Course modules
16 modules over 10 daysParticipants can frame a Six Sigma project around customer requirements, measurable business need and accountable sponsorship.
- Six Sigma roles, project charters and business-case selection criteria
- Customer-critical requirements translated into CTQ trees and specifications
- Process owners, sponsors, belts and governance decision rights
- Cost of poor quality classified by prevention, appraisal and failure
- Voice-of-customer collection plans using interviews, complaints and service data
- Project scope boundaries stated through problem statements and goal statements
Participants can define process boundaries, operational measures and a credible data collection plan.
- SIPOC maps define suppliers, inputs, outputs, customers and boundaries
- Swimlane flowcharts expose handoffs, queues, rework loops and approvals
- Value-stream maps quantify processing time, waiting time and inventory
- Operational definitions remove ambiguity from defect classifications and measures
- Data collection plans specify sources, sampling, owners and frequencies
- Gemba observations record actual work sequences without assumed process steps
Participants can assess whether measurement systems and source data are suitable for analysis.
- Measurement system analysis distinguishes repeatability, reproducibility, bias and stability
- Gage R&R studies assess measurement variation before capability conclusions
- Attribute agreement analysis tests inspector consistency for categorical decisions
- Calibration records link instruments, tolerances, traceability and maintenance intervals
- Sampling plans balance confidence, inspection effort and operational disruption
- Data integrity checks identify missing values, duplicates and coding errors
Participants can establish a baseline using descriptive statistics and graphical analysis.
- Descriptive statistics summarise centre, spread, shape and unusual observations
- Histograms and box plots reveal distribution patterns and outliers
- Run charts distinguish routine variation from emerging performance shifts
- Pareto analysis ranks defect categories by frequency, cost and impact
- Stratification separates variation by product, shift, location or supplier
- Scatter plots test plausible relationships before formal statistical modelling
Participants can prepare an approved Define-phase pack for a focused improvement project.
- Project charters state problem, baseline, goal, scope and expected benefits
- Stakeholder analysis identifies decision-makers, affected teams and communication needs
- CTQ trees connect customer needs with measurable process requirements
- High-level process maps establish start points, endpoints and key interfaces
- Project milestones sequence Define, Measure, Analyse, Improve and Control work
- Risk registers identify data, resource, approval and implementation constraints
Participants can quantify process performance against specification limits and customer requirements.
- Normality assessment guides capability method selection and transformation decisions
- Calculate Cp, Cpk, Pp and Ppk against specification limits
- Capability baselines quantify defect risk, yield and sigma performance
- Non-normal capability methods address skewed, bounded and discrete data
- DPMO and rolled throughput yield compare multistep process performance
- Translate capability findings into financial and customer-impact statements
Participants can select, interpret and respond to control charts for process monitoring.
- Control-chart selection matches data type, subgrouping and production conditions
- Xbar-R and Xbar-S charts monitor continuous process variation
- p, np, c and u charts track attribute performance
- Western Electric rules identify signals requiring investigation and response
- Rational subgrouping separates within-subgroup noise from process movement
- Control limits differ from customer specifications and tolerance limits
Participants can identify, prioritise and verify root causes of process failure.
- Fishbone diagrams structure potential causes across people, methods, machines and materials
- 5 Whys tests causal chains beyond the first visible failure
- Cause-and-effect matrices prioritise input variables against CTQ requirements
- Failure mode and effects analysis ranks severity, occurrence and detection
- Process FMEA actions reduce high-priority failure risks before implementation
- Verify root causes with data rather than consensus or anecdotes
Participants can use hypothesis tests to evaluate whether observed differences are meaningful.
- Null and alternative hypotheses frame measurable improvement questions
- Confidence intervals express estimate precision alongside point estimates
- Two-sample t tests compare means before and after changes
- Proportion tests evaluate defect-rate differences between process conditions
- Chi-square tests assess associations within categorical defect data
- Practical significance complements p-values when selecting improvement actions
Participants can model relationships between process inputs and performance outcomes.
- Correlation analysis distinguishes association from evidence of causal influence
- Simple regression estimates output response to a single input
- Multiple regression models critical inputs while checking residual assumptions
- Interaction effects reveal conditions where factor influence changes
- Regression diagnostics identify outliers, multicollinearity and nonconstant variance
- Translate model results into controllable operating parameter ranges
Participants can plan controlled experiments to identify and optimise important process factors.
- Factorial designs test several input factors with efficient experimental runs
- Randomisation, replication and blocking protect experiment validity
- Screening designs identify vital factors among many candidate inputs
- ANOVA separates factor effects from experimental error variation
- Response surface methods optimise settings after factor screening
- Pilot protocols define safety, approvals, measures and stopping criteria
Participants can select, test and implement countermeasures supported by evidence.
- Generate countermeasures using kaizen, poka-yoke and standard work
- Solution-selection matrices compare benefit, risk, cost and implementation effort
- Future-state maps document redesigned flow, controls and expected gains
- Pilot plans specify hypotheses, baseline, measures, ownership and review dates
- Implementation plans sequence training, communications, resources and change control
- Benefit calculations validate savings, capacity release and service improvements
Participants can apply Lean methods to remove waste and improve process flow.
- Eight wastes expose non-value-adding activity within administrative and production processes
- 5S standards organise workplace conditions for reliable visual management
- Kanban signals control replenishment and limit work in progress
- SMED principles reduce changeover time through internal-external task separation
- Standard work documents sequence, timing, quality checks and escalation points
- Takt time aligns process capacity with customer demand rates
Participants can establish ownership, monitoring and response mechanisms that maintain process gains.
- Control plans specify CTQs, limits, sampling methods, responses and owners
- Reaction plans define containment, escalation and corrective-action responsibilities
- Visual management makes status, abnormalities and standards immediately visible
- Statistical process control sustains gains through scheduled chart review
- Standard operating procedures embed revised methods, controls and training
- Audit checklists test adherence, effectiveness and recurring risk signals
Participants can apply quality planning methods to new processes, products and services.
- DMADV distinguishes new-design work from DMAIC improvement projects
- Quality function deployment translates customer needs into design characteristics
- Design FMEA prevents risks before release or service launch
- ISO 9001 process approach links objectives, controls, evidence and review
- Supplier quality requirements define acceptance criteria, audits and corrective actions
- Management review metrics connect project results to quality objectives
Participants can build, review and present a complete DMAIC improvement project with evidence-based recommendations.
- Complete DMAIC project pack integrates charter, baseline, analysis, solution and controls
- Executive storyboard presents problem, evidence, savings, risks and ownership
- Peer review challenges assumptions, measurement validity and causal claims
- Control-plan review confirms monitoring frequency, response thresholds and accountabilities
- Implementation roadmap sequences pilots, approvals, communications and handover actions
- Present project recommendations using data, visuals and decision-focused language
Exercises and examples are adapted to each cohort's sectors and roles.








