Course modules
10 modules over 5 daysParticipants can diagnose production performance using lean principles, process measures and waste categories.
- Lean thinking, customer value and the eight wastes in production
- Distinguishing value-added, business-required and non-value-added work within process steps
- Genchi genbutsu observations that separate facts from assumptions
- Process capacity, takt time and cycle time relationships
- Little's Law applied to work-in-process and lead-time diagnosis
- Cost of poor quality linked to scrap, rework and warranty
- Lean maturity assessment using observable management and process conditions
Participants can map an end-to-end value stream and define a prioritised future-state design.
- Current-state value stream maps using material and information flow symbols
- Customer demand translated into takt time and pitch calculations
- Process data boxes capturing uptime, changeover, inventory and staffing
- Lead-time ladders exposing queue time, processing time and delays
- Information flows mapped from scheduling signals to production release
- Future-state design using supermarkets, pacemaker processes and continuous flow
- Kaizen bursts prioritised by impact, effort, ownership and timing
Participants can design flow and pull arrangements matched to demand, product mix and process constraints.
- Cellular layouts designed around product families and one-piece flow
- Line balancing with Yamazumi charts, takt compliance and work redistribution
- Kanban sizing from demand, replenishment lead time and safety factors
- Supermarket pull systems controlling replenishment between disconnected processes
- Heijunka boards levelled by volume and product mix
- CONWIP compared with Kanban for variable product routing
- Visual controls making abnormalities visible at the point of work
Participants can establish standard work and visual controls that support stable, repeatable production.
- Standard work combining takt time, sequence and minimum work-in-process
- Work combination tables balancing manual, walking and machine time
- Standardised work charts locating operators, machines and safety points
- Job instruction breakdowns separating major steps, key points and reasons
- 5S audits covering sort, set, shine, standardise and sustain
- Visual work instructions controlled through document revision discipline
- Leader standard work specifying layered audits and escalation routines
Participants can measure equipment losses and define reliability actions that improve productive capacity.
- Overall Equipment Effectiveness decomposed into availability, performance and quality losses
- Six big losses classified from downtime and production records
- Autonomous maintenance routines using cleaning, inspection and lubrication standards
- Planned maintenance triggers based on failure patterns and criticality
- Pareto analysis ranking chronic equipment losses by frequency and duration
- Downtime coding standards separating mechanical, material and operational causes
- Daily management boards linking OEE trends to countermeasures
Participants can build defect-prevention controls at critical points within a production process.
- Quality at the source preventing defect handoffs between process steps
- Poka-yoke devices designed for prevention, detection and shutdown
- Jidoka and andon escalation rules for abnormal condition response
- First-piece approval criteria controlling startup and changeover defects
- Layered process audits verifying control points and reaction plans
- Failure Mode and Effects Analysis prioritising prevention actions
- Control plans linking process characteristics, checks, owners and responses
Participants can investigate recurring operational problems and verify corrective actions against evidence.
- Plan-Do-Check-Act cycles structured around measurable improvement hypotheses
- A3 reports framing background, current condition, target and analysis
- Five Whys tested against evidence rather than assumed causation
- Fishbone diagrams organising potential causes across six manufacturing categories
- Pareto charts distinguishing vital few from trivial many defect causes
- Is-Is Not analysis narrowing problem boundaries and comparison conditions
- Corrective actions verified through effectiveness checks and recurrence controls
Participants can use statistical process control to distinguish common-cause variation from assignable causes.
- Measurement system analysis assessing repeatability, reproducibility, bias and resolution
- Variable control charts selected for subgrouped and individual measurements
- Attribute charts applied to defects, defectives and varying sample sizes
- Control limits distinguished from specification limits and customer tolerances
- Process capability calculated using Cp, Cpk, Pp and Ppk indices
- Out-of-control signals interpreted using Western Electric rules for action
- Reaction plans defining containment, adjustment, documentation and escalation steps
Participants can analyse changeovers and reduce setup time through SMED principles.
- SMED analysis separating internal and external changeover activities
- Changeover observations timed through element-by-element video or direct study
- External setup preparation staged before equipment stoppage begins
- Internal tasks converted through quick-release fixtures and preset tooling
- Parallel operations assigned using safe task sequencing and roles
- Changeover standards documenting settings, checks, tools and target times
- Small-lot economics balancing inventory reduction against changeover capacity
Participants can establish governance, measures and implementation priorities for sustained lean improvement.
- Daily tiered meetings connecting shop-floor abnormalities to management support
- Visual performance boards tracking safety, quality, delivery and cost
- SQDCP metrics aligned with operational targets and review cadence
- Kaizen funnel governance selecting ideas, owners, trials and benefits
- Leader gemba walks using standard questions and follow-up discipline
- Benefit tracking separating validated savings from projected improvements
- Ninety-day implementation plans sequencing pilots, measures, owners and reviews
Exercises and examples are adapted to each cohort's sectors and roles.