Course modules
10 modules over 5 daysParticipants can define a practical monitoring and control structure for a project.
- Project monitoring, control and evaluation roles within the project life cycle
- MS Project interface, views, tables and calendars for controlled schedules
- Project governance: baselines, tolerances, escalation routes and reporting cadence
- Defining measurable objectives through SMART criteria and logical framework assumptions
- Monitoring data sources, ownership, collection frequency and quality checks
- Distinguishing progress monitoring, performance evaluation and post-project benefits review
Participants can create a logically linked MS Project schedule suitable for monitoring and forecasting.
- Work breakdown structures aligned with deliverables, control accounts and work packages
- Enter tasks, milestones, durations and dependencies using precedence diagramming logic
- Apply FS, SS, FF and SF relationships with appropriate leads and lags
- Build calendars, constraints and deadlines without distorting critical path calculations
- Inspect network logic using Gantt Chart, Network Diagram and Task Inspector
- Validate schedule assumptions against the approved scope statement and WBS dictionary
Participants can model project resources and costs to support controlled forecasting.
- Create work, material and cost resources with standard rate tables
- Assign resources to tasks and interpret units, work and duration
- Model fixed costs, accrual methods and cost-rate table changes
- Identify overallocations through Resource Sheet, Resource Usage and Team Planner
- Level resources manually while protecting approved dates and critical activities
- Review resource demand against availability, skills constraints and procurement lead times
Participants can establish baselines and apply consistent rules for recording project progress.
- Set interim and approved baselines after schedule and budget validation
- Compare baseline, scheduled and actual fields through tracking tables
- Establish data dates and status dates for consistent reporting cut-offs
- Record actual starts, finishes, remaining duration and physical percent complete
- Choose percent complete, physical percent complete or milestone evidence appropriately
- Protect baseline integrity through authorised change control and version management
Participants can update project performance data and produce credible completion forecasts.
- Update task progress using timescaled views, task usage and status date
- Collect field progress using evidence rules, reporting calendars and data validation
- Recalculate remaining work after productivity changes, disruptions and revised forecasts
- Apply the 0/100, 50/50 and weighted-milestone progress measurement rules
- Separate actual performance, forecast estimates and approved baseline commitments
- Use the Tracking Gantt to isolate slippage, completed work and late tasks
Participants can calculate and interpret earned-value indicators for cost and schedule control.
- Earned Value Management terms: PV, EV, AC, BAC, EAC, ETC and VAC
- Calculate CPI and SPI from time-phased cost and progress data
- Interpret cost variance and schedule variance against established control thresholds
- Forecast completion costs using EAC formulas suited to variance causes
- Configure earned value methods for tasks, resources and project reporting
- Assess EVM reliability through baseline quality, timely actuals and objective progress
Participants can diagnose schedule delays and prepare proportionate recovery actions.
- Analyse critical path, near-critical paths and total slack using MS Project
- Trace delay impacts with driving predecessors, negative slack and deadlines
- Perform schedule compression through crashing, fast tracking and scope trade-offs
- Use Schedule Performance Index trends to trigger corrective action
- Maintain recovery plans with accountable actions, dates and forecast effects
- Escalate tolerance breaches through governance gates and exception reports
Participants can connect risk, issue and change controls to project schedule performance.
- Maintain risk registers linking threats, opportunities, owners and response actions
- Quantify probability-impact scores and connect residual risks to contingency allowances
- Monitor issue logs, action registers and decision records alongside schedule data
- Process change requests through impact analysis, approval authority and baseline updates
- Evaluate change effects on scope, cost, schedule, risk and benefits
- Link risk response tasks to the integrated MS Project schedule
Participants can produce evidence-based reports for project governance and evaluation purposes.
- Design KPI registers with definitions, targets, indicators, sources and owners
- Build status reports using dashboards, visual reports and filtered MS Project views
- Apply RAG criteria, control thresholds and exception-based management reporting
- Communicate forecast dates, cost exposure, risks and decisions for steering committees
- Produce variance narratives that distinguish causes, impacts, actions and decisions
- Evaluate outcomes using logical framework indicators, baselines and endline evidence
Participants can assemble a practical monitoring and control approach for an active project.
- Integrate scope, schedule, cost, risk and indicator controls into one plan
- Sequence weekly, monthly and stage-gate monitoring activities against governance requirements
- Create a monitoring and evaluation matrix aligned with project objectives
- Define data-quality checks for completeness, accuracy, timeliness and traceability
- Prepare corrective-action logs with owners, due dates and closure evidence
- Draft a 90-day control implementation plan for an active project
Exercises and examples are adapted to each cohort's sectors and roles.