projects distinguished from operations, maintenance and routine technical work
- Project lifecycle gates from concept selection through commissioning and handover
- Sponsor, project manager and technical authority accountabilities defined clearly
- Governance structures for capital, infrastructure and industrial engineering projects
- Stage-gate decisions supported by technical, commercial and delivery evidence
- Project success criteria balancing safety, performance, cost, schedule and quality
Participants can define a justified project mandate with clear objectives, constraints and approval requirements.
- Project charters linking business need, engineering objectives and expected benefits
- SMART objectives translated into measurable technical and operational outcomes
- Assumptions, constraints and dependencies recorded within the initiation document
- Option appraisal using cost, risk, operability and constructability criteria
- Preliminary business cases separating capital expenditure from operating expenditure
- Approval routes, delegated authorities and project tolerances established early
Participants can convert stakeholder needs into controlled engineering requirements and scope boundaries.
- Requirements traceability matrices connecting needs, specifications, tests and acceptance
- User requirements separated from design solutions and supplier proposals
- Scope statements defining inclusions, exclusions, boundaries and deliverable conditions
- Acceptance criteria specified for design, fabrication, installation and commissioning
- Interface requirements identified between disciplines, systems, sites and suppliers
- Scope creep indicators recognised before unapproved work consumes contingency
Participants can create a deliverable-based work breakdown structure with clear ownership.
- Deliverable-based work breakdown structures decomposed to controllable work packages
- Work package definitions covering outputs, ownership, duration and acceptance criteria
- Responsibility assignment matrices using RACI roles for technical deliverables
- Control accounts connecting scope, budget, schedule and accountable managers
- Engineering disciplines coordinated through defined package and interface ownership
- Work authorisation boundaries established between client, contractor and supplier teams
Participants can develop a logic-linked engineering schedule and identify its critical path.
- Activity networks built from work packages, dependencies and engineering deliverables
- Finish-to-start, start-to-start and lag relationships selected appropriately
- Critical Path Method calculations identifying float, critical activities and constraints
- Design, procurement, fabrication and construction sequences linked logically
- Milestones defined for approvals, long-lead equipment and commissioning readiness
- Schedule assumptions documented for productivity, access, permits and weather conditions
Participants can assess resource demand, capacity constraints and practical schedule options.
- Resource loading applied to engineering hours, crews, equipment and specialist services
- Capacity plans compared against internal availability and contractor mobilisation dates
- Resource levelling evaluated against schedule float, cost and delivery risk
- Skill constraints identified for design reviews, testing and commissioning activities
- Make-or-buy decisions assessed using capacity, capability and commercial criteria
- Resource histograms used to explain peak demand and staffing gaps
Participants can prepare an engineering project cost baseline with transparent estimating assumptions.
- Class estimates matched to project maturity, scope definition and uncertainty
- Bottom-up estimates built from quantities, labour rates, materials and equipment
- Contingency allowances separated from management reserve and scope allowances
- Cost breakdown structures aligned with work packages and control accounts
- Time-phased budgets converted into monthly expenditure and cash-flow forecasts
- Estimate basis documents recording exclusions, escalation and market assumptions
Participants can assess project uncertainty and assign proportionate response actions.
- Risk registers capturing causes, events, consequences, owners and response actions
- Probability-impact scoring calibrated for engineering safety, cost and schedule exposure
- Bow-tie analysis applied to high-consequence technical and construction risks
- Opportunities assessed alongside threats using value, feasibility and ownership criteria
- Risk responses selected through avoid, reduce, transfer, accept and exploit strategies
- Contingency drawdown linked to approved risk events and governance thresholds
Participants can establish quality controls that protect technical requirements and acceptance standards.
- Quality management plans connecting specifications, inspections, tests and records
- Inspection and test plans defining hold points, witness points and acceptance evidence
- Design reviews structured around requirements, hazards, operability and maintainability
- Non-conformance reports managed through containment, disposition and corrective action
- Root cause analysis using five whys and fishbone diagrams
- Configuration baselines protected through controlled drawings, specifications and revisions
Participants can plan procurement packages and manage contractor delivery against project controls.
- Procurement strategies selected for design responsibility, market capacity and risk allocation
- Bid packages defining scope, deliverables, schedules, standards and reporting requirements
- Technical bid evaluations separated from commercial assessment and clarification management
- Long-lead equipment tracked from requisition through manufacture, inspection and delivery
- Contractor progress assessed against approved schedules, quantities and quality records
- Supplier expediting plans focused on critical equipment, documents and manufacturing milestones
Participants can manage technical interfaces and communicate project decisions to affected stakeholders.
- Interface registers documenting boundaries, deliverables, dependencies and responsible parties
- Interface control documents governing physical, functional and data connections
- Stakeholder mapping using power, interest, influence and impact assessments
- Communication plans matched to decision rights, information needs and reporting frequency
- Technical decisions presented with options, impacts, recommendations and approvals required
- Community, regulator and operations concerns incorporated into project engagement plans
Participants can measure engineering project performance and forecast likely cost and schedule outcomes.
- Progress measurement rules defined for design, procurement, construction and commissioning
- Earned value measures calculated using planned value, earned value and actual cost
- Schedule performance index and cost performance index interpreted cautiously
- Estimate at completion forecast using current performance and remaining work assumptions
- Milestone trend analysis used to identify emerging schedule movement
- Weekly dashboards combining safety, quality, schedule, cost, risk and decisions
Participants can evaluate, approve and implement technical changes without losing baseline control.
- Change requests documenting technical rationale, alternatives, impacts and recommended action
- Impact analysis covering scope, cost, schedule, risk, quality and operability
- Change control boards applying authority limits and recorded approval decisions
- Configuration status accounting tracking approved versions, deviations and outstanding changes
- Baseline updates authorised only after approved scope and funding decisions
- Emergency changes controlled through retrospective review, evidence and corrective actions
Participants can run effective project reviews and prepare recovery plans for delivery variance.
- Project status reports distinguishing facts, forecasts, decisions and unresolved issues
- Look-ahead planning focused on near-term constraints, commitments and critical interfaces
- Variance analysis tracing schedule and cost movement to underlying causes
- Recovery schedules tested for resource feasibility, risk transfer and quality consequences
- Decision logs maintained with owner, due date, rationale and closure evidence
- Steering committee packs structured around exceptions, options and approval requests
Participants can plan controlled project handover, commissioning evidence and closeout activities.
- Commissioning plans linking systems completion, testing, training and operational readiness
- Punch lists prioritised by safety, functionality, documentation and handover impact
- As-built records verified against installed equipment, drawings and configuration status
- Operations handover packs including manuals, spares, warranties and maintenance requirements
- Lessons learned captured through structured reviews of decisions and outcomes
- Benefits handover assigned to operational owners after project closure
Participants can build, review and present a complete engineering project management plan for approval.
- Project charter, scope baseline and requirements traceability assembled into one plan
- Work breakdown structure, schedule and responsibility matrix checked for alignment
- Cost baseline, cash forecast and earned value rules incorporated
- Risk, quality, procurement, interface and change controls integrated coherently
- Management review tests assumptions, constraints, decisions and recovery readiness
- Formal presentation communicates project strategy, forecasts, risks and approval needs
Exercises and examples are adapted to each cohort's sectors and roles.