Course modules
18 modules over 10 daysParticipants can select an appropriate Lean Six Sigma project and frame its business need.
- Lean and Six Sigma roles within continuous improvement governance
- DMAIC phases, tollgates and sponsor decision points
- Customer critical-to-quality requirements translated into measurable process needs
- Project selection matrix balancing benefit, feasibility, risk and sponsorship
- COPQ categories covering defects, rework, delays and excess capacity
- Green Belt responsibilities, team roles and escalation routes
Participants can create a project charter with clear scope, goals, stakeholders and customer requirements.
- Problem statements distinguishing symptoms, causes, scope and quantified impact
- SMART goal statements linked to baseline and target performance
- Project charters defining boundaries, milestones, roles and anticipated benefits
- Voice of Customer collection through interviews, complaints and service data
- CTQ trees converting customer needs into measurable performance requirements
- Stakeholder analysis identifying sponsors, process owners, users and resisters
Participants can describe a process boundary, sequence, ownership and customer outputs.
- SIPOC diagrams establishing suppliers, inputs, process, outputs and customers
- High-level process maps showing major steps and decision points
- Swimlane flowcharts clarifying handoffs, ownership and approval delays
- Gemba observation techniques for recording actual work and exceptions
- Rework loops, queues and failure points identified on process maps
- Process walk-through questions testing documented procedures against reality
Participants can identify non-value-added work and analyse process flow using Lean principles.
- Eight wastes: defects, overproduction, waiting, non-utilised talent and transport
- Inventory, motion, extra-processing and their service-process equivalents
- Value-added analysis using customer value, business value and waste categories
- Current-state value stream maps showing touch time, wait time and queues
- Takt time, cycle time and lead time distinguished clearly
- Constraint identification using capacity, demand and bottleneck evidence
Participants can build a defensible plan for collecting relevant and consistent process data.
- Measurement plans specifying metrics, sources, owners, timing and sampling
- Operational definitions removing ambiguity from defect and timing measures
- Data types: nominal, ordinal, discrete and continuous measures
- Sampling approaches using random, systematic and stratified selection
- Data collection forms designed for complete, usable process evidence
- Data integrity checks for missing values, duplicates and inconsistent codes
Participants can assess whether measurement systems are suitable for project decisions.
- Accuracy, precision, bias, linearity and stability in measurement systems
- Attribute agreement analysis for categorical inspection and review decisions
- Repeatability and reproducibility concepts for variable measurement studies
- Calibration records and traceability requirements for critical measurement equipment
- Inter-rater reliability risks in audits, quality checks and case reviews
- Measurement system findings incorporated into the project measurement plan
Participants can summarise process data and establish a meaningful performance baseline.
- Mean, median and mode selected for appropriate data distributions
- Range, variance and standard deviation describing process variation
- Histograms revealing distribution shape, spread, gaps and unusual values
- Box plots comparing groups, outliers and central tendency
- Baseline dashboards combining volume, defects, timing and cost measures
- Stratification by product, channel, team, supplier or customer segment
Participants can calculate defect-based metrics and interpret process capability against requirements.
- Defects, defectives, units and opportunities defined for project metrics
- First-pass yield and rolled throughput yield calculations
- DPU, DPMO and sigma level calculations from process data
- Specification limits distinguished from control limits and customer requirements
- Cp and Cpk interpreted for stable, capable processes
- Capability analysis limitations when data are unstable or non-normal
Participants can select and interpret charts that reveal variation, trends and special causes.
- Pareto charts ranking defect categories by frequency and impact
- Run charts detecting shifts, trends and non-random patterns
- Time plots revealing seasonality, batching and workload-related variation
- Scatter plots examining associations between process variables
- Individuals and moving range charts for continuous process data
- Attribute control charts selected for proportions, counts and defects
Participants can develop, organise and test plausible causes of process performance problems.
- Fishbone diagrams structuring potential causes by people, process and technology
- 5 Whys analysis tracing failure mechanisms beyond immediate symptoms
- Cause-and-effect matrices linking inputs to critical output requirements
- Affinity diagrams grouping observation, complaint and workshop evidence
- Process segmentation locating variation by time, source or transaction type
- Root-cause hypotheses stated as testable relationships between variables
Participants can use basic hypothesis tests to validate whether observed differences are meaningful.
- Null and alternative hypotheses framed around process improvement questions
- P-values, confidence intervals and practical significance interpreted together
- One-sample tests comparing baseline performance against target requirements
- Two-sample tests comparing teams, suppliers, channels or process methods
- Paired tests assessing before-and-after changes on matched cases
- Chi-square tests examining associations within categorical defect data
Participants can investigate relationships among variables and assess failure risks systematically.
- Correlation coefficients interpreted without claiming unsupported causal relationships
- Simple regression models estimating relationships between input and output variables
- Residual plots checking model fit, patterns and unusual observations
- FMEA scoring severity, occurrence and detection for failure modes
- Risk priority numbers used cautiously alongside management judgement
- Cause validation combining data analysis, observation and subject-matter expertise
Participants can generate, assess and select improvements that address validated root causes.
- Brainstorming rules producing diverse countermeasures without premature evaluation
- Benchmarking internal best practices against the current process
- Solution selection matrices comparing impact, effort, cost and risk
- Impact-effort grids prioritising quick wins and strategic improvements
- Future-state process maps showing redesigned flow and control points
- Assumption logs recording dependencies, constraints and unresolved decisions
Participants can apply Lean methods to reduce waste, improve flow and prevent errors.
- 5S workplace organisation for visual order, access and standardisation
- Visual management making status, priorities and abnormalities immediately visible
- Standard work defining sequence, timing and expected quality criteria
- Poka-yoke controls preventing errors or detecting them immediately
- Kanban signals controlling work release and limiting work in progress
- Pull systems matching upstream activity to downstream demand
Participants can plan, run and evaluate a controlled improvement pilot.
- Pilot charters defining scope, duration, measures, owners and success criteria
- PDCA cycles testing changes through planned observation and adjustment
- Implementation plans sequencing actions, resources, dependencies and approvals
- Change impact assessments identifying affected roles, systems and procedures
- Communication plans addressing sponsors, frontline teams and process users
- Pilot results compared against baseline using agreed performance measures
Participants can design controls that sustain improved performance after project closure.
- Control plans specifying measures, limits, frequency, ownership and response actions
- Standard operating procedures updated to reflect approved process changes
- Reaction plans defining escalation when performance breaches agreed thresholds
- Control charts used for ongoing monitoring of critical measures
- Training plans transferring revised work methods to process users
- Benefits tracking confirming financial, service and risk outcomes
Participants can manage Green Belt project reporting, stakeholder decisions and benefit claims.
- DMAIC tollgate reviews preparing evidence for sponsor decisions
- Project dashboards reporting scope, milestones, risks, metrics and benefits
- Benefit calculations separating hard savings, cost avoidance and capacity release
- RACI matrices assigning accountability for actions and control activities
- Executive summaries presenting findings, options, decisions and expected impact
- Storyboards structuring project evidence from problem through sustained results
Participants can build, review and present a complete DMAIC project pack for a defined operational problem.
- Project charter refined with sponsor, customer and financial requirements
- Current-state map and baseline metrics assembled into project evidence
- Root-cause analysis supported by stratification, charts and validated hypotheses
- Improvement options evaluated through risk, impact and implementation criteria
- Control plan linking measures, owners, limits and response actions
- Project presentation reviewed against DMAIC tollgates and decision requirements
Exercises and examples are adapted to each cohort's sectors and roles.








