Course modules
19 modules over 10 daysParticipants can map the decisions, data and control points in an end-to-end production planning system.
- Production planning decisions linked from demand signal to customer delivery
- Planning horizons, decision frequencies and ownership across operational control levels
- Push, pull and hybrid production systems compared using demand characteristics
- Customer order decoupling point and its effect on inventory positioning
- Plan, source, make and deliver flows mapped with SCOR terminology
- Core planning data: items, routings, bills, calendars and lead times
Participants can prepare a demand plan that combines historical patterns, customer intelligence and forecast error measures.
- Demand history cleaned for outliers, promotions, returns and one-off orders
- Moving average and exponential smoothing forecasts calculated from monthly demand
- Seasonal indices applied to forecast recurring peaks and troughs
- Mean absolute deviation and MAPE used to monitor forecast error
- Sales intelligence incorporated through documented forecast overrides and assumptions
- Demand plan segmented by product family, customer class and volatility
Participants can set inventory planning parameters appropriate to item value, variability and replenishment risk.
- ABC analysis prioritises control effort using annual consumption value
- XYZ classification distinguishes stable, variable and intermittent demand patterns
- Safety stock calculated from demand variability, lead time and service targets
- Reorder point set from expected demand during replenishment lead time
- Economic order quantity tested against storage, ordering and capacity constraints
- Cycle counting plans protect record accuracy for high-priority inventory items
Participants can develop an aggregate plan that balances forecast demand with workforce, inventory and capacity options.
- Product families formed using similar resources, demand patterns and planning needs
- Level, chase and mixed strategies compared against operating constraints
- Aggregate capacity calculated from staffing, shifts, utilisation and available hours
- Inventory build-ahead evaluated for seasonal demand and storage limitations
- Overtime, subcontracting and temporary labour assessed as capacity alternatives
- Rough cost comparison supports selection of an aggregate planning strategy
Participants can prepare an S&OP review that identifies demand-supply gaps and required management decisions.
- S&OP cycle aligns demand review, supply review and executive decisions
- Product-family demand compared with aggregate capacity and inventory projections
- Planning assumptions logged for prices, promotions, staffing and supplier availability
- Demand-supply gaps translated into choices requiring management approval
- Pre-S&OP meeting prepares scenarios, risks and recommended actions
- Executive S&OP decisions converted into accountable implementation actions
Participants can create a master production schedule that converts aggregate decisions into item-level supply commitments.
- Master scheduling selects end items driving material and capacity requirements
- Time-phased demand combines customer orders, forecasts and available inventory
- Projected available balance calculated across the master schedule horizon
- Available-to-promise quantities protect realistic customer commitment dates
- Demand time fences control changes close to scheduled production
- Planning time fences distinguish fixed, slushy and liquid schedule periods
Participants can assess product structure data and identify errors that distort material planning results.
- Single-level and multilevel bills represent parent-component relationships accurately
- Low-level coding determines correct sequence for MRP netting calculations
- Phantom bills simplify planning for non-stocked intermediate assemblies
- Planning bills support forecast-driven families and optional product features
- Engineering change control protects effective dates and revision accuracy
- Bill accuracy audits compare system structures with actual production requirements
Participants can calculate time-phased material requirements and interpret planned order recommendations.
- Gross requirements exploded from master schedules through multilevel bills
- Netting subtracts scheduled receipts and available inventory from gross demand
- Lot-for-lot, fixed-order and periodic-order quantities compared for material control
- Lead-time offsetting establishes planned order release dates for components
- Planned order receipts generate dependent demand at lower bill levels
- MRP exception messages prioritise expedite, defer, cancel and reschedule actions
Participants can align purchase planning with supplier capability, order policies and supply-risk controls.
- Purchase requisitions converted into supplier schedules and release instructions
- Supplier lead-time performance measured using promised and actual receipt dates
- Order coverage reports expose components at risk of production shortage
- Minimum order quantities reconciled with demand, storage and cash constraints
- Supplier capacity constraints escalated through documented shortage management routines
- Inbound delivery schedules synchronised with receiving capacity and production needs
Participants can test the master schedule against critical-resource capacity before releasing detailed plans.
- Critical resources identified from bottlenecks, long lead times and scarce skills
- Rough-cut capacity loads derived from master schedule quantities and standards
- Capacity profiles show weekly load against available critical-resource hours
- Overload resolution considers sequence changes, overtime, outsourcing and demand shifts
- Demonstrated capacity distinguishes theoretical equipment hours from achievable output
- Master schedule revisions documented after critical-capacity feasibility checks
Participants can calculate work-centre loads and evaluate capacity adjustments using routing and calendar data.
- Routings define operations, work centres, run times and setup times
- Capacity requirements calculated from planned orders and operation standards
- Infinite loading reveals total work demand before capacity constraint decisions
- Finite loading assigns work within available work-centre capacity limits
- Queue, move and wait times incorporated into manufacturing lead-time estimates
- Load reports identify overloaded work centres and timing of corrective action
Participants can sequence work orders using dispatching rules, due-date priorities and changeover constraints.
- Forward scheduling calculates completion dates from planned release dates
- Backward scheduling establishes latest feasible starts from customer due dates
- First-come, earliest-due-date and shortest-processing-time rules compared
- Critical ratio identifies orders requiring immediate scheduling attention
- Sequence-dependent setup matrix reduces lost capacity from product changeovers
- Gantt charts communicate machine loading, order sequence and schedule conflicts
Participants can protect constrained resources and improve flow using Theory of Constraints methods.
- Constraint identification uses throughput, queue length and utilisation evidence
- Drum-buffer-rope synchronises release rates with constrained-resource output
- Protective capacity placed before constraints and customer-facing operations
- Buffer management signals distinguish normal variation from urgent intervention
- Throughput accounting compares decisions using throughput, inventory and operating expense
- Constraint elevation options assessed after fully exploiting existing capacity
Participants can control released orders through accurate status reporting, dispatch lists and escalation routines.
- Order release authorises work only when materials, capacity and documents exist
- Dispatch lists rank work by due date, priority and resource availability
- Operation reporting captures starts, completions, quantities, scrap and downtime
- Work-in-progress visibility compares actual order status with planned progress
- Andon escalation triggers rapid response to quality, equipment and material issues
- Daily control meetings assign owners for delayed orders and recovery actions
Participants can incorporate quality losses, maintenance needs and operational reliability into production plans.
- Overall equipment effectiveness separates availability, performance and quality losses
- Preventive maintenance windows incorporated into work-centre capacity calendars
- Quality hold status prevents unavailable stock from appearing as usable supply
- First-pass yield adjusts material requirements for expected process losses
- Failure mode and effects analysis identifies planning-critical equipment risks
- Reliability data informs contingency capacity and recovery lead-time assumptions
Participants can build a balanced performance scorecard for planning accuracy, flow, delivery and inventory control.
- On-time-in-full measured against confirmed quantity and delivery-date commitments
- Schedule adherence compares completed production with frozen schedule requirements
- Plan attainment measures actual output against authorised production targets
- Inventory turns connect stock investment with annual material consumption
- Manufacturing cycle time tracks elapsed time from release through completion
- Daily visual boards display targets, actuals, losses and corrective actions
Participants can define data ownership, planning controls and exception workflows for ERP-supported operations.
- Item master governance assigns ownership for lead times and planning parameters
- Transaction discipline preserves inventory, order status and capacity-data accuracy
- ERP planning runs scheduled around cut-off times and data validation
- Exception dashboards separate urgent shortages from routine planning messages
- Change control records approved revisions to schedules, bills and routings
- Planning calendar defines review meetings, freeze points and escalation deadlines
Participants can assess production disruptions and develop structured recovery plans that protect customer commitments.
- Shortage triage ranks affected orders by customer, margin and delivery impact
- Recovery scenarios test overtime, resequencing, substitutes and alternate suppliers
- Material substitution requires approved specifications, quality checks and traceability
- Capacity loss quantified using downtime duration, backlog and recovery-rate assumptions
- Customer communication plans state revised dates, allocations and escalation contacts
- Post-incident reviews identify parameter changes and preventive control actions
Participants can build, review and present a complete production planning and control pack for a defined operating scenario.
- Demand forecast and assumptions assembled into an approved planning baseline
- Aggregate plan balances service, inventory, workforce and cost targets
- Master schedule demonstrates available-to-promise and time-fence control
- MRP and capacity analyses identify material shortages and overloaded resources
- Shop-floor dispatching plan specifies priorities, status controls and escalation rules
- Performance scorecard and recovery actions support management review presentation
Exercises and examples are adapted to each cohort's sectors and roles.