Course modules
20 modules over 10 daysParticipants can structure a GIS project around renewable energy development decisions.
- GIS decision questions for renewable energy screening, design and permitting
- Vector, raster and tabular data roles in energy project analysis
- Coordinate reference systems, datums and projected units for area calculations
- Geodatabases, feature classes and attribute domains for controlled project data
- Data lineage documented through source, date, resolution and licence fields
- Layer symbology and scale ranges for defensible stakeholder maps
Participants can match GIS outputs to development, permitting and investment decisions.
- Development-stage decisions from prospecting through construction and operations
- GIS evidence required for land acquisition and site-control discussions
- Pre-feasibility screening versus bankable resource and engineering studies
- Spatial inputs to environmental impact assessment and permitting submissions
- Investment committee questions answered through mapped project evidence
- Decision registers linking map outputs, assumptions and accountable owners
Participants can source, inspect and document data suitable for energy site screening.
- Authoritative sources for boundaries, infrastructure, terrain and protected areas
- OpenStreetMap features assessed against project-grade infrastructure requirements
- Raster resolution compared with minimum mapping-unit and siting decisions
- Positional accuracy, temporal currency and completeness tested before analysis
- Metadata records capture collection method, processing history and restrictions
- Data licences reviewed for commercial use, redistribution and publication limits
Participants can prepare consistent spatial datasets for renewable energy analysis.
- Reprojecting layers into an appropriate local projected coordinate system
- Clipping national datasets to project areas and study buffers
- Dissolving administrative boundaries while preserving essential planning attributes
- Field calculations standardise units, categories and coded constraint values
- Topology checks identify overlaps, gaps and invalid polygon geometry
- Geoprocessing models document repeatable inputs, parameters and output locations
Participants can derive terrain measures and identify constructability constraints.
- Digital elevation models selected by resolution, coverage and vertical accuracy
- Slope derived from elevation surfaces using percentage and degree outputs
- Aspect analysis identifies orientation conditions for solar array design
- Hillshade and contour mapping reveal terrain patterns for stakeholder review
- Terrain ruggedness indices distinguish developable land from complex topography
- Cut-and-fill implications interpreted from slope, elevation and site boundaries
Participants can assess land availability and competing land-use constraints.
- Land-cover classifications reclassified into developable, conditional and excluded categories
- Parcel boundaries joined with ownership, tenure and land-use attributes
- Agricultural land categories assessed against policy and food-security considerations
- Settlement buffers applied using locally appropriate setback assumptions
- Water bodies, wetlands and floodplains mapped as development constraints
- Contiguous developable polygons measured against minimum project footprint requirements
Participants can evaluate solar resource, orientation and shading factors for photovoltaic sites.
- Global horizontal irradiation mapped from validated solar resource datasets
- Direct normal irradiation interpreted for concentrating solar technology screening
- PVGIS outputs compared with local weather-station and satellite-derived records
- Slope and aspect thresholds defined for fixed-tilt photovoltaic arrays
- Viewshed-based shading analysis identifies terrain and obstruction effects
- Solar suitability scores combine irradiation, terrain, land and exclusion criteria
Participants can screen wind project areas using resource, terrain and setback criteria.
- Wind atlas layers interpreted by hub height, resolution and averaging period
- Mean wind speed distinguished from wind power density metrics
- Terrain exposure and roughness assessed for preliminary turbine siting
- Setback buffers applied around homes, roads, aviation and telecommunications assets
- Turbine layout constraints mapped using rotor diameter and spacing rules
- Wake-loss limitations recognised before detailed micrositing and energy-yield studies
Participants can apply GIS screening methods to non-solar and non-wind renewable options.
- Catchment delineation identifies upstream drainage areas for hydropower screening
- Stream order and flow proxies prioritise potential run-of-river locations
- Biomass feedstock catchments mapped using land-cover and transport-distance data
- Seasonal resource profiles compared for solar, wind and storage combinations
- Hybrid project footprints assessed for co-location opportunities and constraints
- Technology screening criteria aligned with resource quality and infrastructure access
Participants can assess interconnection proximity and infrastructure access using GIS.
- Transmission lines, substations and distribution feeders mapped from available records
- Euclidean distance estimates initial proximity to grid connection assets
- Least-cost path analysis identifies plausible transmission corridor alternatives
- Capacity data distinguished from physical proximity in interconnection screening
- Road-network analysis estimates access distances for construction logistics
- Infrastructure maps document uncertainty where network data remain restricted
Participants can identify environmental constraints requiring avoidance, mitigation or field verification.
- Protected areas classified by legal status, designation and management category
- Critical habitat screening considers species records, corridors and seasonal patterns
- Buffer zones applied around wetlands, watercourses and sensitive ecosystems
- Ramsar sites and Key Biodiversity Areas incorporated into exclusion models
- Cumulative constraint maps distinguish legal exclusions from survey priorities
- Environmental red flags documented for early developer and lender review
Participants can map social receptors, land rights and stakeholder considerations for site decisions.
- Population grids identify settlement density near proposed energy infrastructure
- Community facilities mapped for visual, noise and access impact screening
- Land tenure records assessed for ownership, customary rights and disputes
- Indigenous Peoples territories incorporated where authoritative spatial data exist
- Stakeholder influence-interest matrices linked to geographic project areas
- Social risk maps distinguish consultation priorities from formal exclusion zones
Participants can build and test a transparent renewable energy suitability model.
- Decision criteria translated into measurable spatial variables and thresholds
- Boolean exclusion masks remove legally prohibited and technically unsuitable areas
- Weighted linear combination ranks candidate locations using standardised scores
- Analytic Hierarchy Process compares criteria through pairwise weighting judgments
- Sensitivity analysis tests ranking changes under alternative weight scenarios
- Suitability classes validated against known sites and expert review
Participants can compare development scenarios and prioritise candidate renewable projects.
- Scenario layers represent policy, grid, land and environmental assumptions
- Alternative setback distances tested through parameterised geoprocessing models
- Candidate sites ranked by area, resource quality and grid distance
- Portfolio maps compare project clusters against regional demand centres
- Trade-off matrices record cost, risk, yield and permitting implications
- Uncertainty ranges communicated without overstating preliminary screening results
Participants can use satellite imagery for land-cover verification and project monitoring.
- Sentinel-2 imagery selected using acquisition date, cloud cover and resolution
- False-colour composites distinguish vegetation, water, bare ground and built surfaces
- Normalized Difference Vegetation Index supports vegetation and land-change interpretation
- Supervised classification separates land-cover classes using labelled training samples
- Change detection identifies construction progress and post-development land disturbance
- Image interpretation findings verified against ground data and higher-resolution imagery
Participants can design field verification plans that address critical GIS uncertainties.
- Field verification questions prioritised from uncertainty and project-risk registers
- Mobile data forms capture coordinates, photographs, observations and consent records
- Sampling locations selected across high-risk and representative map classes
- Global Navigation Satellite System accuracy recorded with each field observation
- Ground-truth results update land-cover, access and constraint interpretations
- Fieldwork safety plans address travel, weather, permits and communications
Participants can produce clear map products for technical, executive and community audiences.
- Map purpose defines scale, extent, audience and essential analytical message
- Colour schemes distinguish exclusions, constraints, opportunities and uncertainty classes
- Layout elements include projection, sources, date, legend and scale information
- Inset maps establish regional context and project location relationships
- Map series templates maintain consistent design across site assessment outputs
- Technical narratives explain methods, limitations, assumptions and decision implications
Participants can prepare GIS outputs for controlled sharing and management review.
- Web map layers configured with appropriate visibility, scales and pop-up fields
- Dashboards display candidate sites, constraints and screening performance indicators
- Role-based access controls protect sensitive land, grid and stakeholder information
- Feature services published with metadata, refresh schedules and ownership assignments
- Interactive filters support comparison by technology, region and development stage
- Data-sharing protocols define approved audiences, exports and update responsibilities
Participants can establish controls for repeatable and auditable renewable energy GIS analysis.
- Standard operating procedures define data intake, analysis and publication steps
- Version naming conventions distinguish source data, working files and deliverables
- Quality assurance checklists test geometry, attributes, projections and calculations
- Peer review examines assumptions, weighting logic and cartographic interpretation
- Reproducible workflows retain scripts, models, parameters and intermediate outputs
- Project archives preserve evidence required for investment, permitting and audit
Participants can build, review and present a complete GIS-based renewable energy site assessment and recommendation.
- Project brief defines technology, geography, decision criteria and stakeholder requirements
- Candidate area datasets assembled, documented and prepared for analysis
- Constraint masks and weighted suitability models produce ranked development zones
- Resource, terrain, grid and access findings integrated into site recommendations
- Quality review tests assumptions, limitations, uncertainty and map readability
- Executive map series and technical briefing present recommended next actions
Exercises and examples are adapted to each cohort's sectors and roles.