Course modules
19 modules over 10 daysParticipants can explain how project decisions affect biogas plant performance, safety and asset life.
- Biogas project stages from feedstock survey through operational handover
- Anaerobic digestion outputs: biogas, digestate, heat, electricity and biomethane
- Performance drivers linking feedstock quality, loading rate and gas production
- Plant boundaries, battery limits and utility interfaces defined clearly
- Roles of developer, designer, contractor, operator and independent engineer
- Key project documents: basis of design, specifications, drawings and manuals
Participants can assess whether available organic materials can support a viable digestion process.
- Feedstock categories: manure, food waste, crop residues, sludge and organics
- Sampling plans for representative solids, volatile solids and contaminant data
- Total solids and volatile solids calculations for feedstock blends
- Chemical oxygen demand used to estimate biodegradable organic matter
- Biochemical methane potential testing: purpose, limits and result interpretation
- Collection, reception and storage arrangements preventing feedstock deterioration
Participants can relate microbial process conditions to stable biogas production.
- Hydrolysis, acidogenesis, acetogenesis and methanogenesis within anaerobic digestion
- Mesophilic and thermophilic operation compared for stability and energy demand
- pH, alkalinity and volatile fatty acids interpreted together
- Ammonia, sulphide and long-chain fatty acid inhibition mechanisms
- Trace elements and nutrient balance supporting methanogenic activity
- Process upset indicators identified from gas, slurry and laboratory data
Participants can select a suitable digestion configuration for defined feedstock and energy objectives.
- Wet, dry, plug-flow and continuously stirred reactor configurations
- Batch and continuous feeding matched to feedstock handling characteristics
- Single-stage versus two-stage digestion process selection criteria
- Pre-treatment options: screening, maceration, pulping, pasteurisation and dilution
- Co-digestion blend selection using compatibility and loading constraints
- Process flow diagrams showing material, gas, heat and condensate streams
Participants can prepare preliminary material, gas and energy balances for a proposed plant.
- Daily feed mass calculated from collection records and design assumptions
- Organic loading rate calculated against active digester volume
- Hydraulic retention time derived from slurry flow and reactor volume
- Methane yield estimated from volatile solids destruction assumptions
- Biogas composition converted into lower heating value estimates
- Parasitic energy demand included for heating, mixing and pumping
Participants can develop preliminary sizing and equipment requirements for digestion and storage systems.
- Working volume, freeboard and gas space sized for process conditions
- Digester geometry compared for mixing, heating and construction practicality
- Mixing systems: mechanical, hydraulic and gas recirculation arrangements
- Heating loops, heat exchangers and boiler duties estimated
- Feed pumps selected using solids content, flow and head
- Digestate storage capacity matched to production and land-application windows
Participants can review site layouts and civil-work requirements against operational and safety needs.
- Site survey inputs: topography, geotechnical conditions, drainage and access
- Plant layout separates feedstock reception, process areas and vehicle routes
- Foundations designed around loads, settlement risk and groundwater conditions
- Concrete specification addresses sulphate exposure, watertightness and durability
- Secondary containment manages spills from feedstock and digestate tanks
- Drainage plans separate clean stormwater from contaminated process runoff
Participants can plan and inspect critical construction activities for digester integrity.
- Construction sequencing for excavation, foundation, walls, roof and testing
- Reinforcement placement checked against drawings, cover and joint details
- Concrete curing controls strength development and crack prevention
- Tank linings and coatings selected for chemical and abrasion resistance
- Water-tightness testing identifies defects before mechanical installation
- Inspection test plans define hold points and acceptance criteria
Participants can supervise installation requirements for pumps, mixers, valves and process piping.
- Equipment datasheets checked against process duty and installation requirements
- Pump alignment, baseplates and flexible connections prevent vibration damage
- Pipe materials selected for slurry abrasion, corrosion and temperature
- Piping slopes, cleanouts and isolation valves support maintainability
- Flange management and gasket selection prevent slurry and gas leaks
- Pressure testing and flushing procedures completed before operational handover
Participants can specify the main systems needed to handle, treat and use biogas safely.
- Gas holder sizing accounts for production variation and utilisation demand
- Condensate traps, drains and pipe slopes prevent liquid blockage
- Hydrogen sulphide removal using biological, iron-based and carbon media systems
- Siloxane treatment requirements assessed for engine and upgrading protection
- Combined heat and power interfaces: gas train, engine and heat recovery
- Biomethane upgrading options: membrane, water scrubber and pressure swing adsorption
Participants can define control, instrumentation and electrical requirements for reliable plant operation.
- Single-line diagrams identify supplies, protection, generators and critical loads
- Motor control centres specified for pumps, mixers and blowers
- Instrumentation selection for flow, pressure, temperature, level and gas composition
- PLC control narratives define alarms, interlocks and automatic sequences
- SCADA trends configured for production monitoring and fault investigation
- IEC 60079 hazardous-area classification informs electrical equipment selection
Participants can identify and control major safety and environmental risks at biogas plants.
- HAZOP guidewords applied to digestion, gas handling and flare systems
- Methane explosion hazards controlled through ventilation, zoning and detection
- Hydrogen sulphide exposure controls include monitoring and respiratory protection
- Confined-space entry permits address tanks, pits and enclosed process areas
- Emergency shutdown logic isolates gas, electrical and feed systems
- Odour, noise and fugitive methane controls incorporated into operating plans
Participants can organise construction oversight, interface management and contractor quality records.
- Work breakdown structures organise civil, mechanical, electrical and commissioning packages
- Construction schedules link long-lead equipment, access dates and testing milestones
- Method statements reviewed for lifting, excavation and confined-space work
- Request for information logs control drawing discrepancies and design changes
- Non-conformance reports document defects, corrective actions and closure evidence
- Progress inspections verify installed work against approved drawings and specifications
Participants can prepare a controlled plan for plant commissioning, biological start-up and handover.
- Pre-commissioning confirms cleaning, testing, calibration and mechanical completion
- Commissioning checklists verify equipment rotation, valves, instruments and interlocks
- Inoculum selection considers activity, transport, volume and contamination risks
- Start-up feeding ramps organic loading rate under defined monitoring limits
- Performance tests measure gas yield, methane content and equipment availability
- Handover dossiers compile drawings, certificates, manuals and training records
Participants can use operating data to maintain stable digestion and energy production.
- Daily operator logs record feedstock, temperatures, gas quality and alarms
- Control charts identify deviations in loading, pH and methane concentration
- Laboratory sampling frequencies set for alkalinity, acids and ammonia
- Feeding adjustments respond to volatile fatty acid accumulation trends
- Heat-balance checks identify insulation, boiler and heat-exchanger losses
- Gas production normalised against feedstock inputs for performance comparison
Participants can create maintenance plans for critical biogas plant assets.
- Asset registers classify digesters, pumps, mixers, blowers and instruments
- Criticality ranking combines safety, production loss, cost and repair time
- Preventive maintenance tasks scheduled by time, condition and operating hours
- Lubrication routes cover bearings, gearboxes, engines and valve actuators
- Vibration, temperature and oil analysis support condition-based maintenance
- Spare-parts lists define minimum stock, lead times and reorder points
Participants can diagnose common plant failures and plan safe corrective actions.
- Low gas production traced through feedstock, biology and equipment checks
- Foaming and scum formation addressed through loading and mixing changes
- Pump blockages investigated using solids, fibre and foreign-material evidence
- Gas leaks located through pressure testing, detection and joint inspection
- Corrosion failure modes assessed in gas piping and condensate systems
- Root cause analysis separates immediate faults from recurring system causes
Participants can plan digestate use and assess operational factors affecting project returns.
- Digestate characterisation covers nutrients, pathogens, solids and contaminants
- Storage and land-application plans match nutrient demand and seasonal restrictions
- Dewatering options compared for transport, storage and nutrient management
- Mass balances track nitrogen, phosphorus and carbon through treatment
- Operating costs classified by labour, energy, chemicals, maintenance and disposal
- Key performance indicators link availability, gas output, costs and emissions
Participants can build, review and present a complete biogas plant construction, commissioning and maintenance package.
- Feedstock assessment and design basis consolidated into project assumptions
- Process flow diagram and preliminary sizing checked against operating targets
- Site layout, civil interfaces and equipment schedule assembled
- Construction inspection test plan aligned with critical quality risks
- Commissioning sequence, operating records and maintenance plan integrated
- HAZOP actions, emergency controls and performance indicators reviewed
- Peer review tests technical consistency, practicality and risk controls
- Final project package presented with implementation priorities and decisions
Exercises and examples are adapted to each cohort's sectors and roles.