Course modules
20 modules over 10 daysParticipants can define the materials management decisions, controls and information flows required for a product family.
- Materials management scope from demand signal through storage and consumption
- Plan, source, make and deliver responsibilities within the SCOR framework
- Material flow mapped across suppliers, receiving, stores, production and customers
- Decoupling points identified between make-to-stock and make-to-order operations
- Control tower decisions distinguished from transactional purchasing and warehouse activities
- Materials master data linked to planning, execution and financial reporting
Participants can assess demand inputs and select planning assumptions for material requirements.
- Independent demand separated from dependent demand within product structures
- Demand history cleaned for outliers, promotions, returns and one-off orders
- Forecast accuracy measured using mean absolute percentage error
- Bias identified through forecast-versus-actual variance analysis
- Demand horizons aligned with procurement, production and replenishment lead times
- Planning assumptions documented for seasonality, growth and demand uncertainty
Participants can assess the master data quality needed for reliable materials planning.
- Item master fields defined for planning, purchasing, storage and costing
- Units of measure reconciled across buying, stocking and production transactions
- Bill of materials levels checked for quantity, revision and component validity
- Routings and work-centre data connected to material timing requirements
- Lead-time components separated into supplier, transport, receiving and inspection time
- Planning data governance assigned through ownership, approvals and change control
Participants can segment inventory and assign differentiated review and control policies.
- ABC analysis classifies items by annual consumption value
- XYZ analysis groups items by demand variability and predictability
- Criticality analysis ranks service, safety and operational consequences
- Segmentation matrix combines value, variability and criticality criteria
- Cycle-count frequencies assigned to A, B and C inventory classes
- Control policies matched to stocked, non-stocked and consignment materials
Participants can calculate order quantities using demand, cost and operational constraints.
- Carrying cost components include capital, storage, risk and insurance
- Ordering cost estimated from requisition, purchasing, receiving and invoice activities
- Economic order quantity calculated using annual demand and cost inputs
- Quantity discounts assessed against holding-cost and obsolescence implications
- Minimum order quantities tested against consumption and storage constraints
- Lot-sizing rules compared for repetitive and intermittent demand items
Participants can set reorder points and safety-stock levels for selected material categories.
- Reorder point calculated from average demand during replenishment lead time
- Safety stock set for demand variability and lead-time uncertainty
- Service-level targets translated into z-scores for normal demand distributions
- Maximum stock levels established using review cycles and order quantities
- Min-max planning parameters tested against actual issue and receipt patterns
- Parameter exceptions identified through stockout, surplus and expedite records
Participants can build a baseline materials planning file for a selected product family.
- Product family scope defined by demand, process and inventory characteristics
- Demand profile translated into weekly material consumption requirements
- Current inventory position reconciled with open orders and allocated stock
- Supplier lead times validated against purchase order receipt history
- Initial reorder parameters calculated for priority purchased materials
- Baseline assumptions recorded within the materials planning file
Participants can connect aggregate demand and supply decisions to material planning requirements.
- S&OP cycle links commercial forecasts, supply capability and financial targets
- Aggregate demand translated into product-family volume and timing requirements
- Supply constraints classified by materials, capacity, labour and distribution
- Pre-S&OP scenarios compare inventory, overtime, subcontracting and allocation options
- Executive decisions converted into approved demand and supply plans
- Planning calendars align monthly S&OP with weekly materials reviews
Participants can construct a master production schedule that generates feasible material timing.
- Master production schedule converts aggregate plans into item-level commitments
- Available-to-promise calculated from inventory, scheduled receipts and planned production
- Time fences distinguish frozen, slushy and liquid planning periods
- Demand priorities assigned between customer orders, forecasts and strategic stock
- Rough-cut capacity checks test schedule feasibility before material release
- Schedule stability measured through changes, expedites and order rescheduling
Participants can run MRP logic to determine planned order releases and receipts.
- Gross requirements exploded through multilevel bills of materials
- Scheduled receipts netted against available inventory and safety stock
- Net requirements calculated by period using projected available balances
- Planned order receipts offset by lead time into releases
- Low-level codes sequence material planning across dependent components
- MRP exception messages prioritised for shortages, reschedules and cancellations
Participants can assess whether material and capacity plans can support required output.
- Capacity requirements planning converts planned orders into work-centre loads
- Finite capacity constraints identified for bottleneck resources and critical materials
- Material availability checks precede release of production and maintenance work
- Load profiles compare required hours with available resource capacity
- Constraint responses include resequencing, overtime, subcontracting and demand allocation
- Feasibility decisions documented with timing, cost and service consequences
Participants can convert material requirements into supplier schedules and purchase priorities.
- Purchase requisitions generated from MRP and replenishment planning signals
- Supplier schedules communicate quantities, dates, releases and delivery locations
- Blanket orders governed through release schedules and consumption visibility
- Supplier lead-time performance measured using requested and actual receipt dates
- Expediting priorities based on shortage impact, recovery options and customer commitments
- Order acknowledgements checked against quantities, dates and specification requirements
Participants can design warehouse controls that preserve stock accuracy and material availability.
- Receiving controls verify quantity, condition, documentation and purchase order status
- Put-away rules assign locations by velocity, size, hazard and handling needs
- Two-bin replenishment supports simple consumption-based material control
- Kanban cards signal replenishment quantities for repetitive internal demand
- Cycle counting investigates record variance, root cause and corrective action
- Inventory adjustments controlled through authorisation, evidence and audit trails
Participants can identify excess inventory and prepare disposition actions supported by evidence.
- Inventory ageing reports distinguish active, slow-moving and dormant stock
- Excess inventory calculated against forecast, demand history and replenishment commitments
- Obsolescence risks assessed from engineering changes, expiry dates and product discontinuation
- Disposition hierarchy covers redeployment, return, rework, sale and disposal
- Root-cause analysis traces excess stock to demand, parameters and procurement decisions
- Inventory reserve proposals supported by evidence, approvals and accounting requirements
Participants can build material risk controls for supply disruptions and critical shortages.
- Supply risk register captures probability, impact, owner and treatment actions
- Single-source exposure assessed using supplier, qualification and substitution data
- Critical material buffers sized against disruption duration and recovery lead time
- Dual sourcing evaluated for cost, quality, capacity and contractual implications
- Business continuity triggers define escalation thresholds and response responsibilities
- Shortage allocation rules protect contractual, safety and strategic demand priorities
Participants can create a materials scorecard that drives review and corrective action.
- Inventory turns calculated using cost of goods sold and stock value
- Days inventory outstanding interpreted alongside service and demand volatility
- Stockout rate measured by item, order line and customer impact
- Schedule adherence tracks planned versus actual production and supplier receipts
- Inventory accuracy reported from cycle counts and transaction reconciliation
- Daily and monthly review routines assign actions, owners and due dates
Participants can specify ERP planning parameters and governance controls for ongoing maintenance.
- MRP type selected for reorder-point, forecast-driven and dependent-demand materials
- Lot-size procedures configured for fixed, periodic and economic quantities
- Safety-stock fields governed through approval thresholds and periodic review
- Lead-time updates validated against supplier performance and receiving history
- Planning exceptions reviewed before parameter changes enter production systems
- Data stewardship roles maintain item, supplier and bill-of-material records
Participants can improve a materials plan by testing risks, constraints and corrective actions.
- Demand surge scenario tests safety stock and replenishment responsiveness
- Supplier delay scenario identifies shortages, alternatives and escalation requirements
- Forecast reduction scenario evaluates cancellation, rescheduling and excess-stock actions
- Capacity constraint scenario tests material release and production sequencing options
- Parameter sensitivity compares service, inventory value and order frequency
- Revised materials plan records decisions, owners, dates and expected outcomes
Participants can establish decision rights and review routines for coordinated materials management.
- RACI matrix assigns accountability for forecasts, parameters and supply exceptions
- Daily shortage meetings focus on recovery actions and customer commitments
- Weekly materials reviews reconcile demand, supply, inventory and supplier constraints
- Escalation paths distinguish operational decisions from executive trade-offs
- Change control protects planning stability after product or specification changes
- Meeting packs present exceptions, decisions, owners and completion dates
Participants can build, review and present a complete materials management plan for a defined product family or operating unit.
- Materials plan integrates demand, inventory, supply, capacity and risk assumptions
- Inventory policy specifies segmentation, service targets and planning parameters
- MRP output converted into purchase, production and replenishment priorities
- Supplier schedule and shortage actions address critical material constraints
- Performance scorecard defines measures, thresholds, owners and review cadence
- Peer review tests feasibility, financial implications and implementation actions
Exercises and examples are adapted to each cohort's sectors and roles.