Course modules
17 modules over 10 daysParticipants can select a subcontracting approach aligned with project scope, risk and delivery constraints.
- Make-buy analysis for self-delivery, subcontracting and specialist package decisions
- Work breakdown structures separating deliverables, work packages and control accounts
- Packaging strategy based on market capacity, interfaces and risk allocation
- Procurement routes: competitive tender, negotiated tender, framework and direct award
- RACI matrix defining client, contractor, subcontractor and consultant responsibilities
- Interface maps tracing physical, technical, programme and information dependencies
Participants can define a measurable subcontract scope with clear boundaries, deliverables and acceptance criteria.
- Scope statements separating included work, exclusions, assumptions and constraints
- Technical specifications linked to drawings, standards, methods and tolerances
- Bills of quantities, schedules of rates and lump-sum pricing structures
- Acceptance criteria using inspection points, test plans and handover records
- Interface schedules allocating temporary works, access, utilities and coordination duties
- Document hierarchy resolving conflicts between drawings, specifications and subcontract conditions
Participants can assess prospective subcontractors using evidence-based capability and risk criteria.
- Prequalification questionnaires assessing competence, capacity, financial standing and compliance
- Financial due diligence using liquidity, solvency, turnover and cash-flow indicators
- Past-performance checks using references, completion records and defect history
- Supply-chain mapping identifying tier-two dependencies, single points and critical materials
- Health and safety competence assessed through policies, incident data and certifications
- Sanctions, anti-bribery and beneficial ownership checks before bidder shortlisting
Participants can run a transparent tender evaluation and make a defensible subcontract award recommendation.
- Invitation-to-tender packs defining instructions, returnables, deadlines and clarifications
- Weighted evaluation matrices combining technical, commercial, quality and safety criteria
- Bid normalisation comparing exclusions, qualifications, assumptions and pricing bases
- Clarification logs preserving equal treatment and an auditable tender record
- Abnormally low bid analysis using resource plans, productivity and cost breakdowns
- Award recommendations documenting evaluation evidence, approvals and residual risks
Participants can identify key subcontract clauses and align risk allocation with package controls.
- Flow-down clauses transferring relevant head-contract obligations to subcontractors
- NEC4 subcontract mechanisms for early warnings, compensation events and communications
- FIDIC principles covering notices, claims, variations and dispute avoidance
- Indemnities, limitations of liability, insurance requirements and consequential loss
- Payment terms addressing valuation, retention, set-off, tax and currency
- Termination provisions covering default, insolvency, convenience and demobilisation obligations
Participants can prepare a mobilisation plan that establishes controls before subcontract work begins.
- Kick-off agendas confirming scope, programme, interfaces, risks and communication routes
- Mobilisation checklists covering insurance, bonds, permits, personnel and equipment
- Submittal registers controlling drawings, method statements, samples and approvals
- Baseline programme review testing logic, durations, resources and critical activities
- Site induction requirements covering access, welfare, security and emergency arrangements
- Document control protocols defining revision status, distribution and acknowledgement records
Participants can coordinate subcontract programmes and manage dependencies affecting completion dates.
- Critical path method identifying controlling activities, float and completion exposure
- Look-ahead planning converting baseline schedules into weekly executable commitments
- Constraint logs recording access, design, materials, permits and predecessor dependencies
- Milestone schedules linking subcontract deliverables to payment and acceptance events
- Interface meetings resolving handovers between trades, disciplines and package boundaries
- Recovery programmes testing acceleration measures, resequencing and resource feasibility
Participants can measure subcontract progress using objective production, cost and schedule indicators.
- Earned value management calculating planned value, earned value and actual cost
- Schedule performance index and cost performance index interpreted for subcontract decisions
- Quantity tracking against bills, installed work and certified milestones
- Productivity dashboards comparing planned output, actual output and labour hours
- Weekly progress reports linking achievements, constraints, forecasts and corrective actions
- Traffic-light reporting with thresholds, owners, due dates and escalation triggers
Participants can control subcontract quality through planned inspections, records and corrective action.
- Inspection and test plans defining hold points, witness points and acceptance records
- ISO 9001 principles applied to subcontract quality planning and evidence
- Nonconformance reports recording defects, root causes, correction and verification
- Five Whys analysis distinguishing immediate causes from systemic quality failures
- Mock-up approval processes confirming materials, workmanship and finished standards
- Defects registers assigning rectification owners, dates and closure evidence
Participants can integrate subcontractors into project safety and environmental control systems.
- Permit-to-work systems controlling high-risk activities, isolations and authorisations
- Task risk assessments identifying hazards, controls, residual risk and supervision
- ISO 45001 responsibilities for consultation, competence, incident reporting and improvement
- Toolbox talks communicating changing conditions, critical controls and workforce feedback
- Environmental management plans addressing waste, spills, noise and protected areas
- Incident investigations applying barrier analysis, corrective actions and lessons learned
Participants can assess payment applications and maintain accurate subcontract cost records.
- Payment schedules aligning valuations, certification dates, retention and payment deadlines
- Measurement rules verifying completed quantities, approved rates and supporting records
- Payment application reviews reconciling progress, variations, materials and deductions
- Cash-flow forecasts incorporating certified work, retention releases and committed costs
- Cost-to-complete analysis comparing subcontract budget, forecast and approved changes
- Commercial registers tracking commitments, accruals, liabilities and disputed amounts
Participants can administer subcontract changes from instruction through valuation and implementation.
- Change registers recording origin, scope, notice status, valuation and approval
- Written instruction protocols preventing unauthorised site directions and scope creep
- Variation quotations separating labour, materials, plant, overheads and profit
- Time impact analysis assessing change effects on sequence and completion
- Change control boards reviewing authority, budget, programme and contractual entitlement
- Configuration management maintaining approved drawings, revisions and technical baselines
Participants can identify subcontract risks and implement proportionate recovery and escalation actions.
- ISO 31000 risk registers recording causes, events, impacts and treatment actions
- Probability-impact matrices prioritising schedule, cost, safety and quality exposures
- Early warning notices escalating emerging risks before material project impact
- Performance improvement plans setting targets, actions, owners and review dates
- Step-in rights, supplementary resources and replacement options assessed carefully
- Escalation ladders linking operational resolution, management intervention and formal remedies
Participants can preserve contractual position while seeking timely resolution of subcontract disputes.
- Notice registers tracking contractual deadlines, recipients, evidence and response status
- Contemporaneous records including daily reports, photographs, correspondence and meeting minutes
- Entitlement analysis connecting contractual clauses, causation, evidence and quantum
- Without-prejudice negotiations separating settlement discussions from contractual communications
- Dispute avoidance boards and adjudication routes under applicable contract terms
- Claims chronologies presenting events, notices, impacts, mitigation and outstanding issues
Participants can run structured subcontractor meetings that drive accountability and practical resolution.
- Meeting cadence linking daily coordination, weekly progress and monthly commercial reviews
- Action trackers assigning deliverables, owners, due dates and verification evidence
- Interest-based negotiation separating positions, interests, options and objective criteria
- Escalation protocols distinguishing routine issues, material breaches and executive decisions
- Supplier relationship segmentation based on criticality, dependency and performance risk
- Communication plans defining reporting formats, authority levels and decision channels
Participants can close a subcontract with complete records, accepted deliverables and documented lessons.
- Completion checklists covering commissioning, as-built records, training and spare parts
- Punch lists recording outstanding items, owners, deadlines and acceptance evidence
- Final account procedures reconciling contract sum, variations, claims and releases
- Retention release conditions linked to defects correction and contractual milestones
- Supplier scorecards assessing safety, quality, programme, commercial and relationship performance
- Lessons-learned reviews converting recurring issues into future tender and mobilisation controls
Participants can build, review and present a complete subcontract management pack for a defined project package.
- Package strategy setting scope boundaries, procurement route and allocation rationale
- Prequalification and evaluation criteria matched to package risks and market capacity
- Subcontract administration plan covering notices, records, meetings and authority levels
- Programme, performance and payment controls integrated into one reporting cycle
- Risk, change and claims registers supported by evidence and escalation routes
- Peer review testing completeness, practicality, contractual alignment and presentation quality
Exercises and examples are adapted to each cohort's sectors and roles.