Course modules
17 modules over 10 daysParticipants can explain how construction risk, contractual responsibility and insurance protection interact.
- Construction risk categories: property, liability, delay, design and environmental loss
- Risk transfer, risk retention, avoidance and mitigation within project controls
- Insurable interest and indemnity principles applied to construction assets
- Stakeholder responsibilities for owners, contractors, consultants, lenders and suppliers
- Project lifecycle exposures from site possession through defects completion
- Insurance programme structure: project policies, annual policies and owner-controlled arrangements
Participants can build a prioritised construction risk register that supports insurance decisions.
- ISO 31000 risk process applied to construction project planning
- Risk breakdown structures for civil, building, industrial and energy works
- Bow-tie analysis linking causes, preventive controls and recovery controls
- Probability-impact scoring calibrated against project cost and schedule exposure
- Risk owners assigned using accountable, responsible, consulted and informed roles
- Residual-risk decisions documented after insurance and control measures
Participants can define an insurance programme suited to a project's risk profile and procurement route.
- Project information required before approaching insurers and brokers
- Policy limits derived from values, probable loss and contractual requirements
- Deductibles selected against retained-risk appetite and cash-flow capacity
- Named insureds, additional insureds and joint insured arrangements
- Insurance periods covering mobilisation, construction, testing and maintenance
- Layered programmes for high-value works and specialist exposures
Participants can evaluate CAR and EAR cover against physical damage exposures.
- CAR and EAR insuring clauses for contract works damage
- Material damage values, escalation allowances and temporary works declarations
- Testing, commissioning and hot-testing cover for installed equipment
- Defects exclusions, resulting damage and maintenance period extensions
- Existing property, surrounding property and non-negligent damage provisions
- Flood, storm, theft and fire controls affecting insurer acceptance
Participants can select liability cover and identify common gaps in third-party protection.
- Public liability cover for bodily injury and property damage
- Employer's liability and workers' compensation obligations for site personnel
- Cross liability clauses where multiple insured parties face claims
- Products and completed operations exposure after project handover
- Care, custody and control exclusions affecting hired equipment
- Contractual liability assumptions and indemnity wording within subcontracts
Participants can assess design liability exposures and appropriate professional indemnity arrangements.
- Professional indemnity triggers: negligence, errors, omissions and civil liability
- Claims-made policy operation, retroactive dates and extended reporting periods
- Design responsibility under design-build and contractor-designed portions
- Fitness-for-purpose obligations compared with reasonable skill and care
- Collateral warranties, reliance letters and duty-of-care exposures
- Consultant appointment limits aligned with project risk allocation
Participants can analyse delay exposures and determine when DSU cover is appropriate.
- Delay in start-up cover following insured physical damage
- Gross profit, fixed costs and debt-service calculations for DSU
- Critical path analysis supporting delay-loss measurement and mitigation
- Indemnity periods matched to commissioning and revenue ramp-up assumptions
- Contingent business interruption from supplier and utility failures
- Delay exclusions for defects, non-damage delays and contractual penalties
Participants can identify specialist insurance needs arising from project methods and location.
- Contractors' plant insurance for owned, hired and leased equipment
- Marine cargo cover for imported machinery and project materials
- Environmental impairment liability for pollution and remediation claims
- Cyber insurance exposure in building management and connected equipment
- Political violence and terrorism cover for higher-risk project locations
- Surety bonds, performance guarantees and insurance distinctions
Participants can review contractual insurance clauses for clear and workable risk allocation.
- JCT insurance options and responsibilities for contract works
- NEC4 ECC insurance clauses, risks and required policies
- FIDIC Red Book insurance provisions and contractor obligations
- Waivers of subrogation and their effect on recovery rights
- Indemnity clauses tested against available insurance protection
- Evidence of insurance, certificates and renewal monitoring requirements
Participants can control insurance obligations and exposures within the project supply chain.
- Flow-down insurance requirements within subcontract and purchase order terms
- Subcontractor policy verification using certificates, schedules and endorsements
- Additional insured status and primary non-contributory wording
- Vendor-held materials, off-site storage and transit risk allocation
- Insolvency exposures affecting unfinished works and warranty obligations
- Supplier quality failures linked to product liability and recall
Participants can review policy wording systematically and record material coverage gaps.
- Insuring agreements read before definitions, conditions and exclusions
- Definitions of occurrence, damage, insured and construction operations
- Exclusions tested against project risks recorded in registers
- Endorsements compared with base wording and broker summaries
- Schedule accuracy checked for values, locations, periods and limits
- Coverage gap register assigned to insurers, contracts or controls
Participants can prepare a clear insurance submission and evaluate insurer responses.
- Broker instruction letter defining placement objectives and decision authority
- Underwriting submission data: scope, values, methods, controls and loss history
- Insurer surveys, risk engineering reports and recommendation closure
- Quotation comparison using limits, exclusions, deductibles and conditions
- Premium allocation among owner, contractor and subcontractor parties
- Binding instructions, policy issuance and document verification controls
Participants can establish site controls that reduce loss frequency and support policy compliance.
- Insurer risk-improvement recommendations converted into accountable action plans
- Fire prevention controls: hot works permits, storage and impairment procedures
- Flood preparedness using site drainage, monitoring and emergency response
- Security plans for theft, vandalism and unauthorised site access
- Plant inspection regimes, lifting plans and equipment maintenance records
- Housekeeping audits linked to contractor supervision and incident trends
Participants can initiate and manage a construction insurance claim from incident to settlement.
- Immediate response priorities: safety, loss mitigation, notification and preservation
- Policy notification conditions, time limits and escalation routes
- Claims file structure for photographs, records, invoices and correspondence
- Loss adjuster roles, site access and investigation protocols
- Quantum evidence for repair costs, delay losses and third-party claims
- Reservation of rights letters and disputed coverage responses
Participants can pursue recoveries, manage disputes and convert losses into improved controls.
- Subrogation rights against negligent parties after insurer payment
- Recovery actions coordinated with contract notices and legal advisers
- Mediation, adjudication, arbitration and litigation in insurance-related disputes
- Concurrent claims under project policies and contractor indemnities
- Claims trend analysis using cause, cost, duration and control failure
- Post-loss reviews updating risk registers, procedures and insurance requirements
Participants can establish governance routines for monitoring insurance compliance throughout delivery.
- Insurance compliance matrix covering parties, policies, limits and expiry dates
- Monthly project reviews of incidents, changes and emerging exposures
- Change-control triggers for revised values, scope and construction methods
- Management reporting using key risk indicators and claims status
- Audit trails for certificates, endorsements, premiums and approvals
- Handover checks for maintenance cover, warranties and completed operations
Participants can build, review and present a complete project insurance and risk-management pack.
- Project risk register prioritised using ISO 31000 assessment criteria
- Insurance requirements schedule matching exposures, limits and responsible parties
- Contract clause review identifying allocation conflicts and uninsured risks
- Coverage gap register with treatment actions, owners and due dates
- Claims response plan covering notification, evidence and stakeholder communications
- Formal presentation defending recommendations to project leadership and insurers
Exercises and examples are adapted to each cohort's sectors and roles.