Course modules
18 modules over 10 daysParticipants can establish clear client, consultant and contractor accountabilities for a project.
- Client, consultant and contractor roles defined through delegated authority schedules
- RACI matrix separating approval, review, supervision and delivery responsibilities
- Project governance boards, escalation routes and decision-rights registers
- Employer’s representative authority compared with contract administrator responsibilities
- Technical supervision boundaries that avoid directing means and methods
- Governance calendar linking reviews, certifications, reports and key decisions
Participants can select appointment approaches that match project risk and delivery needs.
- Design-bid-build, design-build and management contracting allocation of responsibilities
- Consultant appointment strategy for design, supervision and specialist assurance
- Packaging work scopes around interfaces, dependencies and market capability
- Selection criteria balancing technical quality, commercial terms and delivery capacity
- Pre-award clarifications converted into controlled contract documents
- Mobilisation requirements identified before consultant and contractor commencement
Participants can prepare scopes that define deliverables, boundaries and acceptance requirements.
- Terms of reference structured around objectives, deliverables, milestones and exclusions
- Work breakdown structure used to test scope completeness
- Deliverable acceptance criteria specifying format, reviewer and approval evidence
- Interface matrix allocating design, supply, installation and commissioning responsibilities
- Assumptions register separating client inputs from consultant and contractor obligations
- Scope gaps identified through document review and stakeholder challenge
Participants can interpret key contract clauses and identify their administration implications.
- FIDIC roles, notices, determinations and claims provisions examined
- NEC4 early warning, compensation event and programme mechanisms applied
- Lump sum, remeasurement and cost-reimbursable payment structures compared
- Priority of documents clauses resolving inconsistencies between contract documents
- Insurance, indemnity and limitation clauses reviewed for operational implications
- Contract data requirements translated into an administration action list
Participants can establish the records, plans and controls needed at contract start.
- Mobilisation checklist covering personnel, insurances, bonds, plans and permits
- Baseline programme reviewed against milestones, logic links and critical path
- Contract document register controlling drawings, specifications and issued instructions
- Kick-off meeting agenda confirming deliverables, communications and reporting cycles
- Approval tracker recording submissions, reviewers, due dates and decisions
- Baseline risk register assigning owners, responses and review dates
Participants can direct and assess consultant services against agreed outputs and standards.
- Consultant deliverable schedule aligned with stage gates and client decisions
- Design review workflow using comment logs and response matrices
- Technical assurance plans defining independent checks and approval thresholds
- Consultant timesheets assessed against authorised tasks and fee budgets
- Peer review findings converted into corrective action records
- Underperformance addressed through recovery plans, notices and escalation routes
Participants can verify that contractors are ready to begin work safely and contractually.
- Site possession conditions documented before contractor access and commencement
- Method statements reviewed against specifications, risks and permit requirements
- Key personnel approvals checked against contractual competence requirements
- Subcontractor approval process controlling capability, scope and accountability
- Temporary works responsibilities allocated through design and inspection records
- Mobilisation audit findings tracked through closeout action registers
Participants can assess whether reported progress supports realistic completion forecasts.
- Critical path method used to test programme logic and float
- Look-ahead plans connecting weekly activities with constraints and resources
- Physical progress measurement based on completed, accepted work quantities
- Earned value metrics calculating planned value, earned value and actual cost
- Schedule performance index interpreted alongside critical path movement
- Recovery programmes tested for sequencing, resources and feasible productivity
Participants can control inspection, testing and acceptance of contracted work.
- Inspection and test plans linked to hold points and witness points
- Quality assurance versus quality control responsibilities clearly distinguished
- Non-conformance reports recorded with cause, correction and verification evidence
- Material submittals assessed against specifications, samples and approved alternatives
- Factory acceptance and site acceptance tests planned with acceptance criteria
- Defects registers managed through ownership, target dates and closure checks
Participants can monitor contractor compliance with HSE and social contract obligations.
- HSE plan reviews testing hazards, controls, responsibilities and reporting
- Permit-to-work systems coordinated between client, contractor and site operators
- Incident reporting requirements linked to notification times and investigation actions
- Environmental management controls monitored through inspections and compliance records
- Labour, safeguarding and community obligations incorporated into performance reviews
- Corrective actions prioritised using severity, recurrence and exposure criteria
Participants can maintain records that support timely decisions and contractual evidence.
- Communication protocol defining authorised channels, recipients and response periods
- Meeting minutes recording decisions, actions, owners and contractual reservations
- Site diaries capturing labour, weather, access constraints and instructions
- Correspondence register tracking notices, submissions, replies and overdue actions
- Document control rules managing revisions, transmittals and approved-for-construction status
- Contemporaneous records assembled to support payment, change and claim decisions
Participants can run evidence-based reviews that improve consultant and contractor performance.
- KPI scorecards measuring safety, quality, schedule, cost and responsiveness
- Performance review agenda structured around evidence, trends and corrective actions
- Root cause analysis using five whys and fishbone diagrams
- Corrective action plans assigning owner, due date, evidence and escalation
- Supplier performance ratings separated from contractual rights and remedies
- Performance improvement notices framed around specific obligations and deadlines
Participants can review payment applications and maintain contract cost forecasts.
- Payment applications reconciled against measured work, milestones and supporting evidence
- Interim payment certificates checked for retention, deductions and previous payments
- Consultant fee claims assessed against deliverables, rates and authorised variations
- Cost report separates committed cost, forecast cost and approved budget
- Cash flow forecast updated from programme dates and payment terms
- Final account preparation begins through orderly valuation and record control
Participants can assess, authorise and record changes without losing contractual control.
- Change request form records scope, reason, cost, time and risk
- Variation evaluation distinguishes instructed change from contractor correction work
- NEC4 compensation event notices assessed against notification and quotation requirements
- FIDIC variation procedure applied to instruction, valuation and determination
- Change log tracks status from proposal through approval and implementation
- Unauthorised work addressed through written direction and commercial reservation
Participants can manage emerging risks and interfaces before they affect contract performance.
- Risk register links event, cause, effect, owner and response
- NEC4 early warning notices used to trigger risk reduction meetings
- Interface risks mapped between design packages, contractors and operational users
- Constraint log identifies decisions, information and access needed for progress
- Risk exposure prioritised through probability-impact scoring and trend analysis
- Contingency actions tested against contractual responsibility and available authority
Participants can evaluate claims and pursue proportionate dispute avoidance actions.
- Claim analysis tests entitlement, causation, quantum and contractual notice
- Notice requirements assessed against contract wording, dates and delivery evidence
- Delay analysis distinguishes critical delay, concurrent delay and disruption
- Claim records organised through chronology, correspondence and supporting contemporaneous evidence
- Without-prejudice negotiation prepared using interests, options and settlement authority
- Dispute escalation routes compared across adjudication, mediation, arbitration and litigation
Participants can manage serious performance failure and close contracts with controlled records.
- Default notices drafted around breaches, cure periods and required evidence
- Suspension decisions assessed for safety, access, payment and preservation duties
- Termination checklist addresses notices, inventory, records and site security
- Practical completion criteria distinguished from final completion and defect correction
- Handover dossiers include manuals, warranties, test records and asset data
- Lessons learned review converts recurring issues into future appointment controls
Participants can build, review and present a complete consultant and contractor management pack for a project case.
- Project brief analysed to identify contractual risks, interfaces and governance needs
- Scope matrix prepared with deliverables, acceptance criteria and responsibility assignments
- Contract administration plan assembled around notices, records and decision gates
- Performance dashboard designed using schedule, quality, cost and HSE indicators
- Change and claim controls tested against a developing project scenario
- Management pack presented for peer review, challenge and improvement actions
Exercises and examples are adapted to each cohort's sectors and roles.