Course modules
10 modules over 5 daysParticipants can classify costs and select defensible cost-estimation approaches for budget preparation.
- Cost objects, cost drivers and cost behaviour classified for budget models
- Separate fixed, variable, stepped and mixed costs using relevant ranges
- High-low method estimates variable rates and fixed cost components
- Scattergraphs and regression output test cost-estimation reliability before approval
- Direct and indirect costs traced using documented allocation bases
- Committed, discretionary and engineered costs linked to management decisions
Participants can apply appropriate costing methods to planning, pricing and resource-allocation decisions.
- Job, process and activity-based costing matched to decision purposes
- Activity cost pools and drivers assigned through ABC calculations
- Absorption costing applies predetermined overhead rates and capacity assumptions
- Marginal costing separates contribution decisions from inventory valuation requirements
- Cost-volume-profit analysis calculates break-even, margin of safety and target profit
- Relevant-cost analysis supports make-or-buy and special-order decisions under constraints
Participants can structure an integrated budget process using suitable planning methods and accountabilities.
- Strategic objectives translated into budget assumptions, drivers and accountabilities
- Master budget components connected through operating, capital and cash schedules
- Zero-based budgeting distinguishes decision packages from incremental spending requests
- Driver-based budgets connect volumes, headcount, capacity and service demand
- Rolling forecasts refresh planning assumptions without replacing approved budget authority
- Budget calendars define submission dates, challenge meetings and approval gates
Participants can create an approved, time-phased cost baseline with controlled assumptions and changes.
- WBS cost accounts align scope, responsibility and budget ownership
- Cost estimates assembled from quantities, rates, contingencies and escalation
- Bottom-up estimating reconciled with analogous and parametric cross-checks
- Time-phased cost baseline maps authorised spending to reporting periods
- Management reserves separated from contingency allowances and controlled through approvals
- Change-control logs preserve baseline integrity after authorised scope changes
Participants can build linked operating, production, resource and cash budget schedules.
- Sales budgets convert volume, price and mix assumptions into revenue
- Production budgets reconcile demand, inventory policy and capacity constraints
- Direct-material budgets calculate purchase quantities, prices and payment timing
- Labour budgets model staffing hours, pay rates and productivity standards
- Manufacturing-overhead budgets distinguish fixed commitments from activity-sensitive spending
- Cash budgets identify financing needs from operating and capital schedules
Participants can calculate and investigate variances using flexible budgets and standard costs.
- Flexible budgets restate allowable costs at actual activity levels
- Sales volume, price and mix variances isolate commercial performance
- Material price and usage variances trace purchasing and production causes
- Labour rate and efficiency variances identify workforce cost drivers
- Fixed-overhead spending and volume variances assess capacity utilisation
- Variance investigation thresholds focus management attention on material exceptions
Participants can use earned value data to assess project cost and schedule performance.
- Earned value management integrates scope, schedule and cost baseline data
- Planned value, earned value and actual cost calculated consistently
- Cost variance and schedule variance interpreted against approved control accounts
- CPI and SPI forecast project cost and schedule outcomes
- Estimate at completion uses BAC, ETC and performance indices
- Control account reports assign corrective-action ownership and due dates
Participants can update forecasts, test uncertainty and define measurable budget recovery actions.
- Monthly reforecasts combine actuals, approved changes and current risk assessments
- Run-rate analysis distinguishes temporary timing differences from structural overspends
- Scenario models test volume, inflation, exchange-rate and productivity sensitivities
- Corrective actions quantify savings, timing, owners and implementation risks
- Forecast accuracy tracked through bias, absolute error and variance trends
- Funding requests supported by quantified assumptions and documented trade-offs
Participants can establish clear budget-control responsibilities, evidence and management reports.
- Budget dashboards present actuals, forecast, variance and corrective actions
- Responsibility accounting assigns controllable costs to accountable managers
- Delegated authorities define spending limits, approvals and escalation routes
- Budget narratives distinguish factual results, judgements and proposed decisions
- Audit trails retain source data, assumptions, changes and approvals
- Internal controls address unauthorised commitments, duplicate coding and late accruals
Participants can assemble a practical budget-control approach for their own reporting responsibilities.
- Integrated budget model links operational drivers to financial outcomes
- Baseline review tests arithmetic, assumptions, ownership and approval evidence
- Variance response plan prioritises root causes, actions and decision dates
- Management pack combines performance commentary, forecast movements and funding implications
- Application plan specifies workplace data, stakeholders and first reporting cycle
- Peer review criteria strengthen clarity, traceability and decision usefulness
Exercises and examples are adapted to each cohort's sectors and roles.








