Course modules
16 modules over 10 daysParticipants can position a Black Belt project within business priorities, governance and ethical responsibilities.
- Lean Six Sigma roles, governance and Black Belt project accountabilities
- DMAIC tollgates, sponsor decisions and required project evidence
- Strategic objectives translated into measurable quality, cost, delivery and safety gaps
- Cost of poor quality categories: scrap, rework, warranty and complaints
- Project selection matrix scoring impact, feasibility, urgency and data availability
- Ethics, data integrity and escalation responsibilities within improvement governance
Participants can convert customer needs into measurable requirements and defined process boundaries.
- Voice of customer collection using interviews, complaints, surveys and observation
- Kano analysis separates basic, performance and attractive customer requirements
- CTQ trees convert customer needs into measurable process specifications
- Operational definitions align defect classification, counting rules and inspection decisions
- SIPOC diagram sets boundaries, suppliers, inputs, outputs and customers
- Requirements traceability links CTQs to metrics, owners and collection methods
Participants can map current performance and design a future-state process based on flow evidence.
- Swimlane maps expose handoffs, approvals, queues and rework loops
- Value stream maps distinguish processing time, waiting time and inventory
- Documenting current-state workflows with standard symbols and decision logic
- Process walk observations compare documented procedures with actual work
- Identify bottlenecks through cycle-time, queue-length and capacity-demand analysis
- Future-state design removes non-value-added steps and clarifies operating standards
Participants can establish a governed project with clear scope, ownership, benefits and stakeholder actions.
- Project charters define problem statements, goals, scope, roles and timing
- SMART problem and goal statements avoid solution-led project definitions
- Stakeholder analysis maps influence, interest, resistance and communication needs
- RACI matrix assigns accountable owners for decisions, data and actions
- Benefit statements quantify savings, cost avoidance, capacity and service gains
- Gate reviews test evidence quality before advancing DMAIC work
Participants can plan reliable data collection and evaluate the quality of measurement systems.
- Data collection plans specify sources, sampling, timing, ownership and safeguards
- Measurement system analysis separates repeatability, reproducibility, bias and stability
- Gage R&R studies assess measurement error against process variation
- Attribute agreement analysis tests inspector consistency for categorical decisions
- Sampling plans address population definition, representativeness and practical constraints
- Data integrity checks identify missing values, duplicates, outliers and coding errors
Participants can establish a statistically sound baseline and interpret process capability against specifications.
- Frequency plots, boxplots and run charts reveal distribution and time patterns
- Descriptive statistics summarise centre, spread, shape and unusual observations
- Normality assessment informs capability calculations and transformation decisions
- Process capability indices Cp, Cpk, Pp and Ppk interpreted correctly
- Defect metrics calculate DPU, DPMO, first-pass yield and rolled throughput yield
- Baseline performance establishes measurable improvement targets and financial exposure
Participants can generate, prioritise and verify potential root causes using process and data evidence.
- Stratification separates performance by product, channel, team, shift and supplier
- Pareto charts focus investigation on dominant defect categories and losses
- Cause-and-effect diagrams organise potential causes across six process categories
- Five Whys probes causal chains beyond symptoms and local fixes
- Is-is not analysis defines problem boundaries and discriminating facts
- Root-cause verification uses evidence, process observation and controlled testing
Participants can select and interpret statistical tests for process improvement questions.
- Confidence intervals quantify uncertainty around means, proportions and differences
- Null and alternative hypotheses frame testable improvement questions
- t-tests compare means for independent, paired and one-sample data
- Chi-square tests assess associations within categorical defect data
- ANOVA compares multiple group means while controlling false positives
- Nonparametric tests support skewed data, ranks and small samples
Participants can model process drivers and test factor settings for improved performance.
- Correlation analysis distinguishes association strength from causal evidence
- Simple and multiple regression model continuous process responses
- Residual diagnostics test linearity, independence, constant variance and normality
- Logistic regression estimates defect probability from process factors
- Factorial designs screen main effects and interactions efficiently
- Response optimisation identifies factor settings meeting target specifications
Participants can identify flow constraints and apply Lean methods to remove waste.
- Eight wastes identified through direct observation of work and information flow
- 5S workplace controls establish visual order, ownership and audit routines
- Standard work defines sequence, takt time and expected inventory
- Pull systems use Kanban signals, supermarkets and replenishment rules
- SMED analysis separates internal and external changeover tasks
- Poka-yoke methods prevent errors or make defects immediately visible
Participants can assess failure risks and define proportionate prevention and detection controls.
- Process FMEA ranks failure modes using severity, occurrence and detection
- Failure mode causes linked to controls, actions and accountable owners
- Risk priority decisions use action priority rather than scores alone
- Control selection distinguishes prevention controls from detection controls
- Mistake-proofing concepts address human error, omission and incorrect sequence
- FMEA updates reflect implemented actions, residual risk and verification results
Participants can build control systems that distinguish normal variation from actionable signals.
- Control plans specify CTQs, methods, frequency, reactions and record retention
- Statistical process control distinguishes common-cause from special-cause variation
- Xbar-R, I-MR, p and u charts selected by data type
- Control chart rules trigger investigation without tampering with stable processes
- Reaction plans assign containment, diagnosis, correction and escalation actions
- Layered process audits confirm standard work and control-plan adherence
Participants can plan, test and introduce improvements while managing operational adoption risks.
- Pilot plans define test scope, success criteria, safeguards and review points
- Kaizen events structure rapid improvement around a bounded process problem
- Implementation plans sequence actions, dependencies, owners, dates and resources
- Change impact assessments identify affected roles, procedures, systems and training
- Communication plans address sponsor updates, frontline adoption and resistance
- Benefits tracking compares validated results against chartered financial assumptions
Participants can apply DFSS concepts when process improvement requires a new design.
- Design for Six Sigma connects customer requirements to design parameters
- DMADV phases frame define, measure, analyse, design and verify work
- Quality function deployment translates CTQs into technical design requirements
- House of Quality compares customer priorities with engineering characteristics
- Design FMEA anticipates failures before release or process transfer
- Tolerance analysis balances functional requirements, variation and production cost
Participants can document analysis, validate benefits and communicate project decisions to leaders.
- Minitab workflows document analyses, graphs, outputs and reproducible project evidence
- Data visualisation selects displays suited to audience, decision and data type
- Executive storyboards connect baseline, causes, solutions, controls and benefits
- Financial validation separates hard savings, cost avoidance and revenue effects
- Project portfolio reviews prioritise active work against strategic capacity
- Black Belt coaching supports Green Belts through tollgates and analysis reviews
Participants can build, review and present a complete DMAIC project package for an operational problem.
- Complete DMAIC project package integrates charter, evidence, solutions and controls
- Baseline, analysis and improvement claims supported by traceable data
- Review teams challenge assumptions, calculations, risks and implementation readiness
- Financial benefits validated with operational owners and finance stakeholders
- Control plan, FMEA and reaction plan aligned to residual risks
- Present executive project story using concise visuals and decision requests
Exercises and examples are adapted to each cohort's sectors and roles.








