18 modules over 10 daysParticipants can explain how PPP risk management supports value for money, bankability and public accountability.
- PPP risk lifecycle from project identification through handback and asset transfer
- Value-for-money drivers linked to risk pricing, allocation and performance
- Public authority, sponsor, lender and contractor risk perspectives compared
- Risk appetite statements for procuring authorities and project companies
- Three lines model applied to PPP risk governance arrangements
- ISO 31000 principles adapted for long-term infrastructure concessions
Participants can map how PPP structure choices create different risk exposures and incentives.
- Concession, availability-payment and hybrid PPP structures compared systematically
- Revenue sources, tariff rules and subsidy mechanisms mapped
- Special purpose vehicle roles within contractual and financing interfaces
- Project agreements linked through an integrated contract map
- Lifecycle responsibilities across design, build, finance, operate and transfer
- Risk consequences of brownfield, greenfield and rehabilitation projects
Participants can identify material PPP risks using a structured and traceable approach.
- Risk breakdown structure covering political, commercial, technical and financial categories
- PESTLE analysis identifying external drivers of project uncertainty
- Assumption analysis distinguishing fixed inputs from uncertain project conditions
- Stakeholder mapping exposes interface risks between public and private parties
- Lessons-learned reviews draw risks from comparable infrastructure projects
- Risk statements written with cause, event and consequence format
Participants can create a usable PPP risk register with clear ownership and escalation fields.
- Risk register fields for owner, cause, trigger, response and status
- Probability-impact matrix calibrated using defined scoring criteria
- Inherent and residual risk ratings recorded separately
- Velocity and persistence indicators distinguish urgent from enduring exposures
- Risk interdependency mapping identifies correlated construction and financing events
- Escalation thresholds linked to governance forums and approval authorities
Participants can recommend risk allocation based on control, capability, incentives and cost.
- Control principle assigns risks to parties able to manage causes
- Least-cost principle tests pricing against public-sector retention costs
- Incentive compatibility prevents moral hazard in contract allocation
- Insurability analysis separates transferable exposures from retained losses
- Information asymmetry assessed before allocating latent site-condition risks
- Risk allocation matrix records proposed owner, rationale and fallback position
Participants can assess and allocate construction risks affecting cost, schedule and service commencement.
- Site investigations reduce geotechnical, contamination and utility-interface uncertainty
- EPC contract provisions allocate design, completion and defect liabilities
- Critical path analysis identifies schedule risks before financial close
- Delay liquidated damages tested against revenue loss and debt-service exposure
- Interface management plans assign responsibilities across multiple contractors
- Independent engineer roles support milestone certification and dispute prevention
Participants can analyse demand uncertainty and select suitable revenue or availability-payment mechanisms.
- Traffic and demand forecasts tested using reference-class forecasting
- Demand risk allocation compared under concession and availability-payment models
- Availability payment deductions linked to measurable service failures
- Tariff adjustment formulas address inflation, exchange rates and affordability
- Minimum revenue guarantees evaluated for incentive and fiscal effects
- Revenue-sharing mechanisms structure upside returns between public and private parties
Participants can set risk controls for service performance, maintenance and handback obligations.
- Output specifications define availability, quality and user-service requirements
- Key performance indicators linked to deductions and corrective action
- Lifecycle maintenance plans align asset condition with financial projections
- Handback reserve requirements protect asset quality near contract expiry
- Performance monitoring protocols establish evidence, measurement and dispute processes
- Operator replacement provisions address persistent service-performance failure
Participants can identify public-sector actions that affect PPP economics and contractual rights.
- Political risk categories include expropriation, discrimination and licence withdrawal
- Change-in-law clauses distinguish general from discriminatory legal changes
- Regulatory risk mapping covers permits, tariffs, standards and approvals
- Stabilisation provisions assessed against legitimate public-policy flexibility
- Government support agreements define obligations beyond the project agreement
- Dispute-resolution ladders progress from negotiation to arbitration procedures
Participants can evaluate financing and macroeconomic risks that threaten PPP affordability and bankability.
- Debt service coverage ratio tested under downside operating scenarios
- Interest-rate risk managed through fixed-rate debt and hedging instruments
- Foreign-exchange exposure allocated through tariffs, indexation or public support
- Inflation assumptions reconciled between operating costs and payment formulas
- Refinancing provisions allocate gains and protect public-sector interests
- Financial model sensitivities identify covenant pressure and funding shortfalls
Participants can incorporate environmental, social and climate risks into PPP allocation and management plans.
- Environmental and social impact assessments identify material project commitments
- IFC Performance Standards inform risk allocation and monitoring obligations
- Resettlement and land-acquisition risks assigned using control and legal authority
- Climate hazard screening considers flood, heat, drought and storm exposure
- Climate adaptation measures tested against lifecycle cost and performance requirements
- Community grievance mechanisms provide early warning of social conflict
Participants can prioritise PPP risks using qualitative and quantitative assessment methods.
- Expected monetary value calculates probability-weighted financial exposure
- Sensitivity analysis tests individual variables against project financial outcomes
- Scenario analysis combines adverse events into plausible downside cases
- Monte Carlo simulation concepts explain distributions of cost and revenue outcomes
- Tornado charts rank variables by influence on project viability
- Risk heat maps combined with financial materiality guide management attention
Participants can identify, quantify and report public fiscal risks arising from PPP commitments.
- Direct liabilities distinguished from contingent liabilities and implicit obligations
- PFRAM logic structures fiscal commitments across the contract lifecycle
- Government guarantees assessed for trigger probability and maximum exposure
- Termination payment formulas tested under default and force-majeure scenarios
- Budgetary ceilings and approval gates control aggregate PPP exposure
- Fiscal risk statements present assumptions, sensitivities and monitoring actions
Participants can select insurance and credit-support instruments for residual PPP risks.
- Insurance programme mapping covers construction, operational and liability exposures
- Deductibles, exclusions and waiting periods assessed against retained risk
- Performance bonds and parent guarantees tested for enforceability
- Political risk insurance compared with contractual government undertakings
- Partial risk guarantees analysed for lender confidence and pricing
- Claims-management protocols preserve evidence and notification rights
Participants can anticipate lender risk concerns and assess their effect on PPP terms.
- Lender due diligence reviews technical, legal, insurance and market reports
- Bankability assessment tests predictable cash flows and enforceable contracts
- Direct agreements establish notice, cure and step-in rights
- Security package components include shares, accounts, contracts and assets
- Reserve accounts protect debt service during operational volatility
- Lender step-in rights balanced against public service-continuity requirements
Participants can translate allocation decisions into contract provisions and negotiated positions.
- Risk matrix converted into draft project-agreement clause requirements
- Force majeure definitions distinguish political, natural and economic events
- Relief events, compensation events and termination events differentiated
- Change-control procedures govern scope, price and schedule adjustments
- Negotiation mandate defines objectives, concessions and approval limits
- Issue logs track unresolved risks through bid evaluation and contract close
Participants can operate a risk governance process after contract award and financial close.
- Contract-management plan assigns monitoring duties, meetings and reporting cycles
- Key risk indicators trigger intervention before performance deterioration
- Change register records variations, claims and emerging obligations
- Early-warning notices preserve contractual rights and response options
- Joint risk reviews reconcile authority and project-company risk positions
- Audit trails support accountability for material risk decisions
Participants can build, review and present a complete PPP risk management and allocation plan for a project decision.
- Project risk profile consolidates technical, commercial, fiscal and stakeholder exposures
- Risk register prioritises causes, consequences, owners and treatment actions
- Allocation matrix justifies retained, transferred and shared risk decisions
- Fiscal exposure analysis presents scenarios, guarantees and termination liabilities
- Contract-management plan defines indicators, governance and escalation arrangements
- Executive presentation defends recommendations against lender and authority challenge
Exercises and examples are adapted to each cohort's sectors and roles.